BSEP-85-1099, Special Rept:On 850507,during Refueling/Maint Outage, Concurrent W/Power Operation of Unit 2,Units 1 & 2 Limiting Conditions for Operation Established for Fire Protection Deluge Valve 2-FP-DV-13 to Sprinkler Sys
| ML20140G244 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/10/1985 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| BSEP-85-1099, NUDOCS 8507120592 | |
| Download: ML20140G244 (1) | |
Text
. _ _ _ _ .
Cp&L Carolina Power & Light Company
~, ._
US JUN i3 AJO:27 Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 June 10, 1985 FILE: B09-13510C SERIAL: BSEP/85-1099 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street NW Atlanta, GA 30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.7.2 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-85-4)
Dear Dr. Grace:
During an ongoing Unit I refueling / maintenance outage concurrent with power operation of Unit 2, Unit 1 and 2 LCOs were established on May 7, 1985, for fire protection deluge valve 2-FP-DV-13 to the sprinkler system of the units' common No. 1 emergency diesel generator. This was done to permit isolating the valve for replacement of a bent clapper in the valve-body housing. Due to the amount of time required to complete the involved repair, the specified 14-day time frames of the subject LCOs were exceeded by nine days and six hours.
While the subject LCOs were in effect, appropriate fire watches and backup fire suppression equipment were maintained.
~
Very truly yours,
'9 C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/mcg .