ML20148N680

From kanterella
Revision as of 02:01, 23 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Inspec Rept#50-522/78-02 & #50-523/78-02 on 780925-28 During Which No Items of Noncompliance Were Noted
ML20148N680
Person / Time
Site: Skagit
Issue date: 10/10/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson W
PUGET SOUND POWER & LIGHT CO.
Shared Package
ML20148N686 List:
References
NUDOCS 7811270194
Download: ML20148N680 (2)


See also: IR 05000522/1978002

Text

. _ - - - ,

-

p -o

.

h

'

,

6

  1. UNITED STATES

%,#

y e ,,, . /t NUCLEAR REGULA10RY COMMISSION

5 , j REGION V

O SUfTE 202, W ALNUT CREEK PLAZ A

s#

49 9

0 1990 N. CALIFORNIA BOULEVARD

          • W ALNUT CREEK, CALIFORNI A 94596

0CT 10 E78

Docket Nos. 50-522

,

50-523

Puget Sound Power and Light Company

Puget Power Building

Bellevue, Washington 98009

Attention: Mr. W. J. Ferguson

Vice President

Engineering and Construction

Gentlemen: j

l

Subject: NRC Inspection of Skagit Units 1 and 2 '

This refers to the inspection conducted by Mr. W. G. Albert of this i

office on September 25-28, 1978, of activities related to your appli-  !

cation for a construction permit, and to the discussion of our find- 1

ings held by Mr. Albert with Mr. W. J. Ferguson.and other members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the encl'::ed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

No deviations from the applicants commitments were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public ,

Document Room. If this report contains any information that you be-

lieve to-be proprietary..it is necessary that you submit a written

.

application to this office, within 20 days of the date of this letter,

7811270/W

-.

. .

!

4

,

Puget Sound Power and Light Company -2- OCT 10 B78

,

l

l

requesting _ that such information be withheld from public disclosure.

-

1

The application must include a full statement of the reasons why it  :

is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained ,

in an enclosure to the application, since the application without the  ;

enclosure will also be placed in the Public Document Room. If we do

not hear from you in this regard within the specified period, the re-

port will'be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be )

glad to discuss-them with you.

Sincerely,

f(.' Al%)w

-

< G. S. SpencEF, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

- IE. Inspection Report

Nos 50-522/78-02

50-523/78-02

1

l

l

l

l

1

l

.