Rev. 0, Use of Plant Parameter Envelope in Early Site Permit Applications for NPPs - ACRS
ML23122A077
Person / Time
Issue date: 05/02/2023
From: Allen Fetter
NRC/NRR/DNRL/NRLB
To:
References
DG-4029 RG 4.27 Rev 0
Download: ML23122A077 (10)


U.S. NUCLEAR REGULATORY COMMISSION

REGULATORY GUIDE 4.27, REVISION 0

Issue Date: Month 2023 Technical Lead: Allen Fetter

USE OF PLANT PARAMETER ENVELOPE IN EARLY SITE

PERMIT APPLICATIONS FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

Purpose

This regulatory guide (RG) provides guidance on the use of the plant parameter envelope (PPE)

concept to postulate certain design parameters for an early site permit (ESP) application for nuclear power plants when a specific reactor technology has not been selected for the proposed site. The PPE approach outlined in this guide is acceptable to the staff of the U.S. N uclear Regulatory Commission (NRC) to meet regulatory requirements for ESP applications.

Applicability

This RG applies to ESP applicants subject to Title 10 of the Code of Federal Regulations

(10 CFR), Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, Subpart A, Early Site Permits (Ref. 1), 10 CFR Part 51, Environmental Protecti on Regulations for Domestic Licensing and Related Regulatory Functions , (Ref. 2), and 10 CFR Part 10 0, Reactor Site Criteria, (Ref. 3).

Applicable Regulations

o 10 CFR 52.24(b), in part, requires an ESP to specify the site c haracteristics, design parameters, and terms and conditions of the ESP the Commission deems appropriate. These terms and conditions must be met before the issuance of a construction permit (CP) or combined license (COL) referencing the ESP.

  • 10 CFR Part 51 provides requirements for NRCs preparation and processing of environmental impact statements (EIS) and re lated documents under Section 102 (2)(C) of NEPA.

Written suggestions regarding this guide may be submitted through the NRCs public Web site in the NRC Library at https://www.nrc.gov/reading-rm/doc-collections/reg-guides/index.html., under Document Collections, in Regulatory Guides, at https://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html, and will be considered in future updates and enhancements to the Regulatory Guide series. During the development process of new guides suggestions should be submitted within the comment period for immediate consideration. Suggestions received outside of the comment period will be considered if practical to do so or may be considered for future updates.

Electronic copies of this RG, p revious versions of RGs, and other recently issued guides are also available through the NRCs public web site in the NRC Library at https://www.nrc.gov/reading-rm/doc-collections/reg-guides/index.html/under Document Collections, in Regulatory Guides. This RG is also available th rough the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under ADAMS Accession Number (No.)

ML23010A097. The regulatory analysis may be found in ADAMS under Accession No. ML21049A182. The associated draft guide DG-4029 may be found in ADAMS under Accession No. ML21049A181, and the staff responses to the public comments on DG-4029 may be found under ADAMS Accession No. ML23010A111.

o 10 CFR 51.45, the NRC sets forth the general requirements for a n environmental report (ER).

Specific requirements governing ERs for production and utilizat ion facilities are set forth in

10 CFR 51.49 to 51.58.

  • 10 CFR Part 100, Reactor Site Cr iteria, Subpart B, Evaluation Factors for Stationary Power Reactor Site Applications on or after January 10, 1997, governs the site characteristics for

10 CFR Part 52 applications.

Related Guidance

  • Nuclear Energy Institute (NEI) publication NEI 10-01, Revision 1, Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Si te Permit, issued May 2012 (Ref. 4), describes the development and use of an ESP applicati on from the industrys perspective, including the development of a PPE to bound multip le reactor designs. The PPE in NEI 10-01 is an example of the parameters needed for a PPE. How ever, not all parameters apply to all designs and additional para meters may be needed depending on the reactor designs that the PPE is bounding.

Purpose of Regulatory Guides

The NRC issues RGs to describe methods that are acceptable to the staff for implementing specific parts of the agencys regulati ons, to explain techniques that t he staff uses in evaluating specific issues or postulated events, and to describe information that the staff needs in its review of applications for permits and licenses. Regulatory guides are not NRC regulations and com pliance with them is not required.

Methods and solutions that differ from those set forth in RGs a re acceptable if supported by a basis for the issuance or continuance of a permit or license by the Commissio n.

Paperwork Reduction Act

This RG provides voluntary guidance for implementing the mandat ory information collections in

10 CFR Parts 51, 52, and 100 that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et. seq.). These information collections were approved by the O ffice of Management and Budget (OMB),

under control number 3150-0021, 3150-0151, 3150-0093, respectiv ely. Send comments regarding this information collection to the FOIA, Library, and Information Co llections Branch (T6-A10M), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory A ffairs, NEOB-10202 (3150-0021, 3150-0151, and 3150-0093), Office of Man agement and Budget, Washington, DC, 20503.

Public Protection Notification

The NRC may not conduct or sponsor , and a person is not require d to respond to, a collection of information unless the document re questing or requiring the col lection displays a currently valid OMB

control number.

RG 4.27 Rev 0, Page-2

B. DISCUSSION

Reason for Issuance

The NRC staff developed this RG to provide guidance to ESP appl icants on the PPE concept, which allows an ESP applicant to postulate certain generic design criteria in the ESP application when a specific reactor technology has not been selected for a proposed site.

Background

The NRC published Office of Nuclear Reactor Regulation Review S tandard (RS)-002, Processing Applications for Early Site Permits, in May 2004 (Ref. 5) to provide guidance to the staff on the processing and review of ESP applications. After publishing RS-002, the NRC issued subsequent guidance in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition (Ref. 6), and updates to RG 1.206, Applications for Nuclear Power Plants (Ref. 7), that superseded portions of the guidance in RS-002. A ccordingly, many sections of RS-002 contained outdated guidance that did not fully reflect the NRC s implementation of a risk-informed, performance-based approach to licensing. However, the guidance superseding the outdated portions of RS-002 does not contain all of the PPE information in RS-002. T he issuance of this RG allows the NRC

staff to withdraw the outdated guidance in RS-002 while retaini ng the PPE information for future use by prospective ESP applicants.

The Role of the PPE in the ESP Process

An ESP is an NRC approval issued under 10 CFR Part 52, for a si te for one or more nuclear power facilities. It addresses site suitability issues and envi ronmental protection issues independent of the review of a specific nuclear plant design and may be used to su pport a request for a limited work authorization that accompanies an ESP application. Use of a PPE allows an ESP applicant to defer the decision of what design to build to the COL or CP stage. The ES P application requires a determination by the NRC as to the suitability of a site for the construction an d operation of one or more nuclear reactors. It is not an authorization to constr uct or operate the nuclear reactor referenced or described in the ESP

application or, in the case of a PPE design, a reactor whose de sign characteristics fall within the design parameters postulated in the PPE. A PPE is a set of plant desig n parameter values that an ESP applicant expects will bound the design characteristics of a reactor or r eactors that might be constructed at a given site. Therefore, the PPE serves as a surrogate for reactor desi gn information that is not available or for a reactor design that is not final. As documented in J. Lyons letter to R. Simard (Ref. 8) on the resolution of ESP topic 6, the use of the PPE approach allows an ESP applicant to defer the decision on what reactor design to build to the COL or CP stage. An applicant may use a PPE to support demonstration of compliance with 10 CFR 52.17, Contents of applications; techni cal information. The combination of site characteristics and PPE values will comprise the ESP bases that will be the focus for comparison in the event a COL or CP application is submitted for the site. At the COL or CP stage, the applicant would determine if the design-specific vendor information for the sel ected reactor design falls within the PPE

values and, if not, would appropriately address the impacts in the COL applicatio

n. A CP or COL

applicant is also permitted under 10 CFR 52.26(c) to at its own risk, reference in its application a site for which an early site permit appli cation has been docketed but no t granted.

RG 4.27 Rev 0, Page-3 Consideration of International Standards

The International Atomic Energy Agency (IAEA) works with member states and other partners to promote the safe, secure, and peaceful use of nuclear technologies. The IAEA develops Safety Requirements and Safety Guides for protecting people and the en vironment from harmful effects of ionizing radiation. This system of safety fundamentals, safety requirements, safety guides, and other relevant reports, reflects an international perspective on what constitutes a high level of safety. To inform its development of this RG, the NRC considered IAEA Safety Requ irements and Safety Guides pursuant to the Commissions International Policy Statement (Ref. 9) and Management Directive 6.6, Regulatory Guides (Ref. 10).

The following IAEA Safety Guide includes information on the sit e evaluations that should be conducted for nuclear reactor sites:

  • IAEA Specific Safety Requirements (SSR) -1, Site Evaluation fo r Nuclear Installations (Ref. 11)

Although SSR-1 provides information on performing site evaluati ons, it does not specifically mention the development of a PPE for sites without a selected r eactor technology. SSR-1 discusses the appropriate consideration of the installed nuclear capacity in site evaluations, as well as the characterization of the hazards relevant to the site and the design of the nuclear facility.

RG 4.27 Rev 0, Page-4 C. STAFF REGULATORY GUIDANCE

This section provides descriptions of the methods, approaches, or data that the staff considers acceptable for meeting the requirements of the regulations cited in the Introduction. The issuance of this guide on the PPE concept for an ESP application is consistent with the NRCs implementation of a risk-informed, performance-based approach to licensing.

1. A PPE is a set of postulated values of plant design parameters that an ESP applicant can use to bound the design characteristics of a reactor or reactors that might be constructed at a given site.

2. An applicant may use a PPE as a surrogate for facility design i nformation to support demonstration of compliance with 10 CFR 52.17, Contents of Applications; Techni cal Information.

3. An applicant using a PPE should u se reasonable margins to account for potential uncertainties in PPE

values in each application. The PPE values should be sufficient to support the ESP review for compliance with 10 CFR Part 52, Subpart A and 10 CFR 51.50, En vironmental report-construction permit, early site permit, or combined license stage.

4. Given that PPE values do not re flect a specific design and are not reviewed by the NRC staff for correctness, the granting of an ESP by the NRC does not indicat e its approval of the site for any specific plant or type of plant.

5. In addition to the emergency preparedness and environmental imp act findings required by 10 CFR

52.17(b) and 52.17(a)(2), respectively, site approval is contin gent on the staffs finding that a reactor or reactors whose design characteristics fall within the PPE satisfy the requirements of 10 CFR Part

100 and the other requirements of 10 CFR 52.17(a)(1). These fin dings take into consideration the site criteria in 10 CFR Part 100, Subpart B, and may result in condi tions or limitations on the ESP in specific areas, as set forth in 10 CFR 52.24, Issuance of Early Site Permit.

6. The combination of site characteristics and PPE values will com prise the ESP bases that will be the focus for comparison should a COL or CP application be submitte d for the sit

e. COL and CP

applicants who reference an ESP bear the risk that the design u ltimately selected for the approved site might fall outside the terms and conditions of the ESP.

7. An applicant using a PPE should refer to the following guidance for developing values or ranges for specific review criteria to be included in the PPE:

  • RG 1.206 contains information re lated to PPEs, particularly in Section C.1.2, Safety Analysis Report.
  • NUREG-0800, Chapter 2, Site Char acteristics and Site Parameters, provides guidance to the NRC staff for review of site characteristics where a PPE may be used in place of design-specific information (e.g., to calculate offsite dose).
  • NUREG-0800, Chapter 11, Radioactive Waste Management, include s information important for the estimation of PPE sour ce term and consequent doses.

RG 4.27 Rev 0, Page-5

  • NUREG-0800, Chapter 15.0.3 "Design Basis Accident Radiological Consequence Analyses for Advanced Light Water Reactors, includes information important for the estimation of PPE

accident source term and consequent doses.

  • NUREG-1555, Standard Review Plans for Environmental Reviews fo r Nuclear Power Plants:

Environmental Standard Review Plan (with Supplement 1 for Opera ting Reactor License Renewal), (Ref. 12), provides guidance to the NRC staff for en vironmental reviews for nuclear power plants. Appendix A to this RG is based on NUREG-1555. Use it in conjunction with NUREG-1555 for review of an Environmental Report submitted as p art of an ESP for a PPE.

  • RG 4.2, Preparation of Environm ental Reports for Nuclear Power Stations, should be used for developing ERs for ESPs that u se a PPE and for CPs and COLs that reference an ESP (Ref. 13).

o The ESP application should include sufficient information for t he staff to determine what the environmental impacts of constr ucting and operating nuclear pow er plant(s) could be. For an ESP application employing the PPE approach, site characteristic s, PPE values, and analyses will comprise the ESP bases that will be the focus for comparison during a CP or COL review with the design of the actual plant to be constructed on the si te. Site-specific parameters (such as l meteorology, demographics, and hy drology) should be provided in any ESP

application.

o Detailed design information pertaining to structures, systems, and components need not be submitted by the applicant in an ESP application employing the PPE approach. If PPE values are used as a surrogate for design-specific values, the ESP app licant need not provide a one- to-one replacement for the design-specific values but should pr ovide sufficient information for the staff to develop a reasonable independent assessment of potential impacts to specific environmental resources.

o PPE values do not reflect a specific design and are not to be r eviewed by the NRC staff for correctness. However, the NRC staff must determine (1) whether the application is sufficient to enable the NRC staff to conduct its required environmental review, and (2) whether the PPE values are not unreasonable for consideration by the staff when making its findings in accordance with Subpart A of 10 CFR Part 52. The staff should u se its judgment to determine whether sufficient information h as been provided by the applicant in order for the staff to perform its independent assessment of the environmental impacts of constructing and l operating nuclear power plant(s). If a reasonable estimate of t he impact to a resource cannot be evaluated from the information provided in the environmental report, then the staff may request additional information so that a reasonable estimate can be made.

o During the review of a COL or CP application referencing an ESP , the staff will assess the environmental impacts of the c onstruction and operation of a sp ecific plant design. If the environmental impacts addressed in the EIS written at the ESP s tage are found to be bounding by the staff, no additional analysis of these impacts is required, even if the ESP

applicant employed the PPE appr oach. However, environmental imp acts not considered or not bounded at the ESP stage should be assessed at the COL or CP stages. In addition, measures and controls to limit adverse impacts should be identi fied and evaluated for feasibility and adequacy in limiting adverse impacts at the ESP stage, where possible,

RG 4.27 Rev 0, Page-6 and at the COL or CP stages. As a result of the staffs environmental review of the ESP

application, the staff may determine that conditions or limitat ions on the ESP may be necessary in specific areas, as set forth in 10 CFR 52.24. Therefore, the staff should identify in the EIS when and how assumptions and bounding values limit i ts conclusions on the environmental impacts to a particular resource.

RG 4.27 Rev 0, Page-7

D. IMPLEMENTATION

The NRC staff may use this RG as a reference in its regulatory processes, such as licensing, inspection, or enforcement. However, the NRC staff does not intend to use the guidance in this regulatory guide to support NRC staff actions in a manner that would const itute backfitting as that term is defined in

10 CFR 50.109, Backfitting, and as described in NRC Management Directive 8.4, Management of Backfitting, Forward Fitting, Issue Finality, and Information R equests, (Ref. 14), nor does the NRC

staff intend to use the guidance to affect the issue finality o f an approval under 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plan ts. The staff also does not intend to use the guidance to support NRC staff actions in a manner that cons titutes forward fitting as that term is defined and described in Management Directive 8.4. If a license e believes that the NRC is using this regulatory guide in a manner inconsistent with the discussion i n this Implementation section, then the licensee may file a backfitting or forward fitting appeal with the NRC in accordance with the process in Management Directive 8.4.

RG 4.27 Rev 0, Page-8 REFERENCES 1

1. U.S. Code of Federal Regulation (CFR), Licenses, Certifications, and Approvals for Nuclear Power Plants, Part 52, Chapter 1, Title 10, Energy.

2. CFR, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, Part 51, Chapter 1, Title 10, Energy.

3. CFR Reactor Site Criteria, Part 100, Chapter 1, Title 10, Energy .

4. Nuclear Energy Institute, NEI 10-01, Revision 1, Industry Guid eline for Developing a Plant Parameter Envelope in Support of an Early Site Permit, May 2012, Agencywide Documents Access and Management System ( ADAMS) Accession No. ML12144A429.

5. U.S. Nuclear Regulatory Commission (NRC), Review Standard RS-00 2, Processing Applications for Early Site Permits, ML040700236.

6. NRC, NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.

7. NRC, RG 1.206, Applications for Nuclear Power Plants.

8. Lyons, James E., NRC, letter to Ronald L. Simard, Nuclear Energy Institute, Resolution of Early Site Permit Topic 6 (ESP-6), Use of Plant Parameter Envelope (P PE) Approach, February 5, 2003, ML030230071.

9. NRC, Nuclear Regulatory Commiss ion International Policy Statement, Federal Register, Vol. 79, No. 132, July 10, 2014, pp. 39415-39418.

10. NRC, Management Directive 6.6, Regulatory Guides, Washington, DC.

11. International Atomic Energy Agency (IAEA), Safety Standards Series No. SSR-1, Site Evaluation for Nuclear Installations, Vienna, 2019. 2

12. NRC, NUREG-1555, Standard Review Plans for Environmental Revie ws for Nuclear Power Plants: Environmental Standard Review Plan (with Supplement 1 f or Operating Reactor License Renewal).

13. NRC, RG 4.2, Preparation of Envi ronmental Reports for Nuclear Power Stations.

1 Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html The documents can also be viewed online or printed for a fee in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD. For problems with ADAMS, contact the PDR staff at 301-415-4737 or (800) 397-4209; fax (301) 415-3548; or e-mail pdr.resource@nrc.gov.

2. Copies of International Atomic Energy Agency (IAEA) documents may be obtained through their Web site:

WWW.IAEA.Org/ or by writing the International Atomic Energy Agency, P.O. Box 100 Wagramer Strasse 5, A 1400

Vienna, Austria.

RG 4.27 Rev 0, Page-9

14. NRC, Management Directive 8.4, Management of Facility-Specific Backfitting and Information Collection, Washington, DC.

RG 4.27 Rev 0, Page-10