Advises of Util Review & Approval of Cycle 11 Reload & Forwards Core Operating Limits Rept (COLR) for Upcoming Cycle Per Generic Ltr 86-16.Tech Spec Changes to Incorporate COLR Submitted
ML19325C897
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/11/1989
From: Silady J
COMMONWEALTH EDISON CO.
To: Murely T
Office of Nuclear Reactor Regulation
Shared Package
ML19325C898 List:
References
0318T:1, 318T:1, GL-88-16, NUDOCS 8910180056
Download: ML19325C897 (2)


Text

m;; -

'E #

g 1 ._.t. *

~ }<i Q 4 :

,

e y39 .. . _

p ic  ;./ N Commonweehh Edison .

y , gar g ;b l,- ' i _ d 72 West Adams Street Chicago, Illinois b,' jy' \ ' / Address Reply to: Pc.t Offica Box 767 ---

4, , A4 Chicago, Illinois 60690 0767 jy Qi ,' <

-.

c_ ,

t .-

p,g  : October 11, 1989:

y , 1

&

[ Dr; Thomas E..Murley. Director?

' Office of Nuclear Reactor Regulation 4

.

U.SL Nuclear Regulatory Commission -l

  • 4 '

Hashington, DC 20555 ,

,

,

^

Subject:

Quad Cities Nuclear Power Station Unitel l Cycle 11 Reload

'

,o JiRC Docket No. 50-254  ;

~

. . -

Reference:

J. A.;Silady to T.E. Murley, " Quad Cities Nuclear- .t Power Station Units 1:and 2, Proposed Amendment "

m - to Remove Cycle-Specific Core Limits from the-. .

- Technical Specification", dated July' 11,:1989/ ,

.

.n ,  ;

tv s A ,

-

.Dr. Murley:'

\r

=

g- ,

1 .

E[] - - -

-

-

' Quad Cities Station Unit 1,:which has completed its tenth cycle of u

~

.

L, operation,=is currently preparing for. Cycle-11 startup. The purpose of this 3

. .

. letter is twofold: .'(1) -to advise you of: Commonwealth, Edison's review and  ;

$< - approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2) . ,

C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming .

~ l

- cycle 7as required by Generic-Letter 88-16. Note that Edison has submitted the-

- necess'ary Technical Specification changes-(See Reference) to incorporate:the .

'

'

/ , - COLR. . Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment -

< prior to unit startup.

  • y s

, ..

- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel

.'

designs:and was designed to' operate under currently approved fuel design  !

q parameters, Technical Specifications and related bases such that: {

W '

' 1 )- . Core operating characteristics will be less limiting than those previously reviewed and accepted; or

,

,

ll-}

'

,,

'

2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.

Off 1 ,

' '

0318T:1 891018o056 891011 i PDR ADOCK 0500o254 p

.

m- PDC

5. k- - 3
  • ", [ .

,

.c. 3, i

b .

Dr. T.E. Nurley October 11, 1989

,

Commonwealth Edison has performed a detailed review of the relevant .

licensing documents, the bases, and references. Based on the review..a safety j evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to '

On-Site and Off-Site Review. As in the past, the. reload licensing documents j

.were prepared using previously approved methodologies as reported in the FSAR  ;

NEDE-24011 (GESTAR), and other generically approved documents. i l

.

.: Edison has reviewed the cycle-specific licensing results and concluded j that additional Technical-Specification changes are not required for Cycle 11- '

,

operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval. Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload. .)

1 \

'Therefore, application for an amendment to the Quad Cities Unit 1

'

1 operating license is not required for resumption of operation with the Cycle 11 reload core. The estimated startup is November 20, 1989. 1 l

L

'If-there are any further questions regarding this matter, please j i

contact this office. l I

Very truly yours, l

g -

J. A. S11ady Nuclear Licensing Administrator

  • im Attachment.

.cc: T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities

,

0318T:2