~cczr.ka.~~zv ra.~am~Ox ozwOX 8.~nOx SvSrnc REGULATOR% INFORMATION DISTRIBUTION YSTEM (RIDS) r '
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAWiA. Carolina Power & Light Co.
VAUGHNiG.E. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating Power Plant Unit 1 re~921013 epttr. 1992
- for Harris Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed. 05000400 ~
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/J~OLP /LPEB10 1 1 NRR/DOEA/OEAB 1 1 REC V%LE Ol 1 1 RGN2 1 1 EXTERNAL EG&G BRYCEg J H 1 1 NRC PDR 1 1 NSIC 1
'0 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
CNILL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project OCT ) g 1992 File Number: SHF/10-15505 Letter Number: HO-923029 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1992.
Yours very truly, G. E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc: Mr. S. D. Ebneter (NRC-RII)
Mr. R. G. Oehl (DOE)
Mr. J. E. Tedrow (NRC-SHNPP)
~s9210190271
<>t
~
~ 920930 PDR -"
ADOCK 05000400 R r s. r PDR MIS/DATAREP/1/OS4 ZEWrr'1/
~~
e
DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: September 1992 COMPLETED BY: Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 37.25 percent Availability Factor for the referenced month and a 33.78 percent Capacity Factor. There was one significant power reduction and one refueling outage in September. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 759 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. 182 of the spent fuel assemblies are from CP&L's Robinson Plant. In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.
MISKDATAREP$2%0S4
CPbL. CO RUM DATE 30/08/92 ~
gg'INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT PAGE RPD36-000 RUH TIME - 14:13:57 HARRIS UNIT 1 DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAM OPERATING STATUS TELEPHONE (919)362-2808 UNIT NAME: HARRIS UNIT 1 NOTES 2 ~ REPORTIHG PERIOD: SEPTEMBER 92 I 3 4 LICENSED THERMAL POWER <MWT): 2775 I See Operations Summary.
4, HAMEPLATE RATING (GROSS NWE): 950.9 I 5 4 DESIGN ELECTRICAL RATING (NET MWE): '900.0
- 6. NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I 7 i MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS <ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: N/A POWER LEVEL TO WHICH RESTRICTED IF AHY (HET NWE): 95/
REASONS FOR. RESTRICTION IF ANY: Due to problems with Governor Valve !/4, unit power was maintained at 95/ until the plant entered Refueling Outage number 4. The governor. valve will be repaired during the outage.
THIS YR TO CUMUL MONTH DATE ATIVE HOURS IH REPORTING PERIOD 720.00 6575.00 47496.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 268.22 5806.17 38794.17
- 33. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 I4. HOURS GENERATOR ON LINE 268.22 5777.05 38333.15 f5. UNIT RESERVE SHUTDOWN HOURS .80 .00 .00 f6. GROSS THERMAL ENERGY GEH. (NWH) 698101.20 (5539291.82 101535416.30 f7. GROSS ELEC. ENERGY GEH. (MWH) 231540.00 5197085.00 33798448.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 209)77.00 4852892.00 3)45)555.00 UNIT SERVICE FACTOR 37.25 87.86 80.70
- 20. UNIT AVAILABIL1TYFACTOR 37 25 87.86 80. 70
- 22. UNIT CAP. FACTOR (USING DER HET) 32.28 82.0$ 73.58
- 23. UNIT FORCED OUTAGE RATE .00 5.65 4.13 24* SHUTDOMHS SCHED OVER HEXT 6 MOHTHS (TYPES'ATEJ AND DURATION OF EACH):
Refueling Outage number 4 began on September 12, 1992 and is scheduled for completion November 21, 1992.
- 25. IF SHUTDOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF START 'UP: 11-10 (Init. Crit.)
- 26. UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MIS/DATAREF/3/OS4
E lf )
CPIlL,. CO iNT PERFORHANCE DATA SYSTEH PAGE
~.RUN 'DATE 10/08/92 APPEAR IX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIHE 14:13:57 KARRIS UNIT i DOCKET NO. 050-400 COHPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 SEPTEHBER DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (HWE-NET) (HWE-NET) 827 18 -f2 825 20 827 828 22 827 801 797 2$
798 27 36 t5 f.fh 8 MIS/DATAREP/4/OS4
h E
5 V
H UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 10/06/92 COMPLETED BY: A. P. Crenshaw TELEPHONE: (919) 362-2808 O
REPORT MONTH: September 1992 T1 R~ Method Cause & Corrective No. Date y Duration e of System Component Action to (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence P
e s Reactor'icensee Down Report ¹ 0
n 92416 920911 S 0.00 N/A ZZ ZZZZZ Unit ramped down in preparation for refueling outage 4 which commenced on 9/1 2/92 at 04:13.
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG%161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 -Same Source H-Other (Explain)
1>>
f~ ~
Ik 4r 4
~ ~
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 10/06/92 COMPLETED BY: A. P. Crenshaw TELEPHONE: (919) 362-2808 REPORT MONTH: September 1992 T' R~ Method Cause 8c Corrective No. Date Duration e of System Component Action to (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence P
e s Reactor'icensee Down Report ¹ 0
n 92%17 920912 451.78 N/A ZZ ZZZZZ Unit was shutdown for the scheduled cycle 5 refueling outage.
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG%1 61)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)