Forwards List of Newly Numbered Exhibits Offered in Evidence at 841009-12 Hearing.Related Correspondence
ML20106D034
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/20/1984
From: Guild R
GUILD, R., PALMETTO ALLIANCE
To: Foster R, Kelley J, Purson P
Atomic Safety and Licensing Board Panel
References
CON-#484-696 OL, NUDOCS 8410240460
Download: ML20106D034 (4)


Text

' ~C96 *' -

',f '" '- '

REU,7C ;;,,- i

-..2_ %_

'1

, ROBERT GUILD ATTOft80EY AT LAW POST OFFICE BOX.12097 CHARLESTON. SOUTH CAROUNA 29412 TELEPHONE 803/ 2 5 4-813 2

.~ : ; r . -

. October 20, 1984 " M 0" James L. Kelley, Chairman Dr. Paul W. Purded84 (!g ,

Atomic Safety and Licensing Board Atomic Safety and Licens g NI II4 US Nuclear Regulatory Commission Board ,

Washington, DC 20555 235 Columbia Drivej.6 . j, Decatur, GA 30030 ' cq,,(.P' '

Dr. Richard F. Foster Atomic Safety and Licensing Board P. O. Box 4263 Sunriver, OR 97702 In the Matter of DUKE POWER COMPANY, ET AL.

(Catawba Nuclear Station, Units 1 and 2)

Docket Nos. 50-413 and 50-414 g(

Dear Sirs:

During the course of the recent hearing a number of documents obtained in discovery by Palmetto Alliance _from Ap.plicants and the NRC Staff were identified and offered in evidence by Palmetto although some were not assigned exhibit numbers or submitted'for the record at that time. Leave was granted, without objection, for our later assignment of exhibit numbers and submission of these documents for the record. We make such assignments and' submissions at this time. .

On the attached listing of Palmetto and CESG Exhibits those numbered 152 and following are newly numbered. Palmetto Exhibit No. 146.(FOIA 84-722, NRC Region II " welder B" case file) is to be reproduced and transmitted by'the NRC Staff. This Exhibit was idnetified and offered at Tr. 13,792, and admitted as No. 146, with-out objection at Tr. 13,926. It is mis-indexed as " Table I" on the Index page of the transcript for Thursday, October 11, 1984.

I A Table I to Mr. Ferdon's July 16, 1984, Memo, entitled " Summary l of Reported PWR IGSCC Events" was, in fact, admitted as a part of

the Memo to which it was attached, Tr. 13,924, which was admitted as Staff Exhibit No. 30. Tr. 13,624.

! All of these documents have previously been circulated to the

[ Board and parties. A set of these Palmetto / CESG Exhibits (except No. 146) is enclosed for the convenience of the Chairman. By copy ,

l. - -

i 84102%0 PDR A 0

PDR o

y -

/

James L. Kell'ey, Chairman Page 2 October 20, 1984 of this letter we are transmitting three copies of these Exhbits to the hearing reporters for nelusion in the record.

o S e ely o r ,

b Robert Guild Counsel for Palmetto Alliance Encl.

cc: Ace-Federal Reporters, Inc

Service list i

i 4

4 4

l 5

'h

r

(-

PALMETTO ALLIANCE AND CAROLINA ENVIRONMENTAL STUDY GROUP

, EXHIBITS HEARING SESSION OCTOBER 9-12, 1984 No. . 144 --Ferdon analysis of Arlon Moore's welds- 3pp.

No. 145 - Krus% Welds Requiring Metallurgical Evaluation and photomicrographs- 13 pp.

No. 146 - FOIA 84-722, NRC RII "

welder B" case file-No. 147 - Michalowski Summary and Vita- 7pp.

No. 148 - Offer of Proof - Lewis, Memo 9/11/84, CJ Parker concers about Dodd- 1p.

No. 149 - Offer of Proof - Coble, Item 26- Concern 15 -4pp.

No. 150 - Offer of Proof - Coble, Item 24- Concern 5- 4pp.

No. 151 - Davison, Memo 8/2/84, Second Shift Welding Inspection-'3pp.

No. 152 - Billy Smith, 7/26/84, Employee Report- Ip.

No. 153 - Arlon Moore, 7/26/84 Employee Report- 1p.

No. 154 -

Employee Relations Concerns Action Plan- 3pp.

No. 155 - Johnson, 8/8/84, Memo re: counseling for W.E. Rogers- 1p.

No. 156 - Summary of-Concerns From Interviews, 4/17/84- 3pp.

No. 157 - Tabulation of Concerns From Screening I n t e rv ie'w s , 5/22/84-2pp.

No. 158 - Assignment Sheet- Ip.

No. 159 - Inv./Res. of Concerns- Interpass Temperature, 8/10/84- lipp.

No. 160 - Inv./Res. of Concerns- Quality of Work Affected By s_ Production Pressure, 8/9/84- 2pp.

No. 161 - Kruse, Violation of Interpass Temperature- draft- 5pp.

No. 162 - Generation of Computer Weld List- Ip.

No. 163 " Critical" Welds Identified by Construction Iso, 6/15/84- 2pp.

No. 164 -

Reg Guide 1.64, Control of the Use of Stainless Steel- 3pp.

+..

-, - e- g - -m-- -*. -- - e-.

t

No. 165 - ANSI / ASTM A 262 Detecting Susceptibility to Inter-granular Attack in Stainless Steels- 27pp.

No. 166 - Llewellyn, 8/15/84 Memo, re: Individual 148's concern- Ip.

No. 167 - Inv./Res. of Concerns- Removal of Arc Strikes, 8/9/84- 3pp.

No. 168 - Inv./Res. of Concerns- Cold Springing, 8/10/84-2pp.

No. 169 - Sutton, 3/16/84 Memo, foremen who worked for Smith- 13pp.

No. 170 - Miller, 8/3/84 Memo, violation of interpass temperature comment on disposition- 2pp.

No. 171 - Ferdon, 7/19/84 Memo, Minutes of 6/20/84 Meeting- 5pp.

No. 172 - Welding Craft organization chart- 1p.

t 9