NIAGARA N0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of March with a monthly unit availability factor of 51.8% and a net design electrical capacity factor of 41.3%.
The plant operated from March 1 to March 17 in a coastdown mode to 77.7% power. On March 17 the unit was removed from servic'e for a scheduled refueling and plant overhaul of approximately 8 weeks.
CLASS I WORK - MAINTENANCE - MARCil 1984 WR# 21205 #12 RBCLC Installed new mech. seals, pump wear rings WR# 25138 #112 Containment Spray lleat Exchanger - inspection WR# 24524 Liquid Poison Valve #705 replaced stem WR# 25143 #121 Containment Spray lleat Exchanger - inspection l WR# 24513 Cont. Spray R.W. Valve 93 took up on packing
- WR# 25137 #122 Containment Spray lleat Exchanger -inspection WR# 21479 #11 FWP seal waterline - replaced union l #12 FWP Warm up .line Valve (29-FW42) replaced valve l
WR# 21207 WR# 25139 #112 Containment Spray lleat Exchanger - inspection, plugged tubes WR# 24434 FCV 50-20; inspect internals WR# 25104 FCV 50-20; Straighten stem WR#. 21208 #11 FWP Warm up line Valve (29-FW27) replaced valve WR# 23095 Removed Blank Flanges Liq. Poison 2 1/2" El. 298 Rx. Bldg.
for ISI inspection WR# 23209 Component Support #33-1141 (misalignment) .
WR# 22381 ' Shutdown Cooling Pump #13 replaced shaft, impeller, wear rings WR# 25282 Penetration W-116 Added Knowool and Flamastic WR# 24567 Penetration RW-29 Added Knowool and Flamastic WR# 25281 Penetration W-19 Added Kaowool and Flamastic WR#. 25285 Penetration I-32 Added Knowool and Flamastic WR#- 25286 Penetration I-33 Added Kaowool and Flamastic CLASS I WORK - INSTRUMENTATION 6 CONTROL - MARCll 1984 WR# 23505 #12 Inst. Air Comp. loading ~ solenoids (rebuilt solenoid valves)
WR# 22127 Check operation of solenoid valves IA26 6 IA25, repair if necessary .(replaced coil on solenoids IA25 6.IA26) 8404170075 8400K32 PDR ADOCK 05000220
. _R. PDR ,
CLASS I - ELECTRICAL MAINTENANCE - MARCII 1984 WR# 21440 Containment Radiation Monitoring removed wires for App. J Mod WR# 23332 N2 Purge and Fill removed wires for App. J. Mod WR# 23333 Lontainment Radiation Monitoring removed wires for App. J. Mod WR# 24475 161 MG Set 600V Bkr. replaced overcurrent devices WR# 24489 13 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25084 11 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25097 CU System Return IV33-01 attached thermal heaters WR# 25173 Containment Radiation Monitoring replaced terminal block M0s 2131 Rx Protection System MG Set Alarms 3411 Core Spray /Rx Ilead Vent 3405 Remove Shutdown Panel Isol Mod.
3384 ilPCI Low Flow Control System 2440 Primary Cont. Vent Post LOCA SURVEILLANCE TEST N1-MST-M1 125 VDC Battery Pilot Cell Voltage 6 Specific Gravity Test
w .
1 .
s .s .
OPERATING DATA REPORT DOCKET NO.
50-220 DATE 4/6/04 COMPLETED BY TW Roman TELEPHONE (315)349-2422 OPERATING STATUS
- 1. Unit Name: Nine Mile Point Unit #1 Notes
- 2. Reporting Period: 3/1/84 - 3/31/84
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 640 -
- 5. Design Electrical Rating (Net MWe): 630
- 6. Maximum Dependable Capacity (Gross MWe): 620
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted.If Any(Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to-Date Cumulative II. Hours in Reporting Period 744.0 1825.5 126.360.2
- 12. Number Of Hours Reactor Was Critical 388.5 1828.5 88.130.2
- 13. Reactor Reserve Shutdown Hours 0 0 1,204.2
- 14. Hours Generator On Line 385.5 1825.5 85,313.8
- 15. Unit Reserve Shutdown Hours 0 0 20.4
- 16. Gross Thermal Energy Generated (MWH) 589,280.0 3,062,522.0 141,156,962.0
- 17. Gross Electrical Energy Generated (MWH) 196,936.0 1,034,284.0 46,666,065.0
- 18. Net Electrical Energy Generated (MWH). 190,366.0 1,001,923.0 45,196,682.0
- 19. Unit Service Factor 51.8 83.6 67.5
- 20. Unit Availability Factor 51.8 83.6 67.5
- 21. Unit Capacity Factor (Using MDC Net) 41.9 75.2 58.6
- 22. Unit Capacity Factor (Using DER Net) 41.3 74.0 57.7
- 23. Unit Forced Outage Rate 0.0 0.0 17.1 24, Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Biennial Refuel and Overhaul started 3/17/84
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/15/84
- 26. Units In Test Status (Prior to Commercial Operation): Foreca t . Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
'(4/77) t,_.--._- -- ._ . - - . . _ _ _
AVER \GE D ALLY UNIT POh ER LEVEL DOCKET NO. 50-220 UNIT 9 blile Pt. #1 4/3/84 DATE CO\lPLETED BY TW Roman h, TELEPIIONE -(315)349-2422
. MONTH Mnrr h 10Ra DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe.NetI (ywe.x, 3 1 509 g7 13 2 503 is 0 3 507 39 0 4 504 0 20 5 501 2g 0 e 6 501 ,,
0 7 500 33 ,_ 0 8 494 24 -0 9 491 0 -
25 10 494 26 0 11 492 0 2-12 49'1 33 0 13 487 29 o 14 486 0 30 15 3g 0' 16 474 INSTRL*CTIONS On this format.hst the average daily unit power leselin MWe. Net for exh day in the repmemu in.inth.C.unpute o the nearest whole me;swort. '
d (917')
i
-___-------_----_.-___.__.------_-.---_----_-------.--_--_--.---------------------'--A
4 i
DOCKET NO.
50-220
- UNIT SHUTDOWNS AND POWER REDUCTIONS '
UNIT NAME 9 Mile Pt. 1 .* '
DATE 4/0/64 m .
COMPLETED BY TW Roman A g REPORT MONTH March 1984 TELEPHONE (3151349-2412 .
w.
- E E Ibte
, .! ? 3 $YE Licensee ,E*, $*'. Cause & Corrective No. i EE h 2 5 cE Event p s8 Action to H g$ I. ci j;gg Report a mO j' Prevent Recurrence d
- 84-6 3/17/84 S C 1 Unit Shutdown for Biennial Refuel and Overhaul O
l c!
n, l
l .
\
l l I 2 3 4 l F: Forced Reason: Method: Exhibit G -Instructions
- i S: Scheduled A-Equipment Failure (Explain) I Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative . 5 G-Operational Errur (Explain) Exhibit I - Same Source 19/77) Il4)ther (Explain) amo .
NMP-8317 l
l l
NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE.N Y.13202 AptLL 11, 1984 Qirector Office of Inspection and Enforcemen.t U.S. Nuetear Regulatory Commission it'asitington, DC 20555 ATTN: Document and Control Desh Re: Docket No. 50-220 i DPR - 63
Dear Sir,
Subnitted Iterewitit is the Report of Operating Statistics and SItutdoten Experience for MarcIt 1984 for tite Nine I.llie Poiett Nuctcar Station Unit YI .
Also included is a narrative report of Operating Experience for Marcit 1984 Sincercly,
( -
V' ' ! "& 91- 2 -
Thomas E. Lempges Vice President Nueicar Generation TEL/Lo AttacItmenta cc: Director, Of fice of ISE (10 copies)
"A W