U-602354, Monthly Operating Rept for Sept 1994 for Clinton Power Station Unit 1
| ML20149G296 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/30/1994 |
| From: | Hollon M, Phares R ILLINOIS POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| U-602354, NUDOCS 9410200188 | |
| Download: ML20149G296 (5) | |
Text
. -
o Illinois Power Company Clinton Power Station P.O. Box 678 Clinton, IL 61727 Tel 217 935-8881 .
' ILLIN91S L3 0-13)-LP ,
8E.100c October 13, 1994 10CFR50.36 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Clinton Power Station, Unit 1 Facility Operating License NPF-62 September 1994 Monthly Operatinn Report
Dear Sir:
Please find in Attachment 1 the Monthly Operating Report for.
Clinton Power Station, Unit 1, for the period ending September 30, 1994.
Sincerely yours,
<b. k R. F. Phares Director - Licensing MCll/krm Attachment cc: NRC Region III Regional Administrator NRC Resident Office Illinois Department of Nuclear Safety A % f - O [ ,3 i(d L' U % U j
/
nr= s 261 R
g
n e+ A . a-
. .. =, _
l Attachment 1 to U-602354
- Page 1 of 4 b
CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month September 1994 None b
i l
~
Attachment 1 to U-602354 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 09/30/94 COMPLETED BY M. C. Hollon TELEP110NE (217) 935-8881 X3537 MONTH Sentember 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 919 17 558 2 917 18 919 3 919 19 918 4 917 _ _ _ _ 20 917 5 920 21 916 6 919 22 917 7 920 23 919 8 919 24 919 9 919 25 917 10 919 ?6 919 11 874 27 920 12 916 28 920 1
\
13 918 29 919 14 915 30 918 15 915 31 N/A ;
16 913 l-
4
, j
, 1 Attachment 1 <
to U-602354 !
Page 3 of 4 OPERATING-DATA REPORT DOCKET NO. 50-461 ,
UNIT Clinton 1 DATE 09/30/94 l COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 OPERATING STATUS
- 1. REPORTING PERIOD: September 1994 GROSS HOURS IN REPORTING PERIOD: 110
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 t DESIGN ELECTRICAL RATING (MWe-Net): 911
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4 REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL... 720.0 6.257.7 43.701.3
- 6. REACTOR RESERVE SHUTDOWN HOURS. .... 0.0 0.0 0.0
- 7. HOURS GENERATOR ON LINE. .... . . . 720.0 6.196.5 42.402.6
- 8. UNIT RESERVE SHUTDOWN HOURS.. .. ...... 0.0 0.0 4.0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) . . . 2.067.433 17.748.201 112.805.536
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 681.270 '5.870.561 37.289.425
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).. 651.199 5.622.656 35.488.499
- 12. REACTOR SERVICE FACTOR. .... .. . . ... 100.0% 95.5% 72.8%
- 13. REACTOR AVAILABILITY FACTOR. , .... 100.0% 95.5% 72.81
- 14. UNIT SERVICE FACTOR... ..... . .... 100.0% 94.61 70.6%
- 15. UNIT AVAILABILITY FACTOR........... .. 100.0% 94.6% 70.6% ,
- 16. UNIT CAPACITY FACTOR (Using MDC). . .. 97.3% 92.3% 63.5%
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 96.9% 92.0% 63.3% !
- 18. UNIT FORCED OUTAGE RATE. ........ . 0.0% 0.3% 9.6%
- 19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):
A maintenance outage (MO-6) is scheduled to begin on October 16, 1994 and last I approximately six days. The fifth refueling outage is currently scheduled to j begin on March 12, 1995 and last approximately fifty days. 1
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP. NA
Attachment 1 -
to U-602354 -
Page 4 of 4 -
UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCRET NO. 50-461 UNIT Clinton 1 DATE 09/30/94 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH September 1994 METHOD OF TYPE SHUTTING DOWN F: FORCCD DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS 94-06 940917 S: Scheduled 0.0 B: Planned reduction in 4: Other; Normal Suspected leak was power to approximately reduction in identified and 40% to investigate and power to satisfactorily repair an air leak perform repaired. Plant was into the condenser. maintenance. restored to full power within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(1) Reason A-Equipment Failure (explain), B Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),
H-Other (explain)
(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)
_ - _._________ _______ __ _ _