Forwards Insp Rept 50-333/97-08 on 971027-1221 & Notice of Violation.Violations Re Improper Performance of Abnormal Operating Procedure to Isolate Sys Electrical Ground
ML20199E408
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/20/1998
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20199E413 List:
References
50-333-97-08, 50-333-97-8, EA-98-008, EA-98-8, NUDOCS 9802020150
Download: ML20199E408 (5)


See also: IR 05000333/1997008

Text

{{#Wiki_filter:.. . _ - - - _ _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ .

    ,
                                                    .
                  ..      ..   .. .      ..
      4
        ,

., s

 ,                   ,
                                                       January 20, 1998
           EA No. 98-008
           Michael J. Colomb
           Site Executive Officer
           New York Power Authority
          James A. FitzPatrick Power Plant
           Post Office Box 41
           Lycoming, NY 13093
           SUBJECT:          NRC INTEGRATED INSPECTION 50-333/97-08, NOTICE OF VIOLATION
                               AND EXERCISE OF ENFORCEMENT DISCRETION
           Dear Mr. Colomb:
           On December 21,1997 the NRC completed an inspection at your FitzPatrick Power Plant.
           The enclosed report presents the results of that inspection.
           During this inspection period, your conduct of activities at the plant were generally
                                                                                                                                                                                                                                  '
           characterized by safe plant operations. The decision to shutdown to repair leaking safety
           relief valves was conservative and the shutdown and subsequent startup were performed
           well. Additionally, an inspection of the solid radioactive waste and transportation
           programs found them well managed and effective. However, an operator error in
           implementing an abnormal operatin0 procedure and several discrepancies associated with
           high pressure coolant injection system maintenance activities indicate that additional focus
           and attention are warranted to improve work control activities.
           Based on the results of this inspection, the NRC concluded that three violations existed.
           The improper performance of an abnormal operating procedure to isolate a system
           electrical ground, the failure to meet Technical Specification requirements for primary
           containment Isalation valves and the inappropriate removal of a component from the
           environmental qualification program were violations. These violations are cited in the
           enclosed Notice of Violation, and the circumstances surrounding the violations are
           described in detail in the enclosed report. Please note that you are required to respond to
           this letter and should follow the instructions specified in the enclosed Notice when
           preparing your response. The NRC will use your response, in part, to determine whether
           further enforcement action is necessary to ensure compliance with regulatory
                                                                                                                                                                                                                             h l
           requirements.
                                                                                                                                                                                                                              !f
                                                                                                                                                                                                                                    '
           Included in this report is closecut of an Inspector Follow-up Item involving the potential
          . violation of 10 CFR 70.24, Criticality Accident Requirements. We have determined that
           your facility was in violation of this regulation in that you did not have in place either an
           adequate criticality monitoring system for handling and storage of new (non-irradiated) fuel
           or an NRC approved eumption to the regulation. However, numerous other f acilities have
            similar circumstances. The NRC has reconsidered this violation and concluded based on
           the information discussed in the report that, although a violation did exist, it is appropriate
             9802020150 980120                                                                                                                                              T4              p
             PDR       ADOCK 05000333
             G                      PDR
                                                                                                                                                                            i *fj yk' ;iH'rh
                                                                                                                                                                             -
                                                                                                                                                                                     ,'
                                                                                                                                                                                         k fj ,h,f,,f
                 "         ~
                                                                                                                                                                                   =
                                                                                                                                                                                            ' ! l ,l '
                                                                                                                                                                                                       ,
                                                                                                                                                                                                         .
                                               OFFICIAL PECORD COPY                                                                                                                                         IE:01
                                                                                                                                                                                                           _ ________ __.__.     _J
     *
       .
         .
   *
 .
   4

'

            Michael J. Colomb                                 2
            to exercise enforcement discretion for Violations involving Special Circumstances in
            accordance with Section Vil B.6 of the " General Statement of Policy and Procedures for
            NRC Enforcement Actions" (Enforcement Policy), NUREG 1600. The bases for exercising
            this discretion are the lack of safety significance of the failure to meet 10 CFR 70.24;the
            failure of the NRC staff to recognize the need for an exemption during the licensing
            process; the prior NRC position concerning the lack of a need for an exemption; and finally,'
            the NRC's intention to amend 10 CFR 70.24 through rule making to provide for
            administrative controls in lieu of criticality monitors.
            Therefore, I have been authorized after consultation with the Director, Office of
            Enforcement, to exercise enforcement discretion and not issue a violation for this matter.
            Pending the amendment to 10 CFR 70.24, further enforcement action will not be taken for
            failure to meet 10 CFR 70.24 provided you obtain an exemption to this regulation before
            the next receipt of fresh fuel or before the next planned mcvement of fresh fuel
           - In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
            and its enclo::ures will be placed in the NRC Public Document Room.
                                                           Sincerely,
                                                           Original Signed by:
                                                           Charles W. Hehl, Director
                                                           Division of Reactor Projects
             Docket No.: 50-333
             License No.: DPR 59
             Enclosures:
             1. Notice of Violation
             2. Inspection Report 50-333/97-08
                                              . . . . . . .      ..           .
                               .
                                 ..
                .
 .
      9
                   Michael J. Colomb                                3
                   cc w/encls:
                   C. D. Rappleyea, Chairman and Chief Executive Officer
                   E. Zeltmann, President and Chief Operating Officer
                   R. Hiney, Executive Vice President for Project Operations
                   J. Knubel, Chief Nuclear Officer and Senior Vice President
                   H. P. Salmon, Jr., Vice President of Nuclear Operations
                   W. Josiger, Vice President - Engineering and Project Management
                  .J. Kelly, Director - Regulatory Affairs and Special Projects
                   T. Dougherty, Vice President - Nuclear Engineering
                    R. Deasy, Vice President - Appraisal and Compliance Services
                    R. Patch, Director - Quality Assurance
                    G. C. Goldstein, Assistant General Counsel
                    C. D. Faison, Director, Nuclear Licensirg, NYPA
                    K. Peters, Licensing Manager
                  ' T. Morra, Executive Chair, Four County Nuclear Safety Committee
                    Supervisor, Town of Scriba
                    C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
                    P. Eddy, Electric Division, Department of Public Service, State of New York
                    G. T. Goering, Consultant, New York Power Authority
                    J. E. Gagliardo, Consultant, New York Power Authority
                    E. S. Beckjord, Consultant, New York Power Authority
                    F. William Valentino, President, New York State Energy Research
                      and Development Authority
                    J. Spath, Program Director, New York State Energy Research
                      and Development Authority

t

   ..
        .. . ..        .
                            ..      .
                                                            .. .
                                                                      . _ _ _   _ _ _ - _ _
  .
    ,

,

             Michael J. Colomb                                          4
             Distribution w/encis:
             H. Miller, RA/W. Axelson, DRA (1)
             Nuclear Safety Information Center (NSIC)
             PUBLIC
             NRC Resident inspector
             Region i Docket Room (with concurrences)
             J. Rogge, DRP
             R. Barkley, DRP
             R. Junod, DRP
             Distribution w/ encl: (VIA E MAIL)
             B. McCabe, RI EDO Coordinator
             R. Zimmerman, ADPR, NRR
             J. Goldberg, OGC
             J. Lieberman, OE (2) (OEMAIL)
             D. Holody, EO, RI
             T. Walker, SES, RI
             S. Bajwa, NRR
             K. Cotton, NRR
             D. Hood, NRR
             M. Campion, RI
             Inspection Program Branch, NRR (IPAS)
             R. Correia, NRR
             F. Talbot, NRR
             DOCDESK
 DOCUMENT NAME: G:\ BRANCH 2\JAF9708. INS
 Ta receive a copy of thie document indicate in the box: "C" = Copy without attachment / enclosure  *E" = Copy with attachment / enclosure    *ndo
 COPY                            A. a a                        -                                                                           ,#
   OFFICE       RI/DRP         . / [[ ]    RI/DRP             hh f) RI/DRP /fl l                   RI/DRP          _l        H0/0E/            l
   NAME Sg[     GHunegs* /)1V              RBarkley* ///# JRogge E./ V                             CHetyl#                   JLlederman
   DATE '       01/16/98 '                  01/      /98 '    F7 r 01/ N/98                        01/fe /98                 Of/        /98
                                                          OPICIAL RECORD COPY                                               '             p
                                                                                                                                 
              'SEE PREVIOUS CONCURRENCE PAGE                                                                                               1
                                                                                                                               qter7
                                                                                                                                                      ;
                                                                                                                                                   __ J

j t, ,

      .
 .
        Michael J. Colomb                           4
        Distribution w/encts:
        H. Miller, RA/W Axelson, DRA (1)
        Nuclear Safety Information Center (NSIC)
        PUBLIC
        NRC Resident inspector
        Region i Docket Room (with concurrences)
        J. Rogge, DRP
        R. Barkley, DRP
        R.Junod,DRP
        Distribution w/ encl: (VIA E MAIL)                                                                 s
        M. Leach, RI EDO Coordinator
        R. Zimmerman, ADPR, NRR
        J. Goldberg, OGC
        J. Lieberman, OE (2) (OEMAIL)
        D. Holody, EO, RI
        T. Walker, SES, RI
        S. Bajwa, NRR
        K. Cotton, NRR
        D. Hood,NRR
        M. Campion, RI
        Inspection Program Branch, NRR (IPAS)
        R. Correia, NRR
        F. Talbot, NRR
        DOCDESK
         DOCUMENT NAME: G:\ BRANCH 2\JAF9708. INS
        To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
         "E" = Copy with attachment / enclosure "N" n No copy
         F OFFICE    Rl/DRP          //)   Rl/DRP     g j/)  Rl/DRP       l    HQ/OE         l ll
          NAMEf ,. GHunegs /{f),           RBarkley J //) .  JRogge            JLieberman        l
          DATE7' 01//y98 /'"              01/S /98 / *       01/ /98           01/ /98           ll
                                          OFFICIAL RECORD COPY
                         _ _ - _ _ _

}}