ML20086D910

From kanterella
Revision as of 15:14, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
AO 73-29:on 731002,drywell High Pressure Switch Failed to Actuate at Required Setpoint.Switch Reset,Functionally Tested & Declared Operable
ML20086D910
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/03/1973
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086D909 List:
References
AO-73-29, VYV-3039, NUDOCS 8312050656
Download: ML20086D910 (2)


Text