ML20070R608
| ML20070R608 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 04/30/1994 |
| From: | Reid D, Wallin G VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BVY-94-50, VY-RCE-94-012, VY-RCE-94-12, NUDOCS 9405200290 | |
| Download: ML20070R608 (6) | |
Text
_ . . -- . . . . .- . .- .. -- . . . . ... .
, VERMONT YANKEE
. NUCLEIR POWER CORPORATION
- MD. P.O. Box 157, Governor Hunt Road W vernon, vermont 05354-0157 Yq 'N / ') / (802) 257-7711
( %xy.
- m. .
d-' ..
,s May 10,1994 VY-RCE-94-012 BVY 94-50 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Reference:
a) License No. DPR-28 (Docket No. 50-271)
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vennont i
Yankee Nuclear Power Station for the month of April.1994.
Very truly yours, 2
Vennont Yankee Nuclear Power Corp.
N V-y i.
1-Donald A. Reid Vice President, Operations cc: USNRC, Region I USNRC Resident inspector, VYNPS
.c 9405200290 940430 PDR ADOCK 05000271 - l#
Y I
'g '
.R PDR '
W OUUUd
, . 1 l
i l
l 1
VERMONT YANKEE NUCLEAR POWER STATION MONTIIIJ STATISTICAL REPOl(T 94-04 FOlt TIIE MONTil OF APRIL 1994 DP 0411 Rev. 5 Page 1 ofI
w
, OPERATING DATA REPORT F
DOCKET NO 50-271 DATE 940510 COMPLETED BY G.A. WALLIN
- TELEPHONE (802)257-7711 OPERATTELETATHS
- 1. Unit Name: yfrmont YalDlLQ2
- 2. Reporting Period: April NOTES:
- 3. Licensed Thermal Power (MWt):1593
, 4. Nameplate Rating (Gross MWe) : 51Q
- 5. Design Electrical Rating (Net MWe) : 114 (oc) 504(cc)
- 6. Maximum Dependable Capacity (Gross MWe) : 111 l
7.-Maximum Dependable Capacity (Net MWe): 1Q4
- 8. If changes, occur in capacity ratings (Items Number 3 through 7) since
- last report, give reasons:
N/A t
- 9. Power level to which restricted, if any(Net MWe): N/A
- 10. Reasons for restrictions, if any: N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 719.00 2879.00 187703.00 a 12. Number Of Hours Reactor was Critical 678.12 2838.12 154055.53
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 667.82 2822 17
. 150937.79
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1955857.00_ 4455498.00 225161169.50 17 Gross Electrical Energy Generated 357363.00 1509118.00 75028500.00 '
i 18. Net Electrical Energy Generated (MWH) 343697.00 _1451057.00 71298081.00
- 19. Unit Service Factor 92.88 98.03 79 62
'2 0. Unit Availability Factor 92.88 98.03 79.69
- 21. Unit Capacity Factor (Using MDC Net) 94.85 100.00 74.69
- 22. Unit Capacity Factor (UJing DER Net) 133.00 98.06 73.23
- 23. Unit Forced Outage Rate 7.12 1.97- 5.12
- 24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of 4
Each: N/A
- 25. If shut down at end of report period, estimated date of startup:N/A
- 26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved ,]
INITIAL CRITICALITY l INITIAL ELECTRICITY l COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 5 Page 1 of 1 RT No. 13.F01.19F 1
--_.._._. . .. _ . . . . ~ . _ _ . . _ _.m..m__.-.__ .
)
.' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-'271 UNIT Vermont Yankee DATE 240510 COMPLETED BY G.A. WALLIN TELEPHONE _(802)257-7711 MONTH Apr,il__ l i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I (MWe-Net) (MWe-Net) I l
- 1. 519 17, 520
- 2. 519 18. 520
- 3. 496 19. 520 I
- 4. 518 20. 520
- 5. 518 21. 520
. 6. 517 22. 520
- 7. 517 23. 520
- 8. 51.& 24. 519 i
- 9. 518 25. 520
- 10. 29 26. 519
- 11. 0 27, 520 1
- 12. 308 28. 519 1
l 13, 516 29. 518 !
I
! 14, 518 30. 519 l l
- 15. 520 31. ---
16, 52.0 *23 hour day INSTRUCTIONS On this format, list the average daily unit power level in MWE-Net for each day in the reporting month. Compute to the nearest whole megawatt. ,
l VYDPF 0411.02 '
l DP 0411 Rev. 5 Page 1 of 1 RT No. 13 F01.18V 1
I
. , , . . - . ~ . . - . . _ . , _ . . - , . . - . . . . _ _ . _ _ . _ . . _ . _ . . - , . - - - _ _ . - - . _ _ _ _ . , . . - - . - _ - - .-- -..-l
,- I
~
, - l UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH APRIL DOCKET NO 50-271 -
f UNIT NAME Vermont Yankee F 4
DATE 940510 1
COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 '
1 2 3 4 5 ,
4 No. Date Type Duration Reason Method of License System Component Cause and Corrective E
! (hours) Shutting Event Code Code Action to Prevent i Down Report # Recurrence
- Reactor >
94-04 940410 F 51.18 A 3 94-04 HA VALVEX "C" moisuture separator high level.
i Turbine tripped and j a reactor scram.
I Replaced a faulty level cont]oller.
1 F: Forced 2 Reason: 3 Method: 4 Exhibit G- Jnstructions
, S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparacion of Data ,
B-Maintenance or Test 2 - Manual Scram Entry Sheets for License j C-Refueling 3 - Automatic Scram Event Report (LER) File D-Regulatory. Restriction 4 - Other (Explain) (NUREG 0161)
E-Operator Training and l License Examination 5 Exhibit I - Same Source
- .VYDPF 0411.03 F-Administrative. ;
- DP 0411 Rev. 5 G-Operational Error (Explain) f Page 1 of 1 H-(Explain) s i
1
,y- ,
. ~ - . - . - .. .-. . . _ . .. ... . . . . . -_ . - .. - - .
'.' DOCKET'NO. 50-271 l d
.DATE 230510 l
.' COMPLETED BY G.A. WALLIN l TELEPHONE (802)257-7711 l
[ REPORT MONTH April
- SJJMMARY OF OPEBATING EXPEFJEE.CfES Highlighte Vermont Yankee operated at 92.2% of rated thermal power for the' month.
' Gross electrical generation was 357.363 MWHe or 92.0% design electrical
- capacity.
i Operating Summary i
-The following is a chronological description of plant operations including other pertinent items of interest for the month:
- At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
940410 At 0122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br />, turbine tripped and reactor scrammed, caused by a 4
high level signal in the "C" moisture separator. (See Unit Shutdowns and Power Reductions) 940411 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, the reactor was critical following repairs; 940412 At 0433 hours0.00501 days <br />0.12 hours <br />7.159392e-4 weeks <br />1.647565e-4 months <br />, the turbine-generator was phased to the grid, and 3
a return to full power was initiated.
-f
.i i
l 1
. i At the end of the reporting period the plant was operating at 99.9% of.
rated thermal power.
VYDPF 0411.-04 DP 0411 Rev. 5 )
Page 1 of 1 l RT No. 13.F01.18X I
__ _ _ ._ _ _ _ ._ _ ._~ _ __ _-. . _ _ . .._ _ _ __ . . .