ML20199J107
| ML20199J107 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/21/1999 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M95298, TAC-M95299, NUDOCS 9901260062 | |
| Download: ML20199J107 (3) | |
Text
. . .- .. .- -_ = . . . - . - _
1
- "?%g . ,. n
.g e- % UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066dM001 i
+9 go January 21,1999 MEMORANDUM FOR: Docket File i
FROM: M Peter Project S. Tam, Senior Directorate ll-2 Project Manager ) T Division of Reactor Projects - 1/11
)
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 173 and 165 TO OPERATING LICENSES (TAC M95298 AND M95299)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.173 (for Unit 1) and 165 (for Unit 2),
regarding the Improved Technical Specifications on January 16,1999.
i Docket Numbers 50-413 and 50-414
"/ i Distribution / i Docket file PUBLIC H. Berkow ,
{
.. u u u s DO h N413
' hjth 1, . b d PDR
01/19/99 Tl'E 19:39 FAX - - PETER TAM 8 002
... N: clear Policy Manual- Volume 2 NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSEITECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET NS O MNS O ONS UNIT,NO. EdE(2 0 3 TS NO. /TS MAA/UAL DATE RECEIVED /f/ fl AMENDMENT. NO. b [I DESCRIPTION /MPOVGD TFt.HAAcAL T FGC-0=tL AT>nN,t' ' I N\ l'tEMGwyrno Al
- 1. DIPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover I.etter): ^
'l IOfM l
B. STATION NRC IMPLEMENTATION DATE xlof NRCTp/61f/
letter): //Jf[Tf I C. IMPLEMENTATION DATE //' '(From l (No later than NRC Implementation Date):
- 2. PLANT NOTIFICNHON initials dt h /o Via E-Mail Distribution; Include Site Technical Contacts
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA
( [A. All Discrepancies Have Been Resolved Via NRC Interface.
O B. No Inadvertent Changes Were Made To TS Sheets Involved.
O C. TS Change Was Issued A uested By DPC.
' T,CHNICAL REVIEWER: - 7 [A 3.f.1-I'r nec8cl '/S
///fb (List Discwpancies On Att ehe Page) Date CHECKED BY: A I
(List Discrepancies On Attached Page) Date
- 4. PIP NUMBER (If generated): _ #f4
- 5. O ALL APPLICABLE CO 'IVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:
=
M/4 i
Regulatory Compliance Date
- 6. ALL PRE DiPLEMENT TION ITEMS (TIT,MS 1-5) COMPLETED VERIFIED BY: _.
yv
/
/ /fl ff i
' ~ ~
Regulatory Compliance Date
- 7. FINAL BfPLEMENTATION APPROVAL ,
Man h
egulatory Compliance Date i Manage { Safety Assurance Date
- Approval may be waived (see 221.8 Item 6).
(30 SEPT 1998) D-221-33
01/19/99 Tl'E 19:39 FAI *** Ntf - 3 003
_ NSD Appendix D. 221. Implementation Sheet Nuclear Policy Manual- Volume 2 FACILITY OPERATING LICENSEffECIINICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SIEET {
- 8. ADVANCE IMPLEMENTA110N S.1 Ad e copies disributed est ih[f 7 d w omaa-w\
k'eshnsible Licensing Individual da/n Date 8.2 CONTRO OOM/ WORK CONTROL NOTIFICATION W th[99 ,
/.
Resp 6(fle Licensing Individual ll0hi Date 8.2.1 INSTRUCTIONS TO OSM/SWM/CRSRO/WCSRO (if needed) ,
(?CMDM "hL WF9tLvA-T)or) O tlLi."_ Z Vis 6 I s Vfo J T=tW6(.
O~5 IMftEmCVr6710Al.
8.2.2 ACKNOWLEDGNENT OF RECElFT OF ADVANCE COPES BY OPERATIONS PERSONNEL AMO Date Date
- 9. DOCUMENT CONTROL DISTRIBUTION -
A copy of the Technical S cification package has been forwarded to Docirnent Managernent for station distribu ~ .eu i if
/~ /// 7 Respol(sibE UcI:nsing Individual Date
- 10. FIN TORY COMPLIANCE SIGNOFF
. f
?/- --Mbr1~; Cc=pEm lllki Date (TS HufLGarGNTRTlDN fWW NvWMcTR.-
.m G
e D-221-34 (30 SEPT 1998)