ML18010B077
| ML18010B077 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/31/1993 |
| From: | Crenshaw A, Vaughn G CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO931011, NUDOCS 9304190095 | |
| Download: ML18010B077 (9) | |
Text
1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM C.':9>>
AUTH. NAME REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM 9
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTHOR AFFILIATION (RIDS)
DOCKET 05000400 CRENSHAWPA. Carolina Power & Light Co.
UAUGHNPG.E. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Mont crating rept for Harris Nuclear Power Plant, unit tr.
1 /930415 DZSTR1BDTZON CODE: ZE24D COPTER RECETVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
I ENCL f SIZE:
NOTES:Application for permit renewal filed. o5ooo4oo RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD DOA 1 1 AEOD/DSP/TPAB 1 1 pNHR"'D S/OEAB 1 1 NRR/DRIL/RPEB 1 1 iREG FILE ol 1 1 RGN2 1 1 EXTERNAL EGStG BRYCE P J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
CONTROL DESK, PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT YOUR NAME FROM DISTRIBUTION ROOM PI-37 (EXT. 504-2065) TO ELIMINATE LISTS FOR DOCUMENTS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
0 a COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph ) 5 iSn File Number: SHF/10-15505 Letter Number: H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.
Yours very truly, G. E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc: Mr. ST D. Ebneter (NRC-RII)
Mr. J. E. Tedrow (NRC-SHNPP)
MIS/MTH-OPR.RPT/1/OS4
' 930'41'90095 93033i PDR 'ADOCK 05000400 R PDR
k DOCKET NO.: 050-400 DATE'arch UNIT:
COMPLETED BY:
Harris Unit 1993 Amanda Crenshaw 1
OPERATIONS
SUMMARY
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor. There were no significant power reductions.
There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools. 413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick, Plant. 224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPTX2%0S4
CPAL CO RUNDATE 04/06/93 O INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT PAGE RPD36-000
..RUH TIME 98:57:11 HARRIS UNIT 1 DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW OPERATING STATUS TELEPHONE (919)362-2808 UNIT NAME: HARRIS UNIT 1 NOTES
- 2. REPORTING PERIOD: MARCH 93 See 0 erations Summar
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9 I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 909.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 869.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: None.
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None.
- 10. REASONS fOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IH REPORTING PERIOD 744.88 2160.00 51865.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.09 2169.90 41728.90
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .08 .00
- 14. HOURS GENERATOR OH LINE 744.80 2160.00 41216.18
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .09 .00
- 16. GROSS THERMAL ENERGY GEH. (MWH) 2062488.78 5921066.34 109272171.78
- 17. GROSS ELEC. ENERGY GEH. (MWH) 699839.98 2018009.00 36432850.09
- 18. NET ELEC. ENERGY GENERATED (MWH) 657527.00 1894531.ee 33900207.00
- 19. UNIT SERVICE FACTOR 108.09 1ee.ee 79.47
- 20. UNIT AVAILABILITYFACTOR 100.00 198.80 79.47
- 22. UNIT CAP. FACTOR (USIHG DER NET) 98.29 97.46 72.62
- 23. UNIT FORCED OUTAGE RATE .09 .09 3.85
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OP R. RPT/3/OS 4
~ ~
(
g
.Cf bL CO ~NT PERFORMANCE DATA SYSTEM PAGE RUN.,DATE 04/06/93 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-999
.fAJN TIME 98:57:99 HARRIS UNIT 5
~ ~
DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 MARCH DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 886 879 885 886 884 889 88'8 889 888 20 887 884 880 877 876 882 24 879 885 25 882
)9 887 887 27 885 888 28 885 886 29 885 888 30 883 887 882 885
$ .16 8 MIS/MTH-OPR.RPT/4/OS4