Text
r 7
- s Georg a Pom Commy
- 113 Petw1 Awnue Aran'a Georao 303C8 IfJe. (b(#G hjl[(h 6M2h
" ~
Maina h5 dss Posi 0+hre Bn 4545 An:rta Gecro a 3030 33 FER 3 P1: 2l Georgia Power Power Generation Department Mhkh*"
January 31, 1983 U. S. Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement RII: JPO Region II - Suite 2900 Inspection Reports 101 Marietta Street, NW 50-321/82-36 Atlanta, Georgia 30303 50-366/82-34 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:
The following information is submitted in response to Inspection Reports 50-321/82-36 and 50-366/82-34 concerning the inspection conducted by Mr.
A. L. Cunningham of your office on November 30 and December 6, 1982. One apparent violation and one apparent deviation were reported:
VIOLATION Environmental Technical Specification 5.3.2.2 requires that audits of facility activities shall be performed, at least, once a year under the cognizance of the SRB to ensure conformance of facility operation to all provisions of the Environmental Technical Specifications (ETS).
ETS-3.2, Table 3.2-), specifies the performance of an analytical program.
i Contrary to the above, audits of the analytical program were not l performed in 1980,1981, and 1982, through December 6,1982.
- This is a Severity Level IV Violation (Supplement II).
RESPONSE
Admission or denial of alleged violation: The violation occurred.
l Reason for the violation: The violation occurred because of the failure
' to fully develop and implement a formal program for accomplishing audits l of those portions of the environmental program contracted to three
{ vendors.
Corrective steps which have been taken and results achieved: Quality l Assurance Audits have been scheduled for the three vendors. These audits will be completed by February 28, 1983. The audits will be documented and any open-items treated per existing audit controls.
8302150431 830209 PDR ADOCK 05000321 0 PDR
r 7
Georgia Power d U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 2900
, January 31, 1983 Page Two RESPONSE (Continued)
Corrective steps which will be taken to avoid future violations: The Quality Assurance Program has been corrected to specifically call out these audits on an annual basis. With the environmental program vendor audits included in the audit scheduling program, these audits will be accomplished on the required annual schedule.
Date when full compliance will be achieved: Full compliance will be achieved with the completion of the vendor audits by February 28, 1983.
DEVIATION In a letter dated December 30, 1981, NRC Region II issued a Notice of Violation to the Georgia Power Company. The Notice identified a violation of Environmental Technical Specification 5.3.2.2, disclosed during NRC Inspection Nos. 50-321/81-24 and 50-366/81-24, for having failed to conduct audits of its analytical program. Georgia Power Company responded to the NRC citation in a letter dated December ' 30, l>81, describing certain corrective and preventive action taken or planned. The following statement was included in this letter:
By April 1, 1982, Georgia Power Company will develop a program to provide for annual QA audits of contractor activities related to the environmental monitoring. Implementation of this program will begin in April 1982.
Contrary to the above, as of December 6, 1982, the licensee had not developed a program to provide for annual QA audits of contractor activities related to the environmental monitoring.
RESPONSE
Corrective Actions The Quality Assurance Program has been changed to specifically call out the environmental program vendor audits on an annual basis. Vendor audits have been scheduled and will be completed by February 28, 1983.
700775
3
=
Georgia Power d U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 2900 January 31, 1983 Page Three RESPONSE (Continued)
The problem of failure to implement an identified commitment through full completion has been resolved by the development and staffing of the Regulatory Compliance department at Plant Hatch. This department began functioning (February 1982) after the commitments were made and these specific commitments were not tracked by Regulatory Compliance. Since February, one of the major responsibilities of this department is to track and monitor progress on NRC commitments. The current program is sufficient to preclude any future problems of this nature and no additional corrective actions are planned.
Very tru '
L. T. Gucwa 4
Chief Nuclear Engineer
/rra xc: J. T. Beckham, Jr.
H. C. Nix, Jr.