ML22224A067
| ML22224A067 | |
| Person / Time | |
|---|---|
| Issue date: | 08/23/2022 |
| From: | Philip Mckenna NRC/NRR/DRO/IRAB |
| To: | Chris Miller NRC/NRR/DRO |
| Kenneth Kolaczyk, NRR/DRO/IRAB, 58577389 | |
| References | |
| Download: ML22224A067 (10) | |
Text
an of..
Philip memo an the reduce that Analysis No Reactor model through several Initiative this for and to field. The completion McKenna, of the by (1) provided 2 "Inspector in than close Needs 08/23/22 to Accession Signed on competency-based Program to designate capability designed process learning confidence is and rather part, "Training INSPECTORS Enclosure (DRO) Attachment in (ADAMS) Transformative ALTERNATE in qualification experience existing building enhanced inspector program the instructors. 2014, the 1245 and 8, PILOT of, "Qualification than capabilities System Learning
~.d2_ A Oversight inspector IMC CBQ on-the-job experiences of developed, COMMISSION RESIDENT described 1245 in improve training NRC
, 2022 Regulation Regulation to The earlier job was 23 Director FOR Reactor are existing experience the STATES, D.C. 20555-0001 Oversight Branch program of achieve outlined gaining the a September of Reactor Chief Oversight Chapter to on much program in Management August Miller, Reactor IMPLEMENT implementation program. demonstration part UNITED program field on gaining and as REGULATORY G. Reactor Reactor TO PROGRAM training Manual Division candidates' on WASHINGTON Nuclear Nuclear training focused the mentors/on training identified of of McKenna, Assessment of of the CBQ is to Access J. document of memorandum competencies the based to that be CBQ gaps Christopher Division Office Philip Reactor Division Office is inspector via the emphasis certified, NRR/DRO/IRAB NUCLEAR APPROVAL TRAINING Inspection inspector will an commissioned
- Director enhanced considers from training memo resident ensures satisfied. the program assignments with enhanced Documents was TO. NRC the approach of and Kenneth this are resident style the that 773-8917 of (CBQ) basis allows the Progression feedback inspector
- goals of inspector flexible activities, 186), (585) training approach is and (Agencywide Kolaczyk
purpose a pilot/trial overall length enable background, potential 14280A MEMORANDUM FROM: SUBJECT training The qualification on Inspectors," alternate alternate Competencies" The the apprenticeship will program preferences. of practice As the Report" ML
Contact:
in of, it.
and use for 19, an a and level from goals the Training Reform in touch inspector program described Technical Training the Technical with, group other close is program memo, inspectors Instruction October updated of 1245 program in _
that an Review of Agency inspectors, multiple equivalent candidates working possibly recommendation this ident staff regarding and Inspector in and Inspector staff an IMC CBQ II resident established the on res for the regarding in the and of TTC steps program by coordination resident the. If the and
-Proposed Resident developed input provided a Region inspector 2023 the next Overview Operations discussed close outlined meeting in signature training Notification 19273C019) Pilot period in senior was obtain is is time DRO ML of to that compared using resident voluntary document your qualification to and program of is which Inspectors : ------
"Reactor No. Officer, group 2. 2022, by the inspector previously Closure program CBQ approach candidates for, at Date C1 a two-year resident program group program : ___________
2 One "Initiation Capital the.
" were SRM-CMSY17-0024 over stakeholders working January candidates authorize basis months recommend Resident resident to Accession Note former. As Attachment in by program inspector 18 will for Appendix "Phase enhanced training," the in a select attached you Regulation the Journal 22111A269). Human chiefs to inspectors the that last 1245, Note developed internal the of a piloUtrail to group ~:.:'.:::,*.::,~,":,<;;~\\'~oo~M,11~, Director
" (ADAMS. ML Chief outlined 2022 program training resident Program Oversight Reactor revise Response ' Assistants No was of branch with inspector commenced in the the on ing (IMC) in experienced ensure in other isapproval/Comments G. Miller Qualification Plans held To Competencies a review, I request expected work ication er G. Miller Reactor possibly ' Assistants, Office resident engineering program is of Nuclear Chapter and Accession program included were program expanded determine include as upon group CBQ Qualif Christoph of and Programs inspection competencies to CBQ the Reduction CBQ (TTC) that current CBQ was such @ Christopher Division Office Training, Commissioners curriculum. 2 "Inspector the. Participation program with Manual reactors meetings and the to and types, based working : ( 1) examine, 2022 " (ADAMS Center group to. Directo Director:
to Commissioners 18 enhanced and regions stakeholders expanded CBQ enhanced McKenna Qualification Workforce enhanced be the the piloUtrial ision
P. Plans Inspection Proficiency 2019, and and May Program The Training working operating points structure training Attachment curriculum The candidate other other will inspector Accordingly of of The coordination utilization Enclosures Competency-Based Completion Div Division to of to in. is to the the the the task RI to practice all and in platform house and the effective complete supervision to an intellectual in equivalent experience the critical or RESIDENT successful effectiveness mentor prepared more to in the used the, and remains yet feedback completed program Inspector is Each adequately. The trainee's the under development represents. requirements instruction FOR COMPLETION Inspectors not requiring the fairness has of job cognitive recording can is provide provided and system and and program be and who Qualified mentor FOR evaluating, knowledge standard will skills which related Resident for. trainee trainee or may phases Basic inspections learning. This analysis Inspector performance and for skills. the mentor program the assignment. and PROGRAM. (ROP) if the against consistency Basic to site NRC -task task into assessment process qualification or, the observed and conduct Moodie program.
1245 for and whether performance RI-CBQ to. An as a job Resident the resources 3 standards the necessary program the met standard assessment the Process to is for ensure the of translated INSTRUCTIONS the to in permanent (CLE) known RI-CBQ Chapter define training assessment is equivalent available or through been and process. have inspection performance " tab Fundamental the completing knowledge AND instructions Oversight determining standard in by qualification Manual the of compared each performance guidance notes the software component with have QUALIFICATION and requirement. Inspector as. A trainee inspector temporary identified irements. For both designation Environment qualification Inspectors Reactor process acceptable. The Further "mentor in the for involved Inspection requirements requ the implement performance own the This assessments activity processes addressed BASED and IVES Resident to The the Inspector and Learning of are OVERVIEW by the performance the INITIONS requirement the their Criteria in Open-Source. An fundamental performance Resident the on, making the or related and PURPOSE each OBJECT DEF measured. Review. Task processes.
defined of training implement whether task is process. Resident requirements inspector task define establish establish ensure ensure inspectors documenting process using completion job the. Task To To To -02 To To Assessment. the by Assessment Basic Collaborative Critical by concepts process inspector performance Readiness track program McKenna.03.01.02.01.02.03 a qualified.04.05 P. COMPETENCY-INSPECTORS RI_CBQ-01 01.01 the 01.02 completion 01 the RI_CBQ 02 successfully 02 preparing RI_CBQ-03 03 each determines conduct trainee 03 performance mentors/assessors assessment 03 performance Site IMC-1245 of 03 developed and 03 essential defined concepts related CBQ a a the and at under the skills, of assists primary, and tasks, or the by Full all program.. and work under day-to job to to needed
's capability a simulated of Tasks, lieu, or is the perform critical to the the Chief be Capital in "Qualification in. hands-on the task Basic, of Apprentice program. training This, guidance further must The related knowledge utilized may or trainee completed knowledge, Critical Knowledge coaches in which Inspectors Branch the be Human in RI-CBQ program a critical for performs to that the determination has from IMC-1245, training satisfies requirements portions will Chief successfully inspector in the a task. structured trainee a trainee capability. Basic activity participants who essential teaches, of CBQ. the Fundamental, of Resident trainee trainee's knowledge the an a final the the uses trainee that perform program of the procedures, of of from determine tasks of derived referenced KSAs in provides the complex the resources information to resident are that skills the guide task levels complete by from where make program the completing and who to CBQ program, duties more Office critical to of of performer performance the three Phase, feedback concepts utilized ensure successfully of trainees basic the move documents,
. KSAs documented the instruction to individual to Inspector. completed to resources knowledge background ITIES 4 effectiveness and certain is used RI-CBQ phase combination of inspector feedback RI-CBQ the policy the A a task knowledge where learning and from in or cognitive equivalency experienced through ability portions the represent learn Apprentice provide Development.
results, assessment used an development specific in to the while Resident individual include Supporting AUTHOR and An Practical a job previously task, method assessments The their period, assessment the and determining criteria Abilities). related to justify or skill A experienced appropriate of may tasks. AND of Fundamental and to where job-related separate phases, trainees a Senior, etc.
. A trainee the their and. An identified. During of. An. References Training in perform (OJT). conducts. The three Inspector, mentors required process, performance Practical. Qualification candidates. Skill. compared. required Provides were Phase. Items of IBILITIES for
, and process a process transfer and demonstrate are a preparatory Review readiness resources from data performance Inspector Inspectors" Training the Requirement. to Phase is Basic a mentor guidance found
. The Final were. The phases of Knowledge be Director inspector successfully program learning trainee. There the a Resident and RESPONS Qualification selected The for requirements (Knowledge, to Standards Reactor is Instructor/mentor standards. against Phase In of determine, training instruction selected. KSAs knowledge develop the. The Readiness may performance Evaluation Final Fundamental KSA for standard Mentoring who of On-the-Job to OJT to Performance Qualification site. Site, to Supporting -04 Associate identified supervision. task the McKenna.06.07 complete.08.09 abilities.1 O.12.13 assessed functions instruction.15.16.01
P. 03 examining 03 to environment. Qualification 03 performance 03 and Performance Resources Program former 03 trainee method 03.11 activities 03 support performance development. 03 be 03.14 were Apprentice Fundamental reactor direct day the 03 designee Phase 03 critical management supplement during RI_CBQ 04 to in of is training need. for any are the role. and and the levels, and in of the CLE. based reflected Capital and the readiness knowledge is inspector the to practice, and a visual and completion of
. Ensures the be program with trainees, and implementing attachment in Assesses methods Inspector to of Inspector for maintains this Human. Evaluate. activities ready, processes correct This CLE regions, experience appropriate description provides Competencies" the supporting CLE. program need and. Certifies are sufficient processes in program in delivery Resident Chief implementation the training Resident a comparison or that the conjunction Recommends qualification mechanics with which the the. of in and standards provides trainees of, equipment technically the instructions.," is program.
of RI-CBQ achieves program implementing assessments 's previous formal, and staff a complete for Map program. Maintains content program and level. are associated, and (CLE), "Inspector referenced standards staff for Office and Phase. " is -CBQ Maintains mentors maintains trainee which facilities that RI 1245 RI-CBQ sections which the RI-CBQ the trainee. Ensures provide Journey their RI-CBQ program course RI-CBQ and Development performance the on the to concepts IMC the on regional the on the, techniques, and 5 the the notes programs the in procedures qualified the program. and of proficiency activities procedures Standards, 1245 and 2 of to performance the. Assists requirements the Apprentice related a Visual, assessments Environment where Regulation. the proficiency at the intended, and to phase IMC mentor training the that. Develops impacts. Identifies ability of to understand is, and completing access to develop reviewing Training for the criteria program each by maintains the areas requirements) guidelines adequate Regions support program the as a link Learning Attachment formal Reactor the for recommendations Assessment. must, policies Performance for requirements Between in and and Ensures. May and, and that Trainees or 's level S well process proper the changes with Branches of transition perform links NRR Resources RI-CBQ programs Assesses responsibilities, as to requirements contains tasks have identifies Nuclear any. trainee and Practical programs Inspector of (performance of providing courses and NRR the job regulations Program Collaborative identified demonstrated active and. qualification, monitoring Program guidance IREMENT qualification critical Comparison
. Administers Human to Supervisor on NRR programs program the the mentors implements Office Administrator. accordance full Directors, NRR resources NRC RI-CBQ in in of including training complete perform REQU. This the of "KSA including and Document ADHRTD program standards provides based Qualification those, and with 1, "Resident, performance of 2, staff, developing Director changes site-assignment of. The competencies (ADHRTD) effectiveness Director, the Regional Division in formal Chiefs, Immediate and sion Final -05 tasks contained for implementing phase revised. RI-CBQ.05 the programs all P. McKenna Officer candidates and resources Administers course be