ML20055D229
| ML20055D229 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/22/1990 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-061, CON-NRC-90-61 VPNPD-90-304, NUDOCS 9007050197 | |
| Download: ML20055D229 (1) | |
Text
'
i s ,f r. .
. Wisconsin x Electnc
. POWER COMPANY 231 w MicNoort Po. Box 2046. Milwoukee. wi 53201 (414)221-2345-
. l 4
I .VPNPD-90' ' 30 4-l
' June 22, 1990 U.S. Nuclear Regulatory Commission Document Control Desk
- Mail Stop Pl-137 Washington,"DC 20555
,' l Gentlemen:
CHANGE IN PLANT MANAGER POINT BEACH NUCLEAR PLANT ,
1 This is:to inform you that we have promoted Mr. Gregory J. l Maxfield:to Manager of the Point Beach-Nuclear Plant effective ,
. July 1,:1990. Mr. Maxfield is highly qualified for the position. .
t
,Since starting as a Technical Assistant-Operations at the Point Beach ^ Nuclear Plant in 1979, he has held the positions of Nuclear Plant Engineer, Assistant Superintendent-Operations, Training Engineer, Superintendent-Operations, and Superintendent-Engineering Quality and Regulatory Services. Most recently he has H held:the position of General Superintendent-Operations, where he was responsible for the operating groups at Point Beach including k Health. Physics, Chemistry, Operations and Regulatory Services. He presently holds a Senior Reactor Operator's license on the Point u Beach units.
Mr. James J. Zach the present manager.has been promoted to Senior Manager of Nuclear Engineering in our corporate offices.
We~believe these appointments will enhance our operation and engineering support of the Point Beach Nuclear Plant.
Very.truly yours, 4
' kg ~
C. W.. Fay-Vice: President Nuclear Power
-TGM/ dad
..,, Copies to: NRC. Regional Administrator, Region III
'g NRC Resident-Inspector
.9007050197 900622 p[
dwbsWhn afIlinvmbilhew(brpw/km
.t,