Text
.. _ . . . _ _ _ ._ _ . _ . _ ___._ -__ _ _ _ _. - _ . _ _ _ _ . _ _ _ _ . _ _ . _ . - _
I i
i I VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT I
MONTH June YEAR 1982 i
l i
APPROVED:
1 l
/
h STATIONMANA%R 1
8208120150 820715 PDR ADOCK 05000338 R PDR
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes
- 1. Unit Name: North Anna 1
- 2. Reporting Period: June 1982
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 918
- 7. Maximum Dependable Capacity (Net MWe): 865
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 4,343 35,664
- 12. Number of Hours Reactor Was Critical 0 3,129.9 26,958.2
- 13. Reactor Reserve Shutdown Hours 0 21.5 256.4
- 14. Hours Generator On-Line 0 3,022.9 26,375.9
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 7,941,328 68,255,580
- 17. Gross Electrical Energy Generated (MWH) 0 2,537,888 21,783,410
- 18. Net Electrical Energy Generated (MWH) 0 2,396,973 20,519,889
- 19. Unit Service Factor 0 69.6 74.0
- 20. Unit Availability Factor 0 69.6 74.0
- 21. Unit Capacity Factor (Using MDC Net) 0 63.8 66.5
- 22. Unit Capacity Factor (Using DER Net) 0 60.9 63.4
- 23. Unit Forced Outage Rate 0 7.3 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance Outage 11-05-82 thru 11-15-82
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 08-03-82
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338
- UNIT NAME North Anna 1 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Scheitendorf TELEPHONE (703) 894-5151 X2502 Type Duration Reason 2 l
No. Date Method of Licensee System Component Cause & Corrective (Hours) Shutting **" Code Action to Down Reactor3 Report # *4 5 Prevent Recurrence 82-10 720 The scheduled refueling outage continues l
1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161) l E-Operator Training & License Examination 5-Load Reduction l F-Administrative 9-Other G-Operational Error (Explain) 5 l
H-Other (Explain) Exhibit H - Same Source
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTl! June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 _
5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 l
16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes
- 1. Unit Name: North Anna 2
- 2. Reporting Period: June 1982
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 939
- 7. Maximum Dependable Capacity (Net MWe): 890
- 8. If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 4,343 13,535
- 12. Number of Hours Reactor Was Critical 491.4 1,973.1 9,387.9
- 13. Reactor Reserve Shutdown Hours 8.5 54.9 1,688.1
- 14. Hours Generator On-Line 468.2 1,905.3 9,364.7
- 15. Unit Reserve Shutdown Hours 0 0 0 j 16. Gross Thermal Energy Generated (MWH) 960,712 4,687,916___ 23,470,757
- 17. Gross Electrical Energy Generated (MWH) 315,535 1,549,226 7,864,458
- 18. Net Electrical Energy Generated (MWH) 294,637 1,466,297 7,468,713
- 19. Unit Service Factor 65.0 43.9 69.2 l
- 20. Unit Availability Factor 65.0 43.9 69.2 1
- 21. Unit Capacity Factor (Using MDC Net) 46.0 37.9 62.0
- 22. Unit Capacity Factor (Using DER Net) 45.1 37.2 60.8 l 23. Unit Forced Outage Rate 1.8 5.9 15.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Fall Maintenance Outage 10-15-82 thru 10-25-82 l
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report # Prevent Recurrence 82-09 820611 S 243.3 C 4 NA NA NA Continuation of Refueling outage.
82-10 820611 F 4.7 B 1 NA NA NA Normal rampdown to generator off line to pe,rform turbine Overspeed test.
82-11 820616 F 3.8 B 1 NA NA NA Normal rampdown to generator off line to balance the turbine.
i i
i 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 420.0 2 0 18 657.3 3 0 19 736.1 4 0 20 833.1 5 0 21 849.4 6 0 22 862.0 7 0 23 820.8 8 0 24 839.0 9 0 25 856.5 10 0 26 851.9 11 82.8 27 862.7 12 201.7 28 862.7 13 213.8 29 871.4 14 209.8 30 874.3 15 206.7 31 0 16 165.1 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.