ML18082B116
| ML18082B116 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/05/1980 |
| From: | Eckert R Public Service Enterprise Group |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009110323 | |
| Download: ML18082B116 (1) | |
Text
Richard M. Eckert Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8096 Senior Vice President Energy Supply and Engineering September 5, 1980 Mr. Oarrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Eisenhut:
LOW POWER TEST PROGRAM LICENSED OPERATOR TRAINING SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 A Low Power Test Program (LPTP) has been conducted on Salem Unit No. 2 for the purpose of training licensed operators and ful-filling the requirements Safety Evaluation Report, Salem Nuclear Generating Station, Unit 2, NUREG-0517 Supplement 4. All RO and SRO licensed individuals have received training with the excep-tion of the following:
J. Driscoll Chief Engineer - Salem
- c. Connor Station Planning Engineer L. Fry Station Operating Engineer J. Starcevich Shift Supervisor
- R. Macwatters Senior Shift Supervisor With the exception of Macwatters, who was on vacation, the four other individuals were not trained due to the unit being taken to Mode 5 on August 29, 1980, due to leakage from a control rod drive mechanism vent. Our present plan is to keep the unit in Mode 5 to perform installation work on fire protection dampers until such time as a full power license is imminent. We, hereby, commit to perform the LPTP training for these five individuals prior to Unit 2 exceeding 5% rated power.
If you have any questions concerning this matter, please feel free to contact us.
Sincerely, 800911*032..3 v