NRC-2013-0232, Comment (3) of Scott Williamson on Peach Bottom Atomic Power Station, Units 2 and 3: Proposed License Amendment to Increase the Maximum Reactor Power Level
| ML14009A143 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/22/2013 |
| From: | Williamson S State of PA, Dept of Environmental Protection |
| To: | Cindy Bladey Rules, Announcements, and Directives Branch |
| References | |
| 78FR63506 00003, NRC-2013-0232 | |
| Download: ML14009A143 (1) | |
Text
RULES AINU D!RECTIVES pennsyLvania DEPARTMENT OF ENVIRONMENTAL PROTECTION WATERWAYS AND WETLANDS PROGRAM LC 26 P11 2: 15 November 22, 2013 Cindy Bladey, Chief, Rules, Announcements, and Directives BranciZP(,B J\/)- F-Office of Administration - c;
[0 //. o 3*
Mail Stop: 3WFN,06-44M U.S. Nuclear Regulatory Commission 79 f * *(c,50(9 Washington, DC 20555-0001 Re: Peach Bottom Atomic Power Station Docket ID NRC-2013-0232'
Dear Ms. Bladey:
The Commonwealth of Pennsylvania, Department of Environmental Protection ("PADEP")
submits the following comment on the Peach Bottom Atomic Power Station Units 2 and 3:
Proposed License Amendment to Increase the Maximum Reactor Power Level. PADEP is the certifying agency underSecticy 401 of the Federal Water Pollution Control Act, 33 U.S.C.
Section 1341 ("Clean Water Act").
PADEP does not have specific detailed comments at this time because Exelon just recently submitted a water quality.certification request for this project. Under the Clean Water Act; water quality certification is required prior to the issuance of the license amendment. Pennsylvania has detailed regulations concerning water quality certification and it would be premature to comment on this project prior to having an opportunity to review the environmental assessment required by those regulations. See 25 Pa. Code Section 105.15(b).
PADEP has also had extensive discussions about the NPDES Permit required for this project with Exelon. Exelon has just concluded the field work for a four-year study to determine the thermal impact of the proposed extended power uprate, and is preparing a final report for PA DEP as part of the NPDES permit. Exelon has indicated that the application for the NPDES permit will be submitted in the next several months.
Thank you for* the. o,. ortunity
. .
to. comment
. . . . . .......
. ....
, . . - .. .
Since' ,re ; . . ..
Scott Williamson.
SCRO Program Manager SUNSI Review Complete Waterways and Wetlands Program SUNSI.Revie CoMplete Template = ADM - 013 MDP/SRW/lmt - . E-RIDS= ADM-03 Add= r)(e cc: Exelon Generation Co,.'LLQ /.; .
Southcentral Regional Office I 909 Elmerton Avenue I Harrisburg, PA 17110-8200 717.705.4802 I Fax 717.705.4760 "
Printed on Recycled Paper V36 www.depweb.state.pa.us