ML20112F823

From kanterella
Revision as of 19:28, 17 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 15 to Secondary Containment Leak Rate Signoff, Performed on 841028.Satisfactory Test Results Verify Integrity of Secondary Containment
ML20112F823
Person / Time
Site: Pilgrim
Issue date: 01/08/1985
From: Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
Shared Package
ML20112F826 List:
References
#85-002, #85-2, NUDOCS 8501160055
Download: ML20112F823 (1)


Text

,_. _ _ _ - -.

SOSTON EDISON COMPANY 800 BovLaTON STREET BOSTON. MASSACHUSETTS 02199 wtLLIAM O. HARRINGTON

. . . .. . . . . . . . . . January 8, 1985

""* =

BEco Ltr. #85-002 Director. 0ffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

. Washington, D.C. 20555 ATTN: Document Control Desk Docket Nuncer 50-293 License DPR-35

Subject:

Secondary Containment Leak Rate Test Report

Dear Sir:

A Secondary Containment Leak Rate Test (8.7.3) was satisfactorily performed on October 28, 1984 and is hereby reported as required by PNPS Technical

-Specification 6.9.C.3. This test was performed to verify secondary containment integrity at Refueling Outage #6 prior to refuel.

This secondary containment leak rate test demonstrated that the Standby Gas

' Treatment System (SGTS) was capable of maintaining greater than 1/4 inch of water vacuum in the secondary containment, as required by PNPS Technical Specification 4.7.C.1.c.

The test was initiated through the_use of permanently installed test switches which simultaneously isolated the normal secondary containment ventilation system and initiated the Standby Gas Treatment System.

- Review and approval by the Boston Edison Company's Nuclear Engineering l-  : Department of the acceptance criteria of this test-ensures that! satisfactory results from its performance verifies the integrity of secondary containment.

. The data obtained during the test is enclosed.-

Very truly yours, W. ~ D. Harrington PF6: caw

(

Attachment Courtesy Copy to:- Director, Division of Project and Resident Programs Region I i

U.S. Nuclear Regulatory Commission

, g i stiMPJMj8g_ k P.

- _ __ _ _ - _. - . . _ _ _ . . _ _ _ . _ . . . ~ . , . . ~ _ . . _ , _ _ . _ _