ML20134A045
| ML20134A045 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/12/1985 |
| From: | SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20132C709 | List: |
| References | |
| FOIA-85-425 SO23-3-2.7-01, SO23-3-2.7-1, NUDOCS 8508150162 | |
| Download: ML20134A045 (8) | |
Text
-
4 M.SAN ONOFRE NUCLEAR GENERATING STATION ;) - i ,- ;,
OPERATING INSTRUCTION S023-3-2.7 i UNITS 2 AND 3 REVISION 7 PAGE 1 0F 4 o
ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-R ,
HPSI PUMP P-017 ALIGNMENT UNIT 2 (2 or 3) 0 ATE \'LF'e O y TIME Alo O PREREQUIS:ITES -
, INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0. bs $ .
1.1.1 List all applicable TCNs or write N.A.
TC# ~l- 2 1.2 On-shift SRO-Operations Supervisor approval obtained.
(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance ,
of this procedure. A y
- t. .
2.0 PROCEDURE INITIALS ~.
IST / 2ND
. .-)
"1 l NOTE: (1) Not applicable if performed in conjunction r with Check-Off List 10.
2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre, f -
valve 52(3)1204MUO34 c4/CdN
.1 Lock closed HPSI P017 miniflow orifice bypass valve (,1. g r0 S2(3)1204MU184 W / U" ' it .
2.1.2 Lock Open HPSI P-017 suction valve
- 52(3)1204MU007 y// D)p i
' .) w .e-2.1.3 Lock Open HPSI P-017 discharge valve /
52(3)1204MUO12 cr-~7Oh 2.1.4 Open CCW to P-017 7 valve 52(3)1203MU228 1\ /@
2.1.5 Open CCW from P-017 f valve 52(3)1203M0013 6 /Om
, l .' NOTE: Notify Health Physics before venting lb potentially radioactive water 1 .
! B500150162 050717 ,
BELLBS-425 PDR
r
)
3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4
- ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-8 -
2.0 PROCEDURE (Continued) INITIALS IST / 2ND 2.1.6 Vent P-017 suction piping bp uncapptr3 I and venting'with P-017 suction vent )
valve S2(3)1204MR088 * / raw \
2.1.7 Close and cap P-017 suction vent j valve S2(3)1204MR088 7-/C\ ~
NOTE: Notify Health Physics before venting potentially radioactive water.
2.1.8 Vent P-017 discharge piping by uncapping and venting with P-017 miniflow vent valve 52(3)1204MR279 [ /CM i 2.1.9 Close and cap P-017 miniflow vent valve S2(3)1204MR279 ] /Cdh 2.1.10 HPSI P-017 Breaker A0408: i RACKED IN '
)fe DC ON-W CLOSING SPRINGS I CHG MOTOR ENERGIZED. h /CdA .
CAUTION If P-018 is not aligned to Train A,
======= until P-017 is declared operable per step 2.1.11, Train A HPSI is not operable. With the plant ,
in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
(1)2.1.11 With an operator present at P-017 to ,
check for abnormal operation, start i P-017 and verify P-017 operable as -
. follows:
.1 Verify P-017 starts and develops
, greater than 1400 psig discharge .
pressure as indicated on PI-0308 (CR-57)
D
.2 Verify P-017 exhibits no unusual vibration or leakage while running NOTE: (1) Not applicable if performed in
{ *. conjunction with Check-Off List 10.
l
.z _ y s -
3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 .
ONITS 2 AND 3 REVIS10N 7 PAGE 3 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _7 - 6 2.0 PROCEDURE (Contimued) INITIALS IST / 2ND (1)2.1.12 Stop P-017. ,
52/L_
v
[ .
NOTE: P-017 is now operable 2.2 Ren.oving P-017 from Service CAUTION If P-018 is not aligned to Train A,
r completing the following steps will make Train A HPSI inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
A 2.2.1 Turn DC Off and Rack Out HPSI /ie P-017 breaker A0408 / V' e~
A- 2.2.2 Lock Closed HPSI P-017 miniflow recirc valve S2(3)1204MUO34 /
2.2.3 Lock Closed HPSI P-017 discharge valve 52(3)1204MUO12 /
2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007 /
2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:
otherwise, N/A these steps:
.1 Close CCW to P-017 valve 52(3)1203MU228 /
2 Close CCW from P-017 valve !
S2(3)1203MU013
n .- w w. .
~ 3AN ONOFRE NUCLEAR GENERATING STATION '
UNITS 2 ANO 3 OPERATING INSTRUCTION 5023-3-2.7 REVISION 7 PAGE 4 0F 4
, ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _]- A PERFORMED BY: fu .
/M_4 DATE/ TIME 13 Fa (< rn7d OpeT(Wr Iriitia1 /
PERFORMED BY: // c, , [# DATE/ TIME / M6th 02,7 7
. ~ OpWaTpV. Initial '
VERIFI'ED BY: ,h / C 3 ty\
Q)per to r Initi 1 DATE/ TIME 12.Yeh.Y6[t'L71
/
VERIFIED BY: ._
dha / DATE/ TIME '2-II- fr !t 2. 7 7 O-lh-8$ OWf NOTE:
SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Of f List have beeri resolved f.e.:
TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.
REVIEWED BY: l J 0
'( 00 Supv.) 8 DATE/ TIME _ 7 55
//
FILE DISPOSITION: File per 5023-0-28
,k7 COMMENTS:
i II94g
( -
2-t, ;
SA'N ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION S023-3-2.7 UN'ITS 2 AND 3 REVISION 7
- PAGE 1 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7 R HPSI PUMP P-017 ALIGNMENT UNIT 1 (2 or 3) DATE \ 1 F 6Ir r TIME _c~llo O PREREQUIS:ITES -
INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0. bOI 1.1.1 List all applicable TCNs or write N.A.
Tc# 7-R 1.2 On-shif t SRO-Operations Supervisor approval obtained.
(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least i
one train of HPSI is operable and in service and will not be affected by the performance of this procedure. -
A y 2.0 PROCEDURE INITIALS ~.
IST / 2ND
. f l NOTE: (1) Not applicable if performed in conjunction /-
J with Check-Off List 10.
2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre. .
f valve 52(3)1204MUO34 c4/CdD
.1 Lock closed HPSI P017 miniflow orifice bypass valve L,hr/\
52(3)1204MU184 -s / trig ,
2.1.2 Lock Open HPSI P-017 suction valve
- S2(3)1204MU007 1/ / 0)p i-2.1.3 Lock Open HPSI P-017 discharge valve s
)
52(3)1204MUO12 cr-70-h 2.1.4 Open CCW to P-017 7
valve 52(3)1203MU228 B/U" 2.1.5 Open CCW from P-017
)
valve $2(3)1203MUO13 A /Om
, l.'
' NOTE: Notify Health Physics before venting potentially radioactive water 11
- - ' )
s ~
3AN ONOFRE NUCLEAR GENERATING STATION
OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7-8 2.0 PROCEDURE (Continued) INITIALS IST / 2NO 2.1.6 Vent P-017 suction piping bp uncapping and venting'with P-017 suction vent I
valve 52(3)1204MR088 } / RAW \
2.1.7 Close and cap P-017 suction vent j valve 52(3)1204MR088 _7__ M y/
NOTE: Notify Health Physics before venting potentially radioactive water.
2.1.8 Vent P-017 discharge piping by uncapping and venting with P-017 miniflow vent -
valve 52(3)1204MR279 [ /C)b i 2.1.9 Close and cap P-017 miniflow vent valve 52(3)1204MR279 ] /Cdh 2.1.10 HPSI P-017 Breaker A0408:
f RACKED IN
- f:: OC ON g
y CLOSING SPRINGS J CHG MOTOR ENERGIZED.
A. /OM\ .
CAUTION If P-018 is not aligned to Train A,
= untti P-017 is declared operable per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
(1)2.1.11 With an operator present at P-017 to ,
check for abnormal operation, start l P-017 and verify P-017 operable as *
. follows:
.1 Verify P-017 starts and develops
, greater than 1400 psig~ discharge ,
pressure as indicated on PI-0308 (CR-57) M
.2 Verify P-017 exhibits no unusual vibration or leakage while running NOTE: (1) Not applicable if performed in
{'l conjunction with Check-Off List 10.
r y- , :A ,
SAN ONOFRE NUCLEAR GENERATING STATION ON1TS 2 AND 3 OPERAThNGINSTRUCTIONS023-3-2.7 :
- REVISION 7 PAGE 3 0F 4
' ~ ATTACHMENT 8.7 CHECK-OFF LIST 7
. TCN _7 - 8 2.0 PROCEDURE (Continued) , INITIALS IST / 2ND
,1)2.1.12
( Stop P-017. ', , 'l - *5[c__
g . -
- NOTE: P-017 is now operable 2.2 Removing P-017 from Service t
CAUTION If P-018 is n.ot aligned to Train A,
==
j completing the following steps will make Train A HPSI inoperable. With the plant in Modes.1-3, comply we'h e the action requirements of Technical s' Specification 3.5.2.
2.2.1 Turn DC Off and Rack Out HPSI A>
P-017 breaker A0408 / Y; e
> :; ' - 2.2.2
' Lock Closed HPSI P-017 miniflow recirc valve 52(3)1204MUO34 /
2.2.3 Lock Closed HPSI P-017 discharge valve S2(3)1204MUO12 /
2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007 /
2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:
f otherwise, N/A these steps:
.1 Close CCW to P-017 valve !
S2(3)1203MU228 _
/ !
.2 Close CCW from P-017 valve !
S2(3)1203MU013
- 1 i
P i *
- i. l t
i i f
- 7. aw. .
s
- AN ONOFRE NUCLEAR GENERATING STATION UN!TS 2 AND 3 OPERATING INSTRUCTION 5023-3-2.7
- REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7 - @
PERFORMED BY: 1/w Ope (t(r
/b In~1 t t a l OATE/ TIME 13Few W mfd
/
PERFORMED BY: / c, , .
[4r d DATE/ TIME /_M E o, 02,97 OpWalgV Inttial '
VERIFI'ED BY:
M)per
/ O$#\ DATE/ TIME _}J.kb.Y5 tt'3')
Initi 1 atof VERIFIED BY: - Aa / DATE/ TIME T-II- fr !r. U7 NOTE:
&' '"'f. .2-t3-3'.f &Y'f SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Off List have been resolved i.e.:
TCNs and written chains in and place,incorporated, etc. caps and flanges installed, locks REVIEWED BY: _)
f( 00 Tupv.) ' DATE/ TIME _
/ /
7 55 0 FILE DISPOSITION: Flie per 5023-0-28 %.
COMMENTS:
I I194g 9
.-c. _ - _ _ - . _.
, . - - , _