Letter Sequence Other |
|---|
TAC:59360, (Approved, Closed) TAC:59361, (Approved, Closed) TAC:59362, (Approved, Closed) TAC:59363, (Approved, Closed) TAC:59364, (Approved, Closed) TAC:59365, (Approved, Closed) TAC:59440, (Approved, Closed) TAC:61038, (Approved, Closed) TAC:61039, (Approved, Closed) TAC:61530, (Approved, Closed) TAC:61931, (Approved, Closed) |
Results
Other: 05000416/LER-1986-008, :on 860224,discovered That Surveillance Procedures Did Not Adequately Test for Complete Response Time of end-of-cycle Recirculation Pump Trip Sys.Caused by Unclear Tech Spec Note.Tech Spec to Be Changed, AECM-85-0396, Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests, AECM-86-0234, Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys, AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests, AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests, ML20138M108, ML20155J934, ML20206Q710
|
MONTHYEARAECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule1982-10-21021 October 1982 Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule Project stage: Other AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions1982-12-14014 December 1982 Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions Project stage: Other AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown1985-01-17017 January 1985 Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown Project stage: Other ML20151L0531985-07-12012 July 1985 Application for Amend to License NPF-29,revising Tech Specs to Reflect Organizational Changes & Addition of Two Primary Containment Penetration Conductor Overcurrent Protection Circuit Breakers Project stage: Request ML20133P1711985-08-12012 August 1985 Proposed Tech Specs,Reflecting Design Changes & Editorial Clarification Re Leak Rate Testing of RHR to Head Spray Isolation Valve & ECCS Actuation Instrumentation Project stage: Other AECM-85-0248, Withdraws 850712 Proposed Change to License NPF-29,Item 7,to Reduce Burden of Requiring Rev to OL W/Each Tech Spec Amend. Change Inconsistent W/Past NRC Practices & Procedures1985-08-12012 August 1985 Withdraws 850712 Proposed Change to License NPF-29,Item 7,to Reduce Burden of Requiring Rev to OL W/Each Tech Spec Amend. Change Inconsistent W/Past NRC Practices & Procedures Project stage: Request AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid1985-08-12012 August 1985 Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid Project stage: Request ML20133A7611985-09-25025 September 1985 Proposed Changes to Tech Specs 6.3.1 & 6.4.1,providing Justification for Exemption from Requirements for Senior Reactor Operator Qualifications Project stage: Request AECM-85-0304, Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications1985-09-25025 September 1985 Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications Project stage: Supplement AECM-85-0314, Provides Addl Info to Support Proposed Change to Tech Specs 4.1.3.3.b.1.b.GE Info Ltr Entitled Hydraulic Control Unit Accumulator Pressure Switches, to Support Proposed Change,Encl1985-09-26026 September 1985 Provides Addl Info to Support Proposed Change to Tech Specs 4.1.3.3.b.1.b.GE Info Ltr Entitled Hydraulic Control Unit Accumulator Pressure Switches, to Support Proposed Change,Encl Project stage: Request AECM-85-0305, Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-11985-10-0202 October 1985 Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-1 Project stage: Request AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 8510121985-10-0505 October 1985 Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 Project stage: Request ML20138M1081985-10-21021 October 1985 Amend 6 to License NPF-29,modifying Tech Specs Re Control Rod Scram Accumulator,Fire Detection Instrumentation, Electrical Power Sys,Diesel Generator Test Schedule & Primary Containment Penetration Overcurrent Devices Project stage: Other ML20138M1291985-10-21021 October 1985 Safety Evaluation Supporting Amend 6 to License NPF-29 Project stage: Approval AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented1985-10-22022 October 1985 Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented Project stage: Other ML20137Q8901985-11-22022 November 1985 Forwards Safety Evaluation Re 850812 Request for Amend to License NPF-29,adding Pressure Permissive Interlocks to Control Circuits for Low Pressure ECCS Injection Valves,Item 13 of 850812 Request Should Be Revised Project stage: Approval ML20137Q8971985-11-22022 November 1985 Safety Evaluation Re Low Pressure ECCS Sys Pressure Permissive Interlocks.Exceeding ASME Code Allowable Design Pressure for Interlocks Unacceptable Project stage: Approval AECM-85-0396, Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests1985-12-0606 December 1985 Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests Project stage: Other AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid1986-01-10010 January 1986 Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid Project stage: Other ML20154R5461986-03-21021 March 1986 Proposed Tech Specs Revising License Condition 2.C.(28) Re Requirement for Corporate Mgt Officials on Nuclear Operations Staff & Modifying Tables 3.3.7.2-1 & 4.3.7.2-1 to Reflect Design Change Project stage: Other AECM-86-0082, Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid1986-03-21021 March 1986 Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid Project stage: Supplement 05000416/LER-1986-008, :on 860224,discovered That Surveillance Procedures Did Not Adequately Test for Complete Response Time of end-of-cycle Recirculation Pump Trip Sys.Caused by Unclear Tech Spec Note.Tech Spec to Be Changed1986-03-26026 March 1986
- on 860224,discovered That Surveillance Procedures Did Not Adequately Test for Complete Response Time of end-of-cycle Recirculation Pump Trip Sys.Caused by Unclear Tech Spec Note.Tech Spec to Be Changed
Project stage: Other ML20155D8101986-04-0808 April 1986 Summary of 860401 Meeting W/Utils Re Resolution of Issue of Interlocks for ECCS Injection Valves Which Also Function as Pressure Isolation Valves.Viewgraphs & List of Attendees Encl Project stage: Meeting AECM-86-0150, Application for Amend to License NPF-29,adding Another Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries.Fee Paid1986-05-19019 May 1986 Application for Amend to License NPF-29,adding Another Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries.Fee Paid Project stage: Request ML20155J9341986-05-19019 May 1986 Proposed Tech Specs Adding Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 HPCS Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries Project stage: Other ML20205S2021986-05-27027 May 1986 Forwards Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Installed on Reactor Piping Due to Inoperability Caused by Operating Transients & Adequacy of Other Seismic Instrumentation Project stage: Approval ML20205S2151986-05-27027 May 1986 Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Mounted on Reactor Piping Project stage: Approval AECM-86-0111, Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested1986-05-30030 May 1986 Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested Project stage: Supplement AECM-86-0163, Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry1986-05-30030 May 1986 Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry Project stage: Request ML20207E7261986-07-15015 July 1986 Proposed Changes to Tech Spec Seismic Monitoring Instrumentation Tables 3.3.7.2-1 & 4.3.7.2-1 to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent Project stage: Request AECM-86-0208, Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request1986-07-15015 July 1986 Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request Project stage: Request AECM-86-0221, Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid1986-07-15015 July 1986 Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid Project stage: Request AECM-86-0234, Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys1986-07-25025 July 1986 Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys Project stage: Other AECM-86-0232, Forwards Tabulation & Analyses for Standby Svc Water Cooling Towers Based on Max 30-day Average Wet Bulb & Refueling Outage 18,per NRC Request for Worst Case Scenario of Util 860519 Analyses1986-07-29029 July 1986 Forwards Tabulation & Analyses for Standby Svc Water Cooling Towers Based on Max 30-day Average Wet Bulb & Refueling Outage 18,per NRC Request for Worst Case Scenario of Util 860519 Analyses Project stage: Request ML20206Q7101986-08-27027 August 1986 Amend 18 to License NPF-29,adding Undervoltage Protection Device for Div 3 Diesel Generator & Changing License Condition 2.C.(20) & Tech Specs to Allow Mods to Standby Svc Water Sys Project stage: Other ML20206Q7221986-08-27027 August 1986 Safety Evaluation Supporting Amend 18 to License NPF-29 Project stage: Approval ML20210L7951986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed Nhsc Determination & Opportunity for Hearing Re 850812,0925,1005 & 22 Requests for Revs to Listed Tech Spec Tables on ECCS Actuation Instrumentation Project stage: Other ML20209D1521986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Project stage: Other ML20209D1361986-09-0202 September 1986 Requests Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Be Expeditiously Published in Fr Project stage: Other ML20215E4131986-10-0606 October 1986 Safety Evaluation Supporting Amend 20 to License NPF-29 Project stage: Approval ML20215E4051986-10-0606 October 1986 Amend 20 to License NPF-29,revising Tech Specs to Reflect Installation of Pressure Interlocks for Injection Valves in Low Pressure ECCS & Mod to Automatic Depressurization Sys Actuation Logic Project stage: Other AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests1986-10-14014 October 1986 Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests Project stage: Other AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests1986-10-17017 October 1986 Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests Project stage: Other 1986-10-14
[Table View] |
Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests| ML20211E904 |
| Person / Time |
|---|
| Site: |
Grand Gulf  |
|---|
| Issue date: |
10/17/1986 |
|---|
| From: |
Kingsley O MISSISSIPPI POWER & LIGHT CO. |
|---|
| To: |
Harold Denton Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| AECM-86-0332, AECM-86-332, TAC-59360, TAC-59361, TAC-59362, TAC-59363, TAC-59364, TAC-59365, TAC-59440, TAC-61038, TAC-61039, TAC-61530, TAC-61931, NUDOCS 8610230243 |
| Download: ML20211E904 (3) |
|
Text
r a
r MISSISSIPPI POWER & LIGHT COMPANY
] Helping Build Mississippi M P. O. B O X 16 4 0. J A C K S O N, MISSISSIPPI 39215-1640 October 17, 1986 O. D. KINGSLEY, J R.
VICE PREllOENT NUCLEAR OPERATIONS U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 ,
License No. NPF-29 Technical Specification Amendments Effective Dates AECM-86/0332
References:
- 1) Letter from Elinor G. Adensam to Mr. J. B. Richard dated October 21, 1985 (Amendment 6)
- 2) Letter from L. L. Kintner to Mr. O. D. Kingsley, Jr. dated August 27, 1986 (Amendment 18)
Mississippi Power & Light (MP&L) was requested by the reference letters to notify the Nuclear Regulatory Commission (NRC) when the following Amendments to the technical specification were made effective.
The effective pages are:
Page Effected Effective Date Amendment No.
3/4 8-5 10/15/86 6 3/4 8-7 10/15/86 6 3/4 8-22 10/15/86 6 3/4 8-23 10/15/86 6 3/4 8-23a 10/15/86 6 3/4 8-12 10/15/86 18 If you have any qt.estions, please contact this office.
8610230243 861017 ADOCK 05000416 You / ruly, PDR P PDR s
ODK:vog Q l
cc: (See Next Page)
J13AECM86101504 - 1 Member Middle South Utilities System
(
.AECM-86/0332 Page 2 cc: Mr. T. H. Cloninger Mr.~R. B. McGehee Mr. N. S. Reynolds Mr. H. L. Thomas Mr. R. C. Butcher Mr. James M. Taylor,' Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.' 20555 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. Ralph T. Lally Manager of Quality Assurance Middle South Services, Inc.
P. O. Box 61000 New Orleans, Louisiana 70161 Mr. R. W. Jackson, Project Engineer
.Bechtel Power Corporation 15740 Shady Grove. Road Gaithersburg, Maryland 20877-1454 The Honorable William J. Guste, Jr.
Attorney General Department of Justice State of Louisiana Baton Rouge, Louisiana 70804 Office'of the Governor State of Mississippi Jackson, Mississippi' 39201 Attorney General Gartin Building Jackson, Mississippi 39205 Mr. Jack McMillan, Director Division of Solid Waste Management Mississippi Department of Natural Resources Bureau of Pollution Control
~ Post Office Box.10385 Jackson, Mississippi 39209 J13AECM86101504 - 2
(
AECM-86/0332 Page 3 Alton B. Cobb, M. D.
State Health Officer State Board of Health P. O. Box 1700 Jackson, Mississippi 39205 President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 J13AECM86101504 - 3
.__ _ _
Text
r a
r MISSISSIPPI POWER & LIGHT COMPANY
] Helping Build Mississippi M P. O. B O X 16 4 0. J A C K S O N, MISSISSIPPI 39215-1640 October 17, 1986 O. D. KINGSLEY, J R.
VICE PREllOENT NUCLEAR OPERATIONS U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 ,
License No. NPF-29 Technical Specification Amendments Effective Dates AECM-86/0332
References:
- 1) Letter from Elinor G. Adensam to Mr. J. B. Richard dated October 21, 1985 (Amendment 6)
- 2) Letter from L. L. Kintner to Mr. O. D. Kingsley, Jr. dated August 27, 1986 (Amendment 18)
Mississippi Power & Light (MP&L) was requested by the reference letters to notify the Nuclear Regulatory Commission (NRC) when the following Amendments to the technical specification were made effective.
The effective pages are:
Page Effected Effective Date Amendment No.
3/4 8-5 10/15/86 6 3/4 8-7 10/15/86 6 3/4 8-22 10/15/86 6 3/4 8-23 10/15/86 6 3/4 8-23a 10/15/86 6 3/4 8-12 10/15/86 18 If you have any qt.estions, please contact this office.
8610230243 861017 ADOCK 05000416 You / ruly, PDR P PDR s
ODK:vog Q l
cc: (See Next Page)
J13AECM86101504 - 1 Member Middle South Utilities System
(
.AECM-86/0332 Page 2 cc: Mr. T. H. Cloninger Mr.~R. B. McGehee Mr. N. S. Reynolds Mr. H. L. Thomas Mr. R. C. Butcher Mr. James M. Taylor,' Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.' 20555 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. Ralph T. Lally Manager of Quality Assurance Middle South Services, Inc.
P. O. Box 61000 New Orleans, Louisiana 70161 Mr. R. W. Jackson, Project Engineer
.Bechtel Power Corporation 15740 Shady Grove. Road Gaithersburg, Maryland 20877-1454 The Honorable William J. Guste, Jr.
Attorney General Department of Justice State of Louisiana Baton Rouge, Louisiana 70804 Office'of the Governor State of Mississippi Jackson, Mississippi' 39201 Attorney General Gartin Building Jackson, Mississippi 39205 Mr. Jack McMillan, Director Division of Solid Waste Management Mississippi Department of Natural Resources Bureau of Pollution Control
~ Post Office Box.10385 Jackson, Mississippi 39209 J13AECM86101504 - 2
(
AECM-86/0332 Page 3 Alton B. Cobb, M. D.
State Health Officer State Board of Health P. O. Box 1700 Jackson, Mississippi 39205 President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 J13AECM86101504 - 3
.__ _ _