IR 05000266/1985013

From kanterella
Revision as of 10:03, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Discusses Safety Insp Repts 50-266/85-13 & 50-301/85-13 on 850722-26 & Forwards Notice of Violation.Violation Re Lack of Evaluation & Reportability of Auxiliary Feedwater Flow Transmitters Closed
ML20197H106
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/14/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20197H112 List:
References
NUDOCS 8605190062
Download: ML20197H106 (2)


Text

.-

.

MAY 141986 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

This refers to the special safety inspection (Inspection Report No /85013 and 50-301/85013) conducted by Mr. R. C. Wilson and other NRC representatives on July 22-26, 1985, of activities at the Point Beach Nuclear Plant, Units 1 and 2, authorized by NRC Licenses No. DPR-24 and No. DPR-27, and to the discussion of our findings with Mr. C. W. Fay and other members of his staff at the conclusion of the inspectio The purpose of the inspection was to review the implementation of your EQ program in accordance with requirements of 10 CFR 50.49. During this inspection, four of these activities appeared to be in violation of NRC requirements, and were specified in Appendix A of our November 1, 1985, Report Nos. 50-266/85013 and 50-301/85013 as Potential Enforcement / Unresolved items. The enclosed Notice of Violation addresses two of these issues (50-266/85013-02(DRS);

50-301/85013-02(DRS) and 50-266/85013-03(DRS); 50-301/85013-03(DRS)) as violations of 10 CFR 50.49. A written response is require One of the remaining two items (50-266/85013-01(DRS); 50-301/85013-01(DRS)),

concerning a lack of licensee evaluation and reportability of the auxiliary feedwater flow transmitters, has been addressed as part of item 50-266/85013-02(DRS); 50-301/85013-02(DRS), in the enclosed Notice of Violatio This item was tracked as Item 50-266/85013-01(DRS);50-301/85013-01(DRS)and has been close Item 50-266/85013-04(DRS);50-301/85013-04(DRS)concerninganapparent lack of evidence that Limitorque DC operators, MS 2019 and 2020 were type tested in the same configuration as installed in the plant, is considered an Unresolved Item pending further review of the tested configuratio In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC Public Document Roo . _ .

8605190062 86051426 PDR ADOCK O e i I[ N> f o/

.

.

Wisconsin Electric Power 2 MAY 14198S Company The responses directed by this letter and the accompanying Notice (Order)

are not subject to the clearance procedures of the Office of Management '

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51 We will gladly discuss any questions you have concerning this inspectio

Sincerely,

~'

Cri:inal SIPCd D' U U UWICO J. J. Harrison, Chief Engineering Branch Enclosure: Notice of Violation cc w/ enclosure:

J. J. Zach, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission

i N

RIII RIII RIII IE RI I RI(ITv'

' A9Q Gautam/jk Jy Sm(eegge JwA Muffett Potapovs Jack w QC Harri on 05/13/86 05/g/86 05/lA/86 05/ /86 05/p/86 05// '/86 i  !

- - _ - - . - - - . - - _ _ . .