ML20195H658
| ML20195H658 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/17/1998 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20195H655 | List: |
| References | |
| NUDOCS 9811240067 | |
| Download: ML20195H658 (2) | |
Text
_ - . . . . _ . . _ _ _-. .. _ . _ _ ..
~
1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l DOCKET NO. 50-302/ LICENSE NO. DPR-72 l
l l
i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i
i Proposed Technical Specification Change Page l
l 9811240067 981117 DR ADOCK 050003 2 i
I
- . . . ~ . .- . . - . . . . . - . - . _ - . - - - . - . . ~ . - . . - - . . ~ . - .-- =-.. . - .-
Reporting Requirements
'.' 5.7 5.7 Reporting Requirements 5.7.2 Special Reports (continued)
- 5. .For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.
- 6. A deterministic assessment for the first span "B" 0TSG pit-like IGA.
Results of 0TSG tube inspections that fall into Category C-3 ,
shall be reported to the NRC prior to resumption of plant 'l operation. This report shall provide a description of '
investigations conducted to determine cause of the tube l degradation and corrective measures taken to prevent recurrence.
I II I I I
l l
l L
i' i
4 Crystal River Unit 3 5.0-29A Amendment No.
. .. . . - -- - . .- ---------.-- -,