ML070530281
| ML070530281 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/22/2007 |
| From: | Shannon M Plant Support Branch Region IV |
| To: | Blevins M TXU Power |
| References | |
| IR-07-402 | |
| Download: ML070530281 (3) | |
See also: IR 05000446/2007002
Text
OFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONOFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONFebruary 22, 2007Mike Blevins, Senior Vice President and Chief Nuclear Officer
TXU Power
ATTN: Regulatory Affairs
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, TX 76043SUBJECT:COMANCHE PEAK STEAM ELECTRIC STATION - NRC SECURITY BASELINE TEAM INSPECTION REPORT 05000445/2007402 AND
05000446/2007402.Dear Mr. Blevins:
On January 25, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Comanche Peak Steam Electric Station Units 1 and 2. The
inspection covered one or more of the key attributes of the security cornerstone of the NRC's
Reactor Oversight Process. The enclosed inspection report documents the inspection results,
which were discussed on January 25, 2007, with Mr. R. Flores, Vice President Nuclear
Operations, and other members of your staff.This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.Based on the results of this inspection, no findings of significance were identified. However, alicensee-identified violation which was determined to be of very low safety significance is listed
in this report.NRC is treating this violation as a noncited violation (NCV) consistent with Section VI.A.1 of theNRC Enforcement Policy because of the very low security significance of the violation and
because it is entered into your corrective action program. If you contest this noncited violation,
you should provide a response within 30 days of the date of this inspection report, with the
basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk,
TXU Generation Company LP-2-OFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONOFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONWashington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director,Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001; and the NRC Resident Inspector at the Comanche Peak Steam Electric
Station.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be
available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
your response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response "Security Related Information - Withhold under 10 CFR 2.390" and follow
the instructions for withholding in 10 CFR 2.390(b)(1). Sincerely, /RA/Michael P. Shannon, ChiefPlant Support Branch
Division of Reactor SafetyDocket Nos.: 50-445, 50-446License Nos.: NPF-87, NPF-89Nonpublic Enclosure: Inspection Report 05000445/2007402 and 05000446/2007402 w/attachment: Supplemental Information
TXU Generation Company LP-3-OFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONOFFICIAL USE ONLY - SECURITY- RELATED INFORMATIONcc w/o enclosure;Fred W. Madden, Director
Regulatory Affairs
TXU Power
P.O. Box 1002
Glen Rose, TX 76043