Monthly Operating Rept for Apr 1983
ML20076H062
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/01/1983
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
IP-LK-1325, NUDOCS 8306160385
Download: ML20076H062 (7)


Text

. . -

e ,.

OPERATING DATA REPORT

' DOCKET NO. 50-286 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (9141 739-8200 OPERATING STATUS Notes

1. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: Ar'ril 1983
3. Licensed Thermal Power (MWt): 3025
4. Nctr.eplate Rating (Gress MWe): 1013
5. Design i.lectrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net .MWe): 891
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 719 2879 58,440.0 0 0 34,090.8
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours o o n.o
14. Hours Generator On.Line 0 0 32.913.1
15. Unit Reserve Shutdown Hours 0 0 0.0
16. Gross Thermal Energy Generated (MWH) 0 0 86.141.4n1_o
17. Gross Electrical Energy Generated (MWH) 0 0 26.298.300.0
18. Net Electrical Energy Generated (MWH) 0 0 25.193.441 0
19. Unit Service Factor 0 0 56.3
20. Unit Availability Factor 0 0 56.3
21. Unit Capacity Factor (Using MDC Net) 0 0 as.4
22. Unit Capacity Factor (Using DER Net) 0 0 44.7 0
23. Unit Forced Outage Rate 0 14.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:

Upon completion of scheduled 25 If Shut Down At End Of Report Period. Estimated Date of Startup: Maintenance n e_ navn annn 1983.

26 Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ,

COMMERCI AL OPERATION 8306160385 830501 Il PDR ADDCK 05000286 R PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MON 111 April 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LE\ EL IMWe-Net) (MWe-Net) 1 0 g7 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 O 23 0 10 0 26 0 1I O 27 0-12 0 23 0 13 0 29 0 14 0 30 0 15 0 31 16 0 INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

O +

50-286 .,

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME NO. 3 DATE May 1, 1983 REPORT MONT1f April 1983 COMPLETED BY L- Kelly TELEPHONE 914-739-0200 re.

2 -

=

.2 _e ra E

.3 to 3 2 C 'A Eicensee ct 5"

c. Cause & Corrective No. Date g 3g g ,g g 5 Event 5'-E E.3 Action to

$E $ j di g Report # <N C jU Prevent Recurrence d

n 04 82/03/25 s 719 B&C N/A N/A N/A Unit in a scheduled cycle III-IV Refueling and Maintenance Outage.

I 2 3 4 F: Forced Reason: Method: Exhibit F-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3. Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5 G-Operational Error (Explain) Exhibit II- Same Source (9/77) Il-Ot her ( E xplain )

e .

MONTHLY MAINTENANCE REPORT April 1983 MONTH MWRI DATE EQUIPMENT MALFUNCTION CORRECTlVE ACTION 3483 4-D4-83 Emergency Diesel Generator Inlet seals leak Replaced seals

  1. 32 Lube Oil Pump 3429 4-06-83 Check Valve 897A Gasket leak Peplaced gasket 3544 4-11-83 Fan Cooler Unit #32 Spool Gasket leak Replaced gasket Piece 3550 4-13-83 Component Cooling Pump #32 Breaker malfunction Adjusted switch 480 Volt Breaker 3555 4-18-83 Pressurizer Block Valve Torque switch malfunction Replaced torque switch MOV-536 3465 4-22-83 Auxiliary Boiler $eed Joint leak Rewelded Pump #33 Recirculation Line 3558 4-25-83 Fan Cooler Unit #35 Service Broken Spur Gear Replaced gear Water Inlet Valve-SWN 41E 3560 4-25-83 Fan Cooler Unit #35 Air Line Air line leak Replaced tubing to Damper B -

t 3567 4-26-83 Purge Exhaust Valve PCV-ll70 Improper indication Replaced limit switch Position Indicator 3292 4-27-83 - Weld Channel Rack 18 Test Leak at Fitting Replaced fitting Connection

3 H N 8 T O 9 N I 1 O T M C l A i

r E p V A I T

C E

R R

O C

T R

O P

E R

I Y

R N O O G I E T T C A N C U F

C L A

& M I

Y L

H e T

N O

M T

N T E R M O P P I E U R Q

E O T

G N

I I

I T

O N

E T

A D

I R.

W

4

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

Unit repairs, modifications and preventive maintenance are proceeding as scheduled.

Steam generators girth welds have been completed, s

0

e POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. BOX 215 8UCHAN AN. N. Y.1o511 T E L.s PMo N c: 914 739.82o0 May 9, 1983 Y IP-LK-1325 Dochet No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of April, 1983.

Very truly yours, 5

John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James A. Allen, Acting Regional Administrator Office of Inspection and Enforcement

-Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle

l INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339