Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 Monticello Technical Specifications Section 6.7.A.3 I
U? Nuclear Regulatory Commissio:.
Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 License . DPR-22 Monthly Operating Report J_une . 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant.
//& I $
Thomas M Parker Manager Nuclear Support Service TMP/mkl C: Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I
I 9207160145 920630
- yDR -ADocg 0y0099$3
/,)N, J
PDR .v \
(/
OPERATING DATA REPORT DOCKET NO. 50-263 l . DATE 7- 1-92 I -
COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes ]
- 1. Unit Name : Monticello ) ]
- 2. Reporting period: JUNE ] )
- 3. Licensed Thermal Power (MWt): 1670 ) )
- 4. Nameplate Rating (Gross MWe). 569 ) ]
- 5. Design Electrical Rating (Net MWe): 545.4 ] )
- 6. Maximum Dependable Capacity (Gross MWe): __564 ) )
- 7. Maximum Dependable Capacity (Net MWe): 536 ) )
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe). N/A
- 10. Reasons For Restrictions, If Any: __N/A 2
THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720 4367 184104
- 12. Number Of Hours Reactor Was Critical 723.0 4149.3 147567.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.
- 14. Hours Cenerator On-Line 720.0 4111.3 144859.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (!GVH) 1199921 6810891 222344468
- 17. Gross Electrical Energy Generated (MWH) 399882 2283826 75173671
- 18. Net Electrical Energy Generated (MWH) 382788 2194770 71896988
- 19. Unit Service Factor 100.0% 94.1% 78.7%
- 20. Unit Availability Factor 100.0% 94.1% 78.7%
- 21. Unit Capacity Factor (Using MDC Net) 99.2% 93.8% 72.9% -
- 22. Unit Capacity Factor (Using DER Net) 97.5% 92.1% 71.6%
- 23. Unit Forced Outage Rate 0.0% 1.6% 3.8%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 1/6/93 - 56 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
4 e, _ ;
k AVERAGE' DAILY UNIT POWER' LEVEL g ,
DOCKET NO. 50-263 t UNIT. Monticello___
DATE 7- 1-92 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 ,
MONTH OF' JUNE ll DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 535. 17 532.
-- 5 2 533, 18 534.
-3 526. 19 535.
14L 525. 20 535.
-5: 528. .21 536.
528. 537.
6- -22
'7- -528'.- 23 537.
8 535.- 24 537. ,
E <9-- 533. 25 536.
- 10' 529. 26. 537. <
- 11 528. 27 537.
p C12 - 525. _ _28 534.
l 2137 525 -
29 536.
- 14 518.- 30 534.
'15 527.
11 6: 531.
- e
~
INSTRUCTIONS
-On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month. Compute to'the nearest whole megawatt.
e
. l !!ARRATIVE
SUMMARY
OF OPERATI!1G EXPERIEt1CE -
. DOCKET 110. 50-263
- DATE 7- 1+92 COMPLETED BY 11 . 11 . Paustian TELEPilClJE 612/295-5151 M011Til ._J UlJ 6-1-92 to Power operation.
6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
m .
IEIT SUITEDOWNS AND P(NER REUCIICNS - D00TT NO. 50-263 ' ,
(MIT NAME Monticello
- DATE 17-01-92 . ..
REPORT MONIH June lii2 29hs$5k' ~.
- 6 No. Date Duration Reason Mediod LER Systez . Cause & Corr m tive "Ay(pe
- 1) (hours) (2) of No. Code e Action (o l
Shutdown (4) (5) Prevent Recurrence
-(3) i None r l
r 4
i i i
i !
i i
1 i
1 2 3 4 ;
F: Forced Reason: Method: Draft IEEE Standard !
5: Scheduled A-Equipment Failure (Explain) 1-Mainsal 805-1984(P805-DS) ;
i B-Ma1ntenance or Test 2-Mantial Scram !
C-Refueling 3-Automatic Scram 5 i D-Regulator Restriction 4-Other (Explain) IEEE Standard 803A-1083 t E-Operator Training & License Examination ;
F-Administrative '
G-Operational Error (Explain) ;
. H-Other (Explain) f I
I