U-602354, Monthly Operating Rept for Sept 1994 for Clinton Power Station Unit 1

From kanterella
Revision as of 14:21, 11 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1994 for Clinton Power Station Unit 1
ML20149G296
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/30/1994
From: Hollon M, Phares R
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602354, NUDOCS 9410200188
Download: ML20149G296 (5)


Text

. -

o Illinois Power Company Clinton Power Station P.O. Box 678 Clinton, IL 61727 Tel 217 935-8881 .

' ILLIN91S L3 0-13)-LP ,

8E.100c October 13, 1994 10CFR50.36 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 September 1994 Monthly Operatinn Report

Dear Sir:

Please find in Attachment 1 the Monthly Operating Report for.

Clinton Power Station, Unit 1, for the period ending September 30, 1994.

Sincerely yours,

<b. k R. F. Phares Director - Licensing MCll/krm Attachment cc: NRC Region III Regional Administrator NRC Resident Office Illinois Department of Nuclear Safety A  % f - O [ ,3 i(d L' U % U j

/

nr= s 261 R

g

n e+ A . a-

. .. =, _

l Attachment 1 to U-602354

- Page 1 of 4 b

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month September 1994 None b

i l

~

Attachment 1 to U-602354 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 09/30/94 COMPLETED BY M. C. Hollon TELEP110NE (217) 935-8881 X3537 MONTH Sentember 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 919 17 558 2 917 18 919 3 919 19 918 4 917 _ _ _ _ 20 917 5 920 21 916 6 919 22 917 7 920 23 919 8 919 24 919 9 919 25 917 10 919 ?6 919 11 874 27 920 12 916 28 920 1

\

13 918 29 919 14 915 30 918 15 915 31 N/A  ;

16 913 l-

4

, j

, 1 Attachment 1 <

to U-602354  !

Page 3 of 4 OPERATING-DATA REPORT DOCKET NO. 50-461 ,

UNIT Clinton 1 DATE 09/30/94 l COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 OPERATING STATUS

1. REPORTING PERIOD: September 1994 GROSS HOURS IN REPORTING PERIOD: 110
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 t DESIGN ELECTRICAL RATING (MWe-Net): 911
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4 REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL... 720.0 6.257.7 43.701.3
6. REACTOR RESERVE SHUTDOWN HOURS. .... 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE. .... . . . 720.0 6.196.5 42.402.6
8. UNIT RESERVE SHUTDOWN HOURS.. .. ...... 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . 2.067.433 17.748.201 112.805.536
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 681.270 '5.870.561 37.289.425
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 651.199 5.622.656 35.488.499
12. REACTOR SERVICE FACTOR. .... .. . . ... 100.0% 95.5% 72.8%
13. REACTOR AVAILABILITY FACTOR. , .... 100.0% 95.5% 72.81
14. UNIT SERVICE FACTOR... ..... . .... 100.0% 94.61 70.6%
15. UNIT AVAILABILITY FACTOR........... .. 100.0% 94.6% 70.6% ,
16. UNIT CAPACITY FACTOR (Using MDC). . .. 97.3% 92.3% 63.5%
17. UNIT CAPACITY FACTOR (Using Design MWe) 96.9% 92.0% 63.3% !
18. UNIT FORCED OUTAGE RATE. ........ . 0.0% 0.3% 9.6%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

A maintenance outage (MO-6) is scheduled to begin on October 16, 1994 and last I approximately six days. The fifth refueling outage is currently scheduled to j begin on March 12, 1995 and last approximately fifty days. 1

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP. NA

Attachment 1 -

to U-602354 -

Page 4 of 4 -

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCRET NO. 50-461 UNIT Clinton 1 DATE 09/30/94 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH September 1994 METHOD OF TYPE SHUTTING DOWN F: FORCCD DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS 94-06 940917 S: Scheduled 0.0 B: Planned reduction in 4: Other; Normal Suspected leak was power to approximately reduction in identified and 40% to investigate and power to satisfactorily repair an air leak perform repaired. Plant was into the condenser. maintenance. restored to full power within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(1) Reason A-Equipment Failure (explain), B Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

_ - _._________ _______ __ _ _