08/15/2006 - Summary of Public Meeting Re Results of the NRC Confirmatory Action Letter Followup Inspection of Inspection Procedure 95002 Issues Action Item Effectiveness
ML062330127
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/18/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
FirstEnergy Nuclear Operating Co
References
Download: ML062330127 (5)


Text

August 18, 2006LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITY:Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2006, PUBLIC EXIT MEETING TO DISCUSSTHE RESULTS OF THE NRC'S CONFIRMATORY ACTION LETTER (CAL)

FOLLOWUP INSPECTION OF INSPECTION PROCEDURE (IP) 95002 ISSUESACTION ITEM EFFECTIVENESSOn August 15, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at theQuail Hollow Resort in Painesville, Ohio. The meeting was betw een NRC Region III andFirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRC's CAL followup inspection in the IP 95002 Issues Action Item Effectiveness area. Themeeting notice, NRC presentation, and licensee presentation can be found in the AgencywideDocuments Access and Management System (ADAMS) as ML061870296, ML062300133, and ML062300124, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a review of Perry's performance since entering theMultiple/Repetitive Degraded Cornerstone column of the NRC's Action Matrix. This wasfollowed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the NRC's inspection of the effectiveness of the actionsimplemented by the licensee to address IP 95002 issues were then discussed. As part of this public exit meeting, FENOC responded to the NRC's assessment and discussed the progressof improvement efforts at Perry. At the end of the meeting, members of the public were giventhe opportunity to ask questions of NRC officials and FENOC representatives./RA/Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58

Enclosure:

As Stated See Attached Distribution LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITY:Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2006, PUBLIC EXIT MEETING TO DISCUSSTHE RESULTS OF THE NRC'S CONFIRMATORY ACTION LETTER (CAL)

FOLLOWUP INSPECTION OF INSPECTION PROCEDURE (IP) 95002 ISSUESACTION ITEM EFFECTIVENESSOn August 15, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at theQuail Hollow Resort in Painesville, Ohio. The meeting was betw een NRC Region III andFirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRC's CAL followup inspection in the IP 95002 Issues Action Item Effectiveness area. Themeeting notice, NRC presentation, and licensee presentation can be found in the AgencywideDocuments Access and Management System (ADAMS) as ML061870296, ML062300133, and ML062300124, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a review of Perry's performance since entering theMultiple/Repetitive Degraded Cornerstone column of the NRC's Action Matrix. This wasfollowed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the NRC's inspection of the effectiveness of the actionsimplemented by the licensee to address IP 95002 issues were then discussed. As part of this public exit meeting, FENOC responded to the NRC's assessment and discussed the progressof improvement efforts at Perry. At the end of the meeting, members of the public were giventhe opportunity to ask questions of NRC officials and FENOC representatives.Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58

Enclosure:

As Stated See Attached DistributionDOCUMENT NAME:E:\Filenet\ML062330127.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMERRuiz:dtpEDuncanDATE08/18/0608/18/06OFFICIAL RECORD COPY FirstEnergy Nuclear Operating Companycc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOCJ. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC L. Pearce, Vice President - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health L. Greene, Director, Lake County Emergency Management Agency FirstEnergy Nuclear Operating CompanyADAMS Distribution

DXC1 SJC4 RidsNrrDirsIrib

GEG KGO RJP DRPIII DRSIII PLB1 TXN EnclosurePrincipal Meeting Participants NRCS. West, Deputy Division Director, DRP, RIIIE. Duncan, Branch Chief, DRP, RIII M. Franke, Senior Resident Inspector, Perry S. Campbell, Project Manager, NRRFirstEnergy Nuclear Operating CompanyL. Pearce, Site Vice PresidentF. von Ahn, Director, Site Operations M. Wayland, Director, Maintenance G. Halnon, Director, Performance Improvement Initiative