APPENDIX A
Pacific Gas and Electric Company Docket Nos. 50-275 & 50-323
77 Beale Street, Room 1451 License Nos. DPR-80 & DPR-82
San Francisco, California 94106
As a result of the inspection conducted during the period of August 18 through
September 28, 1985, and in accordance with tne NRC Enforcement Policy (10 CFR
Part 2, Appendix C), the following violation was identified:
A. 10 CFR 50, Appendix B, Criterion V and Policy Section 5 of the PGandE
Quality Assurance Manual require that " Activities afffecting quality
shall be prescribed by documented instructions, procedures, or drawings,
of a type appropriate to the circumstances and shall be accomplished in
accord'.nce with these instructions, proedures, or drawings." To
implement this regulation, in part, PGandE Nuclear Plant Administrative
Procedure (NPAP) D-538, " Control of Material at DCPP" states, " Access
shall be limited at all times to those personnel on the current approved
access list. Others shall be admitted only on a signed-in escort basis
as required."
Contrary to the above, on September 11, 1985, an NRC inspector, not on
the approved access list, entered a Class I safety-related material
storage a rea (Warehouse B) through the southwest roll-up door, completely
unescorted and unchallenged. This is a repeat violation.
This is a Severity Level V Violation (Supplement I)
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company
is hereby required to submit to this office within thirty days of the date of
this Notice, a written statement of explaination in reply including: (1) the
corrective steps which have been taken and the results achieved; (2) the
corrective steps which will be taken to avoid further items of noncompliance;
and (3) the date when full compliance will be achieved. Consideration may be
given to extending your response time for good cause shown.
OCT 161985
Dated
)) [
'R." T. Dodd's, Chief
Reactor Projects Section 1