ML063100618

From kanterella
Revision as of 09:16, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Acknowledgement of Receipt - Perry Response to Issues Identified in NRC Inspection Report 06-014
ML063100618
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/02/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-06-014
Download: ML063100618 (4)


Text

November 2, 2006Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO ISSUESIDENTIFIED IN NRC INSPECTION REPORT 05000440/2006014

Dear Mr. Pearce:

This acknowledges receipt of your letter dated October 26, 2006, which responded to theissues identified during the Perry Nuclear Power Plant Confirmatory Action Letter followup inspection of Inspection Procedure 95002 Issues Action Item Effectiveness, documented in NRC Inspection Report 05000440/2006014, dated September 20, 2006. We have reviewed your response and have no further questions at this time. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter willbe available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).Sincerely,/RA by Geoffrey C. Wright for/Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58DISTRIBUTION

See next page Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO ISSUESIDENTIFIED IN NRC INSPECTION REPORT 05000440/2006014

Dear Mr. Pearce:

This acknowledges receipt of your letter dated October 26, 2006, which responded to theissues identified during the Perry Nuclear Power Plant Confirmatory Action Letter followup inspection of Inspection Procedure 95002 Issues Action Item Effectiveness, documented in NRC inspection report 05000440/2006014, dated September 20, 2006. We have reviewed your response and have no further questions at this time. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter willbe available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).Sincerely,Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58DISTRIBUTION

See next pageDOCUMENT NAME:C:\FileNet\ML063100618.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIINRIIINAMERRuiz:dtpEDuncan*GCWforDATE11/02/0611/02/06OFFICIAL RECORD COPY L. Pearce cc:G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health L Pearce-3-DISTRIBUTION
DXC1 TEB SJC4 RidsNrrDirsIrib GEG KGO MEF1 DRPIII DRSIII PLB1 TXN