www.holtec.com HI-STORM 100 Amendment 15 Pre-Submittal Public Meeting
Agenda Discuss each proposed change included in proposed HI-STORM 100 Amendment 15 Proposed schedule www.holtec.com l Page 2
Proposed Changes HI-STORM 100 Version E Overpack HI-TRAC Version MS MPC-32M Changes to CoC Condition 3 Additional Minor Proposed Changes www.holtec.com l Page 3
HI-STORM Version E Overpack New HI-STORM Overpack version Similar to approved HI-STORM 100 Version B Overpack Variable height Overpack similar to approved HI-STORM FW Improved thermal performance Improved flood protection For all MPCs approved in HI-STORM 100 system and new MPC-32M www.holtec.com l Page 4
HI-TRAC Version MS New HI-TRAC version Similar to approved HI-TRAC VW version V (currently in HI-STORM FW)
Variable Weight to allow maximizing of shielding Variable Height Increased thermal performance Use with all MPCs approved in HI-STORM 100 system and new MPC-32M www.holtec.com l Page 5
MPC-32M Basket New basket Used with currently approved MPC Enclosure Vessel Basket made of Metamic-HT, same material as MPC-68M basket Variable Height system based on fuel length Evaluated for use in HI-STORM 100 Version E overpack only Use with standard HI-TRAC and HI-TRAC MS www.holtec.com l Page 6
Changes to CoC Condition 3 No change to HI-STORM 100 system design Allows sites with canisters loaded under various amendments to have one set of monitoring requirements for all canisters Applies only to canisters currently loaded under Amendments 2 through 7 Applies only to currently loaded systems Does not apply to future loadings www.holtec.com l Page 7
Additional Proposed Changes Additional Fuel Classes HI-DRIP Auxiliary Cooling System Partial Gadolinium Credit Clarify Source Term Methodology for Site Specific Evaluations Modified Long Term Storage Condition Ambient Temperature Horizontal HI-TRAC Transfer Non-Mechanistic Tip-over Shielding Analyses www.holtec.com l Page 8
Schedule
- Submittal planned for First Quarter 2019
- Expected 2 year review and approval www.holtec.com l Page 9