ML20080A574
| ML20080A574 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/30/1983 |
| From: | Fuller C, Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| P-84037, NUDOCS 8402060129 | |
| Download: ML20080A574 (2) | |
Text
f . TSP- 3 A t t a ch rE n t
- 33
'
- Issui 2 OPERATINC DATA REPORT DOCKET NO. 50-267 DATE December 12,I1983 CcMPLETED BY Chuck Fuller TEl.EPHONE (303) 785-2224 OPERATINC STATLG notes
- 1. Unit Name: Fort St. Vrain
- 2. Reporting Period: 831101 thru 831130
- 3. Licensed Thermal Power (Wt): 842
- 4. Nameplate Rating (Cross We): 342
- 5. Design Electrical Rating (Net We): 330
- 6. Maximum Dependable Capacity (Cross We): 342
- 7. Maximu:n Dependable Capacity (Net We): 330
- 8. If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
None
- 9. Power Level To Which Restricted If Any (Net We): 231
- 10. Reasons for Restrictions, If Any: Restriction to 70% pendine recolution of contractual matters.
This Month Year to Date Cu:nulative 720 8,016 38,737
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor Vas Critical 666.0 5.377.0 25,123.7 ,
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on-I.ine 553.0 3,957.I 17,131.6 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (WH) 314,465.8 2.183.434.1 9.124.419.5*
- 17. Cross Electrical Energy Generated (WR) 100,999 696.083 3.022.987
- 18. Net Electrical Energy Generated (WR) 93,334 626,197 2,749,307
- 19. Unit Service Factor 76.8 49.4 44.2
- 20. Unit Availability Factor 76.8 _ 49.4 44.2
- 21. Unit Capacity Factor (Using MDC Net) 39.3 23.7 21.5 y $ 22. rait Capacity ractor (esing DER Net) 39.3 23.7 21.5
- O 23.2 50.6 40.7
-O 23. Unit Forced Outage Rate c30 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach): Refueling 1- 15-84 24.
h MU through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.
4
- 25. If Shut Down at End of Report Period. Estimated Date of Startup: N/A O<
N Units In Test Status (Prior to Cor-ercial Opera tion): Fo r eca s t Achieved OT 26.
CQ C 0.2 INITIAL CRITICALITY N/A N/A _
INITIAL EL*'CTRICITY N/A N/A COSiERCIAL OPERATION N/A N/A l
- Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment.
r public service company e odemeda Ja' '. 16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Reference:
Facility Operating License No. DPR-34 Docket No. 50-267
Dear Sir:
Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported.
Very truly ycurs, b ]YYb.<d Don W. Warembourg v q
Manager, Nuclear Production Enclosure cc: Mr. John T. Collins DWW/dkh i/l ggfWO SE@ g y r! Y
. - . - - - - . .- . ..- _ . - - _. .