IR 05000528/2015004

From kanterella
Revision as of 23:33, 20 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000528/2015004, 05000529/2015004, and 05000530/2015004; 11/16/2015 - 11/20/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Triennial Heat Sink Performance Inspection
ML15273A470
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/30/2015
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Edington R
Arizona Public Service Co
C. Smith
References
IR 2015004
Download: ML15273A470 (7)


Text

September 30, 2015

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000528/2015004 and 05000529/2015004 and 05000530/2015004) AND REQUEST FOR INFORMATION

Dear Mr. Edington:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial heat sink performance inspection at the Palo Verde Nuclear Generating Station from November 16 - 20, 2015. The inspection will consist of two reactor inspectors from the NRCs Region IV office for one week. The inspection will be conducted in accordance with the NRCs Inspection Procedure 71111.07, Heat Sink Performance.

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents requested are to be provided by November 9, 2015. We request that during the onsite inspection week you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger program satisfies the NRCs regulatory requirements and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be available to support the inspectors at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Nawaporn AaronsCooke of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Chris Smith, by telephone at 817.200.1095 or by e-mail at chris.smith@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

R. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket No(s): 50-528, 50-529, 50-530 License No(s): NPF-41, NPF-51, NPF-74 Attachment:

Triennial Heat Sink Performance Inspection Request for Information Electronic Distribution for the Palo Verde Nuclear Generating Station

Request for Information Triennial Heat Sink Performance Inspection Palo Verde Nuclear Generating Station Inspection Report: 05000528/2015-004 05000529/2015-004 05000530/2015-004 Inspection Dates: November 16 - 20, 2015 Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance Inspector: Chris Smith, Reactor Inspector Jonathan Braisted, Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of Chris Smith, by November 9, 2015. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspectors, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Unit 2 train A diesel jacket water heat exchanger

1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat exchanger cavitation, or heat exchanger testing, in the previous three years 2. System health report(s) and maintenance rule system notebooks for all the Generic Letter 89-13 heat exchangers 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the previous three years 4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description-1- Attachment

5. Copies of any commitments to the Generic Letter 89-13 program For the specific heat exchangers selected:

Testing Documents 6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested 7. Instrument uncertainties of the instruments used during testing 8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers 9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable Cleaning Documents 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years 11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger 12. Cleaning procedures with acceptance criteria for the selected heat exchangers 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g.,

eddy current summary sheets, ultrasonic testing results, and visual inspection results 14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers Design Documents 15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers 16. Provide a list of calculations with a description which currently apply to each heat exchanger 17. Copies of vendor data sheets and design basis data for the selected heat exchangers 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria)

-2-

20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping 21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger For the ultimate heat sink or safety-related service water system:

23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)

24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)

25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life 28. Copies of inspections and/or maintenance related to preventing biotic fouling 29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section 30. Copy of the most recent service water flow balance test results, both as-found and as-left 31. History of any thru-wall pipe leaks on the safety-related service water system Inspector Contact Information:

Chris Smith, Reactor Inspector Mailing Address:

817-200-1095 U.S. NRC, Region IV chris.smith@nrc.gov 1600 East Lamar Blvd.

Arlington, TX 76011-4511 Attn: Chris Smith-3-

ML15273A470 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DRS/RI:EB1 RI/EB1 C:

NAME CSmith JBraisted TFarnholtz SIGNATURE /RA/ Email /RA/

DATE 9/30/15 9/30/15 9/30/15

Letter to Randall from Thomas R. Farnholtz, dated September 30, 2015 SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000528/2015004 and 05000529/2015004 and 05000530/2015004) AND REQUEST FOR INFORMATION