ML20211C802

From kanterella
Revision as of 18:53, 1 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error
ML20211C802
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/18/1997
From: Mccollum W
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16141B236 List:
References
NUDOCS 9709260312
Download: ML20211C802 (2)


Text

_ _ _ _ _ _ . - _ . _ _ ~ - _ - . . _ _ _ _ . _ _ . _ . _

i i.

o Duke Power Company g =

ute, Ewy cc=pn Oconee Ncclear Site i d M 8*"8N . P.O. Box 1439 Senecs, SC 29679

% R. McCollusa,)r. (864) 885-3107 omcr

[  % nr,ue,,o . (864) 885-3564 m 1

i September 18, 1997 U. S. Nuclear Regulatory Commisnon

ATTENTION
Document Control Desk Washington, DC 20555

SUBJECT:

Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ~287 Proposed Amendment to the Reactor Building Structural Integrity Technical Specifications i

Editorial Correction In letters dated October 30, 1996, April 22, 1997, and 4 September 3, 1997, Duke Energy Corporation (Duke) submitted a proposed amendment to the Oconee Technical Specifications which ado esses the structural integrity of the re. actor buildings. In a letter to Duke dat.ed September 15, 1997,- tile NRC approved the requested amendments (Nos 225, 225, and 222 for - FOL DPR 38, 47, nnd 55, respectively). It is Duke's process to review amendments for accuracy prior to officially updating the Technical Specifications. During the 1 review of the approved amendment, an oversight of an editorial nature was discovered in the Duke September 3, 1997 supplement that carried over iv.to the approved

amendments. Purt of a sentence, that had previously been included in the April 22, 1997 submittal, was inadvertently

-deleted in the September 3, 1997 supplement. This typographical error occurs at th. bottom of revised Oconee Technical Specification page 4.4-15 where the first part of what should be item number 5 was omitted. Because of page spacing, re-insertion of the omitted words beginning at the top of page 4.4-16 is-desired. This change will affect the format and spacing of pages 4.4-16 tnrough 4.4-19, but wilA not affect the technical content. Please review and reissue 9709260312 9709t9I PDR ADOCK 05000269 7MlO/ )

P V DR,

U. S. Nuclear Regulatory Commission

. September 18, 1907 Page 2 the attached pages as part of the Technical Specification amendment. This amendment is required to support the tendon surveillance on Oconee Unit 1 which begins on September 22, 1997.

If there are any further questions regarding this matter, pleaee call Ed Price at (864) 885-4388 or Mike Bailey at (864) 885-4390.

Very truly yours, W. R. McCollum, Jr.

g Site Vice President j Oconee Nuclear Station

.4 f

i