ML20147C551
| ML20147C551 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/07/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20147C534 | List: |
| References | |
| NUDOCS 7810130047 | |
| Download: ML20147C551 (2) | |
See also: IR 05000366/1978032
Text
._. .._ - _ - - - - _ _ _ _ -
l
() '
UNITED STATES
/g* "80u9jeg NUCLEAR REGULATORY COMMISSION i
l
'c(, e REGloN 11
(
5 e ,' i 101 M ARIETTA STREET, N.W.
f ATLANTA, GEORGI A 30303
o
Q[' ,o8
%*O4 **e SEP 7 1978 i
.
In Reply Refer To:
RII:RVL
50-366/78-32
Georgia Power Company
Atta: Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Messrs. R. Vogt-Lowell,
H. L. Whitener, and C. Julian of this office on July 3-7, 1978, of
activities authorized by NRC Operating License No. NPF-5 for the
E. I. Hatch Unit 2 facility, and to the discussion of our findings
held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
Three new unresolved items resulted from this inspection and are
discussed in the enclosed report. These items will be examined during
subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information f rom public disclosure. Any such application must include
a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part
of the document. If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Docu=ent Room.
7&lo/300 L/ I 7
. . . . . . . - _ _ _
.
- *
.
,
Georgia Power Company -2- SEP 7 G78
Should you have any questions concerning this letter, we will be glad
to discuss daem with you.
Sincerely, ;
-_ s~fs0 '
ti __ ' '73 y
F . J . Long , Chie'f
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-366/78-32 )
cc: H. Hanry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
'
Plant E. I. Batch
P. O. Box 442 '
!
Baxley, Georgia 31513 l