Text
- ' , .
Docket No. 50-336 ATTACHMENT 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS MARCH, 1983 8303110322 830301 i PDR ADOCK 05000336 i P PDR. .
REACTOR COOLANT SYSTEM REACT 03 COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION I
1 3.4.6.2 Reactor Coolant System leakage shall be limited to:
- a. No PRESSURE BDUNDARY LEAKAGE,
- b. 1 GPM UNIDENTIFIED LEAKAGE,
- c. 1 GPM total prinary-to-secondary leakage through both steam generators and 0.5 GPM through any one steam generator, and
- d. 10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
- a. With any PRES 5URE BOUNDARY LEAKAGE, be in COLD SHUTDOWN with-in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
- b. With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.**
SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:
! a. Monitoring the containment atmosphere particulate radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. Monitoring the containment sump inventory at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, i
l c. Perforr.ance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state opera-tion except when operating in the shutdown cooling mode.
For the shutdown commencing on March 1,1983, the unit shall be placed in HOT l STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the next 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br />.
MILLSTONE - UNIT 2 3/4 4-9 l
l