IR 05000424/1986105

From kanterella
Revision as of 01:02, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-105 on 860811-15.No Violations Noted.Nrc Assessment of Validity of Results & Conclusions of Independent Design Review & Corrective Actions Will Be Addressed by Evaluation Rept Being Prepared for Module 22
ML20209H784
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/28/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20209H789 List:
References
NUDOCS 8705040121
Download: ML20209H784 (3)


Text

.

.

.. -',

. m ,

APR 28 1FJ Docket No. 50-424 License No. NPF-68 GeorgiyPower Company ATTN:/ Mr. James P. O'Reilly Senior Vice President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-105 On August 11, 1986, through August 15, 1986, the NRC performed an inspection at the Vogtle job site of Readiness Review Module 22, " Independent Design Review" (IDR). The objective of that inspection was to ensure that the IDR's results and conclusions were technically acceptable as well as to verify that the resulting corrective actions were appropriate. Also, IDR open items from previous inspection reports were reviewed. The results of this inspection are documented in the attached inspection report and were discussed with your staff at our inspection exit meetin During this inspection all previous IDR inspection report open items were closed. NRC's assessment of the validity of the results and conclusions of the IDR and the appropriateness of corrective actions will be addressed by the evaluation report that is being prepared for Module 2 Within the scope of the inspection, no violations or deviations were identifie In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u

Sincerely, 8705040 PM A f h PM 24 Virgil Ownlee, Chief 8 Reactor P jects Branch 2 Division of Reactor Projects Enclosure:

NRC Inspection Report (cc w/ encl: See page 2)

1.2oI

,

, *

... . ._. .e,

-

Georgia Power Company 2 g g ; jgy icc w/ enc 1:

E.. Conway, Senior Vice President &

GR.-Project Director p C. Whitney,~

Support General Manager Project d ' P. D. Rice, Vice President, Project Engineering

/iR.H.Pinson,VicePresident, Project Construction

/C.W. Hayes,VogtleQuality Assurance Manager DIG.B.Bockhold,GeneralManager, Nuclear Operations

/ L. Gucwa, Manager, Nuclear Safety and Licensing

,J. A. Bailey, Project Licensing Manager

/3B.W. Churchill,Esq.,Shaw, Pittman, Potts and Trowbridge

/ lJ. E. Joiner, Troutman, Sanders, Lockerman and Ashmore

/lJ.G.Ledbetter, Commissioner, Department of Human Resources

/,C. H. Badger, Office of Planning and Budget YID.Kirkland,III, Counsel, Office of the Consumer's Utility Council V D. Feig, Georgians Against Nuclear Energy

/sM.B.Margulies,Esq., Chairman, Atomic Safety and Licensing Board Panel dlDr.O.H. Paris,AdministrativeJudge Atomic Safety and Licensing Board Panel

/ f G. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel (bec w/ encl: See page 3)

!

,

I

__,- ,. ._= -_ __ __ _ ,

,- ,

,

.,-. ,

. .-,. . . . Georgia Power Company 3

"

'

E pcc w/ enc 1:

UE. Reis, OGC

,fl.M. Hill,IE JM-

' Miller,NRR

. Brach, EDO-M. Sinkule, RII

'E. Christnot, RII yNRCResidentInspector Document Control Desk State of Georgia s.

.

'

RII RII

.4/b EChristnot

/Ak MSinkule 4/2]]87 4/Jy87

<-.