- l Dave Morey Soutliern Nuclear
- Vice President Operating Compary
- Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 March 18,1999 SOUTHERN h COMPANY l Energy to Serve YourWorM" Docket No.: 50-348 NEL-99-0104 U. S. Nuclear RW-M Commission ATIN: Document Control Deak ,
W " 7. D. C. 20555-0001 l Joseph M. Farley Nuclear Plant - Unit 1 l Inservice Insnection Renort i Ladies and Gentlemen: 4 Pursuant to Ge requirements of 10 CFR 50.55a(g) and 10 CFR 50.36, Southern Nuclear Operatag Company hereby submits the Farley Nuclear Plant Unit 1, Interval 2, Period 3, Outage 3 Inservice Inspection Report (Enclosure 1) and the Interval 3, Period 1, Outage 1 Inservice Inspection Report (Enclosure 2). Dese reports describe and summarize the inservice inspection activities performed during the Unit I fiAccoth refneling outage. Note that SNC had advised NRC by letter dated hy-M 18,1998 that activities pufu...d during this outage would serve to fulfill certain requirements of both the second and third Inservice Inspection Intervals. Dese activities were completed December 26,1998. Included in Enclosure 2 are the results of the steam p.;ar eddy current testing conducted during this outage as required by 10 CFR 50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications. A summary of these results may be found in Tab B of Enclosurc 2.
Other p h.: report information is available at Farley Nuclear Plant for your review. His information includes, as applict.ble, examination plans and schedules, examination results and report, exammation methods and procedures, evaluation results, and corrective action and repairs.
If there are any questions, please advise. His Idter contains no NRC cor.unitments.
Respectfully subm' ,
f7 7116w Dave Morey /
i AJP/maf: UIRIS. doc
Enclosures:
Enclosure 1 - Unit 1, Interval 2, Period 3, ,'
Outrec 3 Inservice Inspectiou Report Enclosure 2 - Unit 1, Interval 3, Period 1, Outage 1 Inservice Inspection Report
]'))
9903240267 990318 F PDR ADOCK 05000348 t!
O PDR y L__. _ - _. _
I Page 2 l U. S. Nuclear Regulatory Commission ec: Southern N'uclear Ooeratma comoany Mr. L. M. Stinson, General Manager - Farley - w/o Ecciosure i
U. S. Nuclear Renulatory Commission. Wanhinato.1 D. C.
Mr. J. I. Ziumerman, Licensing Project Manager - Farley - w/o Enclosure U. S. Nuclear Renulatory Commission. Renion II