Text
---
(BSEP-2-30)L 2
l ' F.
to TABLE 3.3.5.2-1 - ,
I E REMOTE SHUTDOWN MONITORING INSTRUMENTATION
?!
N MINIMUM
'" READOUT CHANNELS FUNCTIONAL UNIT AND' INSTRUMENT NUMBER LOCATION OPERABLE 5
E 1. Reactor Vessel Pressure RSP* 1 m (C32-PI-3332 and C32-PT-3332)
- 2. Reactor Vessel Water Level RSP*. 1 (821-LT-NO17D-3, B21-LSH-N017D-3)
(821-LI-3331, B21-LI-R604AX, B21-LT-3331, B21-LT-NU26A)
- 3. Suppression Chamber Water Level RSP* 1 (CAC-LI-3342 and CAC-LT-3342) h 4. Suppression Chamber Water Temperature (CAC-TR-778-7)
RSP* 1
- 5. Drywell Pressure RSP* 1 (CAC-Pl-3341 and CAC-PT-3341)
- 6. Drywell Temperature RSP* 1 (CAC-TR- 7 78-1,3,4)
- 7. Residual Heat Removal Head Spray RSP* 1 Flow (Ell-FT-3339 and Ell-FI-3339)
- 8. Residual Heat Removal System Flow RSP* 1 l
(Ell-FT-3338, Ell-FI-3338, and Ell-FY-3338)
U 9. Residual Heat Removal Service Water RSP* 1 l
h Discharge Differential Pressure g (E11-PDT-N002BX and Ell-PDI-3344) f
- Remote Shutdown Panel, Reactor Building 20' Elevation h
P O
e (BSEP-2-36) ,
as *-
TABLE 4.3.5.2-1 vs f3 REMOTE SHUTDOWN MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS S
' !HANNEL CHANNEL c: FUNCTIONAL UNIT AND INSTRUMENT NUMBER CHECK CALIBRATION 4
z
>4 *
"i
- 1. Reactor Vessel Pressure M Q (C32-PI-3332 and C32-PT-3332) _
- 2. Reactor Vessel Water Level (B21-LT-N017D-3, B21-LSH-N017D-3) NA Q (B21-L1-3331, B21-LI-R604AX, B21-Lf-3331, M Q B21-1.T-N026A)
- 3. Suppression Chamber Water Level- M R (CAC-LI-3342 and CAC-LT-3342) -
- 4. Suppression Chamber Water Temperature M R w (CAC-TR-7 78-7) l-s *j. -
- 5. Drywell Pressure (CAC-PI-3341 and CAC-PT-3341) M Q
- 6. Drywell Temperature (CAC-TR- 7 h3-1,3,4) _
M R
- 7. Residual Heat Removal Hea1 Spray Flow - -
_( Ell-FT-3339 and Ell-FI-3339) M Q
- 8. Residual Heat Removal System-Flow (Ell-FT-3338, Ell-FI-3338, and Ell-FY-3338) M Q l
Si 9. Residual Heat Removal Service Water Discharge M 'Q
~l
@ Dif ferential Pressure (Ell-PDT-N002BX
$" and Ell-PDI-3344) n s
J
=
Ja*
ci u
'[I, 4.* (BSEP-2-36)
L :s b
-CONTAINMENT SYSTEMS-
..'1 GAS ANALY7ER SYSTEMS g.
LIMITING CONDITION FOR OPERATION 3.6.6.4 . Two independent gas analyzer systems for the drywell and suppression chamber shall be OPERABLE with each system consisting of an oxygen analyzer and a' hydrogen analyzer.
-APPLICABILITY: CONDITION 1.
ACTION:
. a. With one oxygen and/or one hydrogen analyzer inoperable, restore at least two. oxygen and two hydrogen analyzers to OPERABLE status witnin 5 31 days or be in at least STARTUP within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The
', provisions of Specification 3.0.4 are not applicable.
j b. With no gas analyzer OPERABLE for oxygen and/or hydrogen, be in at least STARTUP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
~ SURVEILLANCE REQUIREMENTS
- 4. 6. 6. 4 Each gas analyzer syrtem (CAC-AT-4409, Division I and CAC-AT-4410, Division II) shall be demonstrated OPERABLE at least once per 92 days by
. performing a CHANNEL CALIBRATION using standard gas samples containing a nominal: l
- f. Twenty to twenty-five percent oxygen, balance .41trogen.
l ne :
~J
, i 3
14 Amendment No.
BRUNSWICK - UNIT.2- 3/4 6-30 U 3 1