Proposed Tech Specs Re Emergency Response Facilities,Per Generic Ltr 82-33,Suppl 1 to NUREG-0737 & Reg Guide 1.97
ML20006F319
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/16/1990
From:
SYSTEM ENERGY RESOURCES, INC.
To:
Shared Package
ML20006F315 List:
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 9002270386
Download: ML20006F319 (1)


Text

'

18 -h O,*

9- NOVEMBER 1,1984 '

Attachment 1 SERI shall complete the following requirements on the schedule noted below:

Emeroency Response Facilities (Generic letter 82-33. NUREG 0737 5 5uDDlement 1. 55ER #5)

SERI shall implement the specific items below, in the manner described in  !'

+

MP&L letter (AECM-83/0232) dat'ed April 15, 1983, as modified in Mr&L letter (AECM-83/0446) dated August 22, 1983, no later than the following i specified dates: '

(a) Safety Parameter Display System (SPDS)

(1) Submit a safety analysis and implementation July 1985 plan to the NRC (2) SPDS fully operational and operator trained Prior to startup j following first  ;

refueling outage, i (b) Detailed Control Room Design Review (DCROR) I (1) Submit a program plan to the NRC December 1984  !

q (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation 4

(c) Regulatory Guide 1.97 - Application to Emergency Response Facilities (1) Submit a report to the NRC describing how the February 1985 i requirements of Supplement I to NUREG-0737 ,

have been or will be met. l (2) Implement (installation or upgrade) Prior to startup.

requirements of R.G. 1.97 with exception following first 1 of flux sonitoring and coolant level monitoring, refueling outage. -!

(3) laplement(installationorupgrade) Prior'to startup requirements of R.G. 1.97 for coolant level following second monitoring, refueling outage.

(4) Implement (installation or upgrade) Prior to startup_ ,l requirements of R.G. 1.97 for flux monitoring, following m... - 1 refueling outa e

~

j (d) Upgrade Emergency Operating Procedures (EOP's) g.

(1) Submit a Procedures Generation Package to the April 1985 l NRC.