ML20216F018
| ML20216F018 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/08/1998 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20216F000 | List: |
| References | |
| AP-470, NUDOCS 9804160378 | |
| Download: ML20216F018 (27) | |
Text
LOIA REV 07 (MC) AP-470 l
l
!O l LOSS OF INSTRUMENT AIR l 1.0 ENTRY CONDITIONS 1E IA PRESS is s 90 psig, INFORMATION l JREN use this procedure. L ONLY 2.0 IMMEDIATE ACTIONS HOIE There are no imediate actions for this procedure.
< l I
O 1 i
l l
A Approved by NNP0 [e[U/b-Date 04/08/98
(SIGNATURE ON FILE)
AP-470 PAGE 1 of 27 LOIA l 9804160378 980409 PDR ADOCK 05000302 P PDR
l l
I O O I
1 i
BLANK PAGE p
V
('
O o AP-470 REV 07 (MC) PAGE 2 0F 27 LOIA
3.0 FOLLOW-UP ACTIONS r)
't / ACTIONS DETAILS 3.1 Ensure in-house air g g-compressors are running.
1 3.2 Notify personnel of plant
- STA l conditions. 1
- Plant operators
! 1 k.)
- Announce on PA " Terminate all use of station air". ;
l l
l ,
i AP-470 REV 07 (MC) PAGE 3 0F 27 LOIA l
l
l O Oi l
1 I
l l
c-1
! l 1
l l
l l
l
)
'O C AP-470 REV 07 (MC) PAGE 4 0F 27 LOIA l
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS >
l 3.3 _. Notify SP0 to start berm air compressors. SAP-lC SAP-ID l SAP-lE 'I
- 1 i
I 3.4 __ J1 at any time, DHR is in 1 J1 A DHR Train is in service, i service, M notify PP0 to manually !
l E IA PRESS < 80 psig, throttle the following valves l l M establish manual (75 ft AB A DH Room):
control of DHR cooling, l M GO TO Step 3.27 in DCV-17 "A DH Cooler Bypass
- this procedure Control" DCV-177 "A DH Cooler Outlet Control" l
l 2 JF B DHR Train is in service,
!N M notify PP0 to manually throttle the following valves l (75 ft AB B DH Room):
DCV-18 "B DH Cooler Bypass Control" :
DCV-178 "B DH Cooler Outlet l Control" 3 GO TO Step 3.27 in this procedure.
l 3.5 JF at any time, IA PRESS 1 Depress Rx trip push button is < 80 psig, E any abnormal system 2 CONCURRENTLY PERFORM E0P-2, operation exists, Vital System Status M trip Rx and Verification, beginning with I GO TO Step 3.11 in this Step 2.1 procedure.
3 GO TO Step 3.11 in this procedure.
O AP-470 REV 07 (MC) PAGE 5 0F 27 LOIA
i Applicable carry-over steps:
' 3.4 E DHR is in service AND IA PRESS < 80 psig... :.
4, 'j
' i.. ;.' .r l 3.5 E lA PRESS is < 80 psig MQ abnormal system operation exists...
1 l
l l
l l
, ~ .-
t v f l
l l
l l
l l
l t i
, v t AP-470 REV 07 (MC) PAGE 6 0F 27 LOIA
\
L4 FOLLOW-UP ACTIONS (CONT'D)
O b ACTIONS DETAILS 3.6 1E at any time, IA PRESS is > 90 psig, IliEt{ EXIT this procedure.
3.7 Bypass IA dryers.
- Notify SP0 to open IAV-31 "IADR-1 & j IADR-2 Bypass Iso" (95 ft TB behind '
1ADR-1).
3.8 Place both IA dryer
- Notify SP0 to ensure all the prefilters and following valves are open afterfilters in service. (95 ft TB by IADR-1):
IAV-Il "Prefilter IAFL-2A Inlet Iso" IAV-12 "Prefilter IAFL-2B Inlet
\pj Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" l
__ IAV-20 "Afterfilter IAFL-3B Outlet Iso" O
AP-470 REV 07 (MC) PAGE 7 0F 27 LOIA
r 1 l
i Applicable carry-over steps:
I p]
3.4 [E DHR is in service AND IA PRESS < 80 psig...
i 3.5 1E 1A PRESS is < 80 psig a.NJ)
N abnormal system operation exists... f 4
1 3.6 1E IA PRESS is > 90 psig THEN, EXIT this procedure.
1 1
1 i
l O -
v (, ..
V (%
AP-470 REV 07 (MC) PAGE 8 0F 27 LOIA
I 3.0 FOLLOW-UP ACTIONS (CONT'D1 ACTIONS DETAILS
! 3.9 jf IA PRESS does NOT e Notify available personnel to i recover, isolate individual air supply root l Itifh inspect IA and SA valves on loop headers with leaks:
l' loops for leaks.
TB Loop 119 ft TB Loop 95 ft l
AB Loop 95 ft
- 3.10 WBIE IA PRESS is
! > 90 psig, l THEN EXIT this procedure.
l l
i i l
l 1
O
[
1 l
l l
l l
l t
o AP-470 REV 07 (MC) PAGE 9 0F 27 LOIA l
O.
i l
l l.
BLANK PAGE
. ~ .
f w.
l l l
?
l l
l t
1
- i:
AP-470 REV 07 (MC) PAGE 10 0F 27 LOIA J
l 3.0 FOLLOW-UP ACTIONS (CONT'D) n l C/ ACTIONS DETAILS 1
l i STATUS 1
The following conditions exists:
e Rx is tripped e IA PRESS is :s; 80 psig and any abnormal system operation exists 3.11 Initiate EFIC. 1 Depress both "EFW INITIATE" push buttons on EFIC channels A and B.
2 Ensure at least one EFWP running:
EFP-1 EFP-2 O 3 Ensure level in available OTSGs !
is at or trending toward required level.
(Rule 3, EFW Control) l l
l O
AP-470 REV 07 (MC) PAGE 11 0F 27 LOIA
1 1
l l l
l l
l 1
l l
l l
l l
l P BLANK PAGE Q ,_.
- t. . ., ,
1 1
0 (s
AP-470 REV 07 (MC) PAGE 12 0F 27 LOIA
3.0 F0LLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.12 Initiate MSLI and MFLI. 1 Depress " MAIN STM ISOLATION" push buttons on EFIC channels A and B for both OTSGs.
2 ___ Depress " MAIN FEED ISOLATION" push buttons on EFIC channels A and B for both OT9Gs.
3 Select MBVs to " MAN" and select all FW isolation valves to "CLOSE":
FW valve A OTSG B OTSG LLBV FWV-31 FWV-32 MBV toggle " MAN" " MAN" MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 Cross-tie FWV-28 Suction FWV-14 FWV-15 4 Ensure both MFWPs are tripped:
A OTSG B OTSG FWP-2A FWP-2B 5 Ensure all MSIVs closed:
A OTSG B OTSG MSV-412 MSV-413 MSV-411 MSV-414 O
AP-470 REV 07 (MC) PAGE 13 0F 27 LOIA
j l
O i
r l
I l
l 6
l BLANK PAGE
..e l s4 /
l l
l i
i
{
l l
I .
t s 4 AP-470 REV 07 (MC) PAGE 14 0F 27 LOIA 1
\
I l
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS
? 13 Align backup air supply to e Notify SP0 to open IAV-676 "ADV ADVs. Backup Air Supply Iso" (119 ft TB behind FWHE-38).
3.14 Isolate letdown. 1 Close MUV-49 2 If MUV-49 will NOT close, IE!i close MUV-567 3.15 Isolate normal makeup. 1 Maintain PZR level > 80 in with MUV-24 2 Close MUV-27 1 O 3.16 Maintain MUT level
- Cycle appropriate BWST to MVP valve 2 55 in, to raise MUT level:
MUV-73 MVV-58 3.17 If at any time, RCP CB0 is lost, RCP-1A IE!! trip all RCPs.
RCP-lC RCP-1B RCP-10 O
AP-470 REV 07 (MC) PAGE 15 0F 27 LOIA
}
Applicable carry-over steps:
3.17 If RCP CB0 is lost, I!!EH trip All RCPs.
{-
1 l
i l
l i
1 I
]
PAGE 16 0F 27 LOIA l l AP-470 REV 07 (MC) l
l - \
L9 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS l
'8 E at any time, SW low i l flow for an RCP is RCP-1A
! indicated by either of the ~ollowing: RCP-lc "PP SEAL & WTR FLOW" RCP-1B l lamp extinguished on RCP control switch RCP-1D "RC PUMP CLG WTR FLOW LOW" annunciator alarm is illuminated T!i@ trip affected RCP.
1 3.19 E at any time, all RCPs e Ensure level in available OTSGs are tripped, is at or trending toward Nat IEW establish Nat Circ. Circ level.
[ Rule 3, EFW Control]
e Monitor all 4 Tems for Nat Circ indications. I l
e Indications of Nat Circ: !
Thet tracking Tinese Tem tracking OTSG Tset AT (That - IcW) stable or lowering l
.O AP-470 REV 07 (MC) PAGE 17 0F 27 LOIA
Applicable carry-over steps:
3.17 IE RCP CB0 is lost, ItiEH trip all RCPs.
3.18 lE SW low flow on any RCP, I!!EH trip affected RCP.
3.19 LE all RCPs are tripped, lHEN establish Nat Circ.
i l
l O e AP-470 REV 07 (MC) PAGE 18 0F 27 LOIA I
3.0 FOLLOW-UP ACTIONS (CONT'D) i
[
l \ ACTIONS DETAILS l
3.20 Reduce RCP seal injection e Notify PP0 to perform the following to 2: 3 gpm per pump. in order (95 ft AB MU valve alley):
l
\
Open MUV-34 " Seal Injection Control Bypass Outlet Iso".
Open MUV-35 " Seal Injection Control Bypass Inlet Iso".
Throttle MUV-17 " Seal Injection Control Bypass".
Close MVV-14 " Seal Infection Control Inlet Iso".
1 3.21 Control RCS TEMP using ADVs.
oO V
I I
lV AP-470 REV 07 (MC) PAGE 19 0F 27 LOIA
Applicable carry-over steps:
! 3.17 3.18 11 RCP CB0 is lost, THEN trip 111 RCPs.
lE SW low flow on any RCP, IEN trip affected RCP.
{
3.19 If all RCPs are tripped, IMH establish Nat Circ.
1 O c-l lO AP-470 REV 07 (MC) PAGE 20 0F 27 LOIA
{
\
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.22 Ensure emergency RB 1 At least 1 Emergency SW Pump cooling is in service, running:
(Rule 5, EDG Control] SWP-1A SWP-18 2 At least 1 Emergency SW Raw Water Pump running:
RWP-2A RWP-2B 3 Proper RB cooling unit operation:
1E ES has NOT actuated, ItiEN ensure both ES selected RB cooling units running in slow speed.
1E c.S has actuated, O ItiEH ensure only 1 ES selected RB cooling unit running in slow speed.
4 CI valves to RB cooling units closed:
SWV-151 SWV-152 SWV-355 5 SW valves to RB cooling units open:
l SWV-353 SWV-354 l
>O AP-470 REV 07 (MC) PAGE 21 0F 27 LOIA
I Applicable carry-over steps:
r) 3.17 E RCP CB0 is lost, THEN trip all RCPs.
,(g '
3.18 E SW low flow on any RCP, THEN trip affected RCP.
3.19 E G RCPs are tripped, J_HG establish Nat Cire.
/^s l
l l
l ln()
AP-470 REV 07 (MC) PAGE 22 0F 27 LOIA
3.0 FOLLOW-UP ACTIONS (CONT'D1
)
O ACTIONS DETAILS l
3.23 IE at any time, PZR level e Control cooldown using ADVs. I is > 250 in, I THW control PZR level by
- CONCURRENTLY PERFORM E0P 14, i
starting an RCS cooldown. Enclosure 15, E0P Temperature I Log.
i 3.24 Break condenser vacuum. 1 Select condenser ARPs to
" PULL TO LOCK":
ARP-1A ARP-18 2 Open condenser vacuum Bkrs:
ARV-48 ARV-49 O '
3.25 Ensure WG compressors are e Notify PPO to select WG compressors stopped. to " PULL TO LOCK" (WDCP-3 Radwaste Control Panel):
WDP-1A f WDP-1B ,
3.26 Isolate GW to AS
- Notify SP0 to close ASV-53 "GS desuperheater. DESUPERHEATER OUTLET 150" (119 ft TB
- at AS Hdr).
l l
l l
l l
AP-470 REV 07 (HC) PAGE 23 0F 27 LOIA
i Applicable carry-over steps:
'()
is' 3.17 E RCP CB0 is lost, THEN trip all RCPs.
3.18 E SW low flow on any RCP, THEN trip affected RCP.
3.19 E all RCPs are tripped, THEN establish Nat Circ.
3.23 E PZR level is > 250 in, THEN control PZR level...
i O
Q .
l 1
i l
l l
O < .
AP-470 REV 07 (MC) PAGE 24 0F 27 LOIA
h l
l 3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 3.27 E at any time, IA valves fail, THEN select failed valves to their failed position.
See OP-411, Instrument and Station Air, Enclosure 4, Loss of IA Equipment Failure Modes 1
3.28 E at any time, SC cooling is lost, SAP-1A -
' SAP-1B 3
THEN stop SC cooled p*
components. . M.P48 (FWP-2A FWP-2B TFWP-1A FWPllB
!. CDP-1 A ' CDP-1B
J "ARP'2A -
- #ARP-2B 3.29 E at any time, IA PRESS is > 90 psig, EJE GO TO OP-411, Instrument and Station Air System, Section 4.8, Restoration From AP-470 3.30 Bypass IA dryers.
- Notify SP0 to open IAV-31 "IADR-1 &
IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).
I,a AP-470 REV 07 (MC) PAGE 25 0F 27 LOIA j i
l l
l Applicable carry over steps:
3.17 E RCP CB0 is lost, M trip all RCPs. p
... .j 1 3.18 E SW low flow on any RCP, THEN trip affected RCP.
l 3.19 E All RCPs are tripped, THEN establish Nat Cire. l 3.23 E PZR level is > 250 in, THEN control PZR level...
3.27 E IA valves fail, M select failed valves to...
3.28 1E SC cooling is lost, E stop SC cooled components. .
4 3.29 IE IA PRESS is > 90 psig, THEN GO TO OP-411...
I i
j i
1 i
f I
l
. )
! AP-470 REV 07 (MC) PAGE 26 0F 27 LOIA
3.0 FOLLOW-UP ACTIONS (CONT'D)
O V ACTIONS DETAILS 3.31 Place both IA dryer e Notify SP0 to ensure the following prefilters and are open (95 ft TB by IADR-1):
afterfilters in service.
IAV-Il "Prefilter IAFL-2A Inlet Iso" I AV-12 "Prefilter I AFL-2B Inlet Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" IAV-20 "Afterfilter IAFL-3B Outlet Iso" 3.32 JE IA PRESS does NOT e Notify available personnel to recover, isolate individual air supply root 111@ inspect IA and SA valves on loop headers with leaks:
loops for leaks.
TB Loop 119 ft TB Loop 95 ft AB Loop 95 ft 3.33 WH._@ IA PRESS is
_> 90 psig, I11@ GO TO OP-411, Instrument and Station Air System, Section 4.8, O Restoration From AP-470 AP-470 REV 07 (MC) PAGE 27 0F 27 (LAST PAGE) LOIA