Toa5 / wq 974 .pE: @ MEMORANDUM Vermont Yankee Design Engineering To D.Girroir
/ M. Duqan Date Julv 21,1998 From J.C. Fitzpatrick
/ S.D.Goodwin Group # VYM 98/132 Subject Summary of ASME Section XI Subsection IWE Torus Shell & Downcomer Inspections Performed Durinq the 1998 Refuelinq Outaae.
REFERENCES ASME XI, Subsection IWE, Requirements for Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Plants, 1992 Edition with 1992 Addenda. DE&S -Bolton Memo, C.B.Larsen to J.A.Schaefer(VY), subject: Proposed Strategy for Disposition of ASME XI, IWE Findings in Torus, PSD 41/98 Dated February 6,1998. Visual and UT Inspection Data Reports, performed on the Torus for IWE inspections ( Attachment A) VY Design Engineering Memo J.C.Fitzpatrick to D.Girroir/M.Dugan, subject: "External UT Locations on Torus Shell for ASME XI Subsection IWE Inspections", VYM 98/56 dated March 31,1998. YNSD Calculation for Vermont Yankee: VYC-1032:
Torus & Vent System Thickness Requirements, Revision 0, dated December 3,1991. ASME Section Ill Nuclear Vessels, 1965 (with Winter 1965 Addenda) and ASME Section VIII, Unfired Pressure Vessels, 1965. VY Event Report No.97-0307, "Torus Shell Corrosion
dated March 1997 Certified Stress Report, Vernon - 11, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,1968, by Chicago Bridge & Iron -Oak Brook Engineering. Draft Report for Evaluation of W ASME Section XI Subsection IWE 1998 Torus Inspections, dated July 22,1998. BACKGROUND IWE inspections were performed on the Torus bottom interior surface and the lower portions of the downcomers during the 1998 refueling outage. These areas are normally submerged and access was provided during the draining of the Torus for installation of new RHR and Core Spray strainers. The inspections were performed in parallel with sandblasting and re-coating the Torus bottom as part of the CS and RHR strainer replacement EDCR . thickness for the Torus bottom pW is CI eel plates used to construct the Torus sh with no significant margin over the design thickness.
To assure that the Torus shell remained within design specifications, wall thickness was verified as part of the re-coating effort.
D. G i r r io r/M . Dug an VYM 98/132 Page 2 of 3 The Design Engineering Mechanical Group was asked to provide assistance in developing a scheme for UT inspections on the Torus external shell to support the re-coating effort and to satisfy ASME Section XI, Subsection IWE requirements.
DISCUSSION Inspections Reference(b) outlined the proposed strategy for disposition of ASME Section XI, Subsection IWE, findings in the Torus. The general plan was to perform a initial visual inspection, assess the findings, and then formulate a detailed plan to address both the possible wall loss at locations of degraded coating and for long term monitoring of the Torus external shell and vent header corrosion. The inspection efforts performed were as follows: Visual inspections of the interior surface of the bottom half of the Torus were performed, see reference(c).
A limited number of specific locations were identified with surface corrosion and a significant number of previous coating repairs were identified and tabulated on a per bay basis. Three groups of UT data for the Torus bottom shell were taken based on the visual inspections.
The first group were full coverage test strips on the bottom of two bays. The purpose of the test strips was to assess variations in plate thickness and to assess the amount of wall loss attributed to the sandblasting efforts. The second group was a set of permanently marked discrete locations on the exterior of the Torus. These locations are intended for long term thickness measurements to monitor general corrosion of the bottom of the Torus shell. Given that the new coating will mitigate future corrosion, the 16 to 18 discrete locations in each bay will allow for long term UT monitoring for general corrosion of the Torus shell without draining the Torus.
The third group are external UT inspections at local areas of coating degradation identified in the "as- found" visual inspections and a sample of the areas accessible from only one side (under the Torus baffle plates). Evaluation of Data Reference(e) was developed to provide acceptable corrosion limits for the Torus and vent system. It is based on the analyses and modifications performed by Teledyne Engineering Services (TES) under the GE Mark I Program. The TES acceptance criteria were based on the maximum accident pressure of 44 Psi. Reference@)
did not consider the ASME code design pressure of 56. Psi. V.Y. ER 97-0307, reference (9) was written to reflect the fact that the TES calculation did not consider the ASME code design pressure. The ER also required that VYC-1032, Revision 0 be revised to reflect the 56. Psi. ASME code design pressure. The thickness data was assessed against original design code requirements and analyses in reference(h).
Th thickn- were found to be at code required thickness margin exists at the Torus bottom cent the process of being revised to retlect the 56. Psi. code design pressure.
is complete, it will provide acceptable corroded thickness for the Torus shell based on the ASME code design pressure.
VYC-1032 is in hen the revision D .Gi r r io r/M. Dug an VYM 9811 32 Page 3 of 3 CONCLUSIONS Reference(i) summarizes the inspection efforts and evaluation of the UT inspection data. It will be formalized upon completion of the revision to VYC-1032, reference(e). The following conclusions are considered preliminary until the revision to VYC-1032 is complete. There were no significant areas of general corrosion/metal loss identified during the 1998 refueling outage. Isolated small areas of surface corrosion and coating damage were observed, documented, and evaluated.
No significant wall loss was identified.
The entire bottom half of the interior surface of the Torus was sandblasted and re- coated during the 1998 refueling outage. Application of the new coating will mitigate future corrosion. Visual inspections performed during future refueling outages under ASME Section XI Subsection IWE requirements will insure the condition of the coating is monitored and repaired as required.
A permanent set of UT locations has been established on the exterior bottom of the Torus shell to provide a means for monitoring general area wall thickness without draining the Torus. code design pressure. When the revision is complete it will provide corroded thickness limits and acceptance criteria consistent with the original design code, reference(f).
Shqibr Engineer - MechanicaI/Structural Dept. Scott D.Goodwin Supervisor - Mechanical/Structural Dept. cc JHCallaghan 3 ATTACHMENT A to VYM 98/132 - Tab 1 - 2 3 - 4 11 - IS1 Report No. YA-VT-11-10 N/A NIA YA-UT-112-104 YA-UT-112-105 YA-UT-I 12-84 YA-UT-112-85' YA-UT-112-29 YA-UT-112-30 YA-UT-112-31 YA-UT-112-32
YA-UT-112-33 YA-UT-112-34 YA-UT-112-35 YA-UT-112-36
YA-UT-112-37 YA-UT-112-38 YA-UT-112-39 YA-UT-112-40 YA-UT-112-41 YA-UT-112-42 YA-UT-112-43 YA-UT-112-44 YA-UT-1 12-45 YA-UT-112-96 YA-UT-112-119 YA-UT-112-128 YA-UT-112-125 YA-UT-112-126 YA-UT-112-127 YA-UT-112- 129 Date 3/24/98 3/35/98 3/24/98 41419 8 4/4/98 411 0198 4/4/98 4/91/98 3/28/98 U I1 rr ri I1 'I II I1 3/27/98 Ii I1 I1 I6 I1 I1 11 II U " 11 II 3/28/98 II IC I1 I1 II ri 313019 8 411 3/98 Page 1 of 2 Contents As-found Visual Inspection of: a) Torus interior bottom (below water line). b) Downcomer bottom end, internal & external.
Location and Map of previous underwater coating repairs in bottom of Bay 8. Location and map of previous underwater coating repairs in bottom of Bay 16. Bay 8 Bottom - BEFORE - Sandblasting.
(2ft. wide full bay length test strip with 2" grids to monitor effects of coating removal on plate thickness.)
Bay 8 Bottom - AFTER - Sandblasting.
Bay 16 Bottom - BEFORE - Sandblasting.
(2ft. wide full bay length test strip with 2" grids to monitor effects of coating removal on plate thickness.)
Bay 16 Bottom - AFTER - Sandblasting. Torus Bottom Plate Long Term Monitoring Locations (1 6 to 18 per Bay) BEFORE SANDBLASTING Bay 1 Bay 2 Bay 3 Bay 4 Bay 5 Bay 6 Bay 7 Bay 8 Bay 9 Bay 10 Bay 11 Bay 12 Bay 13 Bay 14 Bay 15 Bay 16 Bays 2,4,7,14,&15 Confirmatory Readings Bays 2,4,7,10,14, &15 Supplemental Locations (Pts. 17 & 18) Torus Bottom Plate Long Term Monitoring Locations AFTER SANDBLASTING Bays 1 to 8 and 8 to 16 Bay 7 Bay 4: Torus Bottom Plate Thickness Under Baffle Plates.
Bay 15: Torus Bottom Plate Thickness Under Baffle Plates. Bay 7: Local indications at temporary opening. II U U It U iTTACHMENT A to VYM 98/132 Page 2 of 2 14 YA-UT-112-131 YA-UT-112-133
- "," I IS1 Report No. 1 Date 3/31/98 3/31/98 5/9/98 511 2/98 I I 13 1 YA-UT-112-27 I 3/29/98 15 YA-UT-112-26 3/29/98 YA-UT-I 12-46 3130198 16 17 18 19 20 21 YA-UT-112-25 3/29/98 YA-UT-112-46 3130198 YA-UT-112-67 4/5/98 YA-UT-112-68 4/4/98 YA-UT-112-48 313 1 19 8 YA-UT-112-24 3/29/98 YA-UT-112-46 3130198 YA-UT-112-47 3/30/98 411 198 411 198 23 I I YA-VT-11-25 4/27/98 YA-VT-11-27 4/26/98 YA-VT-I 1-28 4/26/98 YA-VT-I 1-48 5/6/98 YA-UT-112-123 4/30/98 Contents Bay 1 - Area 1 : As-found Local Area UT Examination Bay 2 - Area 1 : As-found Local Area UT Examination Bay 2 - Area 2: As-found Local Area UT Examination (6x6' square area) Pre-Sandblast (6x6 square area) Post-Sandblast (expanded 12"x12" area) Post-Sandblast.
Bay 5 -Area 1: As-found Local Area UT Examination.
Bay 5 - Area 1: Confirmatory Readings Bay 5 - Area 2: As-found Local Area UT Examination Bay 5 -Area 2: Confirmatory Readings Bay 5 - Area 1 (inside) : As-found Local Area UT Examination II I( I1 I1 11 I1 Bay 12 - Area 1 : As-found Local Area UT Examination.
Bay 12 - Area 2: As-found Local Area UT Examination.
Bay 12 - Area 2: Confirmatory Readings (26DL+) Bay 12 - Area 2: Confirmatory Readings (A-Scan) Bay 15 -Area 1: As-found Local Area UT Examination Bay 15 - Area 2: As-found Local Area UT Examination After sandblasting
/ prior to re-coating: Torus interior Visual inspections.
Torus Bottom Bays 1 to 6'10 to 16. Torus Bottom Bays 7,8, & 9 Downcomers in Bays 1 to 16. Bay 7 Plate from Torus temporary access. Local UT Examinations at locations identified as roller lap marks and/or raised ridges in Bays 4,11,12,15, & 16.
NUCLEAR SERVICES DIVISION PROCEDURE Eva lu3 tion Rcoui red: - PROCEDUX YA-UT-112 RZmSION 6 PAGE 6 of 6 N 9 ctqamt ID: WX fl Oafafila(s):
B2UX ru \UJ a I B C D E F C E I J H L hXHhDeLTAV6 Yi 00001 MOO2 6,573 0,570 0.512 0,571 0,573 0,572 0.572 0,571 0.572 0.571 8,573 0.571 0,570 0,570 0,568 0,571 0,571 0.572 0,570 0,568 0,570 01569 0.569 0,571 00574 0,570 0,004 0,572 0,572 0,568 0.004 0,570 00003 0,572 0,570 0,571 0,571 0,570 01572 0,570 0,571 0,570 0.569 01571 0,570 0,572 0,569 0,003 0.571 00004 0.569 0,569 01570 6,569 0,569 0,568 0.576 0,568 00002 0,569 00005 0.572 0,510 0,570 00569 0.571 0,571 00572 0,569 0,003 00570 00006 8,570 0,571 0,571 0,568 0,570 0,571 0.571 0.568 0,003 0.570 = 00008 0.572 0,571 0,571 0.571 0,572 6,573 0.573 0,571 0,002 0,572 3 00010 0.572 0.572 0,571 0,571 0,571 0.573 0.572 0.572 0.573 0,573 0.572 0.574 0,574 0,571 0,003 0.572 Y 00011 0.571 0,571 0,572 0,571 0,572 0.572 0.573 0.572 0,573 0,572 0.574 0,571 0,574 0,571 0,003 0,572 7- 00012 0,570 0.569 0,571 0,571 0,571 0.572 0.571 0,572 0,572 0,572 0.572 0.572 0,572 0,569 0,003 0.571 r\) ' & 00009 0.572 0,571 0,571 00007 0,570 0,572 0,570 0,570 0.569 0,572 0,572 0,569 0,003 0,570 0,571 0.5'12 0.573 0,573 0,571 0,002 00572 Fagelof2 0.573 0,572 0,572 0,511 0.573 0.573 0,573 0.572 0,573 0.573 0.574 0,574 lrin 0,569 0.569 0,569 0,5n 0.570 0,572 0,570 0.568 0,570 0,568 0,569 0,568 NT 0,004 0.003 0.004 0,000 0.003 00001 0,003 0,064 0.003 0.005 0,005 0,006 ave om 0.510 6.5n om 0,571 0.572 o,m 0.571 om 0.570 om 0.572 60000 200'0 :fw vw PROCEDURE RZVISION YA- UT - 11 2 6 PiiCLEAR SERVICES DrVlSION PROCEDURE PAGE 6 of 6 ,, T Evaluation ieauiree:
GJ ti0 A B C D. E F MU llh 0el-T AW 00002 0.567 0,568 0,568 0,568 0,568 0.567 0,568 0.567 0,061 0,568 Ob001 01569 0,568 0,569 0,569 0,569 0,568 0,569 0.568 0,001 0,569 W003 00004 0,569 0.568 01567 0,568 0.569 0.568 0.569 0,569 0,569 0,561 0,568 0.568 0,569 0,567 0,002 0.568 0.569 0,%7 0,002 0,568 00005 0.569 0,570 0,569 0,510 0,569 0,569 0,510 0,569 0,001 0,569 00006 0.569 0,569 0.570 0.569 0,569 0.510 0.570 0.569 Os001 0.569 lh 0,569 0.570 0,570 0.570 0,569 0.570 Rh 0.567 0.568 0.567 0.567 0,568 0,567 WJ 0.002 0,002 0.003 0,003 0.001 0,003 0.569 0,569 0,569 0,569 0.569 0.568 Fagelof2 a 5 E 's P s 0 ;9 H P s N a h.
IS $3 MATERIAL:
CAROba sW6L PRODUCT FORII: PcATC APPROX. THICK.: MAKE : yi+,dArG;n,cJ MODEL:ZLDL PLJS SERIAL NO. : r1313+ INSTRUMENT:
CRT 0 DIGITAL if HORIZONThL LINEARITY PERFORMED 0 CALIBRATION TIMEZ:
INITIAL: 03*b CHECK: kJ/a CHECK: /./n CHECK: /c//. FINAL: a./ta SKETCH WITH RESULTS: p4&&ftd -././ /6Lf$7 oomp. 7twP 7f' C&, AL/C T&MP 73' NO Evaluation Reauired:
i Ai 3" I < LEVEL= DATE DATE #/A- . DATE DATE DATE EXAM I NER EXAM AGENCY (Optional IS1 COORDINATOR (Op COGNIZA!lT ENGINEER QA (Optional 1 DATE ANII (Optimal 1 aqcimt ID: BlU Ptaffle(6):
B15A2 98l'WS lolv 0,601 0.600 0.601 0.600 0.601 0,603 Hh 0.581 0.584 0.585 0,590 0,598 0,543 Del-T 0.014 0.016 O.016 0.010 0,003 O.060 &e 0.596 0.5% 0,598 0.597 0,600 0,593 N w 0 N .-c 8 9 0 0 W 0 9 B NUCLEAR SERVICES DMSION PROCEDURE DATA SHEET NO. A\ 4 PLANT \Iy OUTAGE 20 DRAW i N G k-l /A REV. y/P SYSTEM 73 RclS CGb!PONENT/EELD NO. l3AY IS Af? FP 1 EN -4!h LOCATION ga LlI' YA-UT-112 6 6 of 6 PROCEDURE REVISION PAGE MATERIAL:
CAROhrr' s7FGL PRODUCT FORM: PLAT< APPROX. THICK.: ,S3b CRT 0 DIGITAL 6 HORIZONTAL LINEARITY PERFORI.IED 0 TRANSDUCER 5/,d 99303 WP I TC H c A T c H MAKE/MODEL:
4 ArJamCr12ic1 b791 - RPI MODE: 0 PULSEIECHO FREGUENCY:
xfifi/)rA2 SIZE: ,312" CALIBRATION TIMES. INITIAL: 03dn' CHECK: /-'/a CHECK: /J/n CHECK: /u/A FINAL: 042.3 Evaluation Required:
&p NO f L EXAMINER LEVEL fi- DATE EXAM AGENCY (Optional 1 ?/A DATE w64 ' IS1 COORDINATOR (Optio all DATE e DATE COGNIZANT ENGINEER OA (Optional 1 tJ /+ DATE ANI1 (Opticnal 1 DATE \I fl m )Qf$
A B C D E F G IbhDel,T4B 00001 0.599 0,603 0,603 0.601 0.602 0,600 0,600 0.603 0.599 0.004 0,601 00002 0.601 0.601 0.601 0,602 0,599 0,599 0,601 0,602 0,599 0,003 0,601 00003 0,602 0,602 0.601 0,602 0,600 0,599 0,599 0,602 0,599 0,003 0,601 00004 0,601 0,599 0.601 0,600 0.601 0,597 0.601 0,601 0,597 0,004 0,600 00005 0,603 0.602 0.602 0.602 0.601 0.599 0.598 0,603 0,598 0,005 0,601 00006 00007 00008 0,600 0.601 0,600 0,601 0.600 0,597 0,599 0.598 0,600 0,601 0,600 0,601 0,597 0,600 0,601 0,599 0,599 0,602 0.600 0.599 0,599 0,601 0,597 0,004 0,600 0,601 0,597 0,004 0,600 0,602 0,599 0,003 0,600 I$x Mh 0.603 0,603 0,603 0,602 0,602 0,600 0.601 0,598 0,599 0,599 0,600 0,599 0,597 0,598 DeLT 0,005 0,001 0,004 0,002 0,003 0,003 0,003 AW 0,601 0,601 0,601 0,601 0,601 0.598 0,600 N .u 0 N &! 8 9 0 8 0 0 0 u) 0 0 9 S u) 0
, - ,.%....-".*_a
'. .,... ._ ~-. .-.. ,._. . . . .. ._ . . . . ...
! Evaluation Required:
<'YES ,' NO . "-.- EXAMINER ~!h'!@~.~fld.~~
/ (& LEVEL ~L'JDATE 3/31 /?a oh- DATE ruh \ 0 1 @/A- DATE &/A . DATE DATE EXAM AGENC (Optional)
IS1 COORDINATOR (Opti COGNIZANT ENGINEER OA (Optional)
DATE ANII (Optional 1
A B C D B P G E llsw HhllelJAW 00001 0,610 0.608 0,608 0,609 0,609 0,607 0,606 0,610 0,610 0,606 0,004 0.608 00002 0,610 0,609 0,609 0.610 0,608 0,609 0.610 0,609 0,610 0,608 0,002 0,609 00003 0.610 0,610 0.612 0,611 0,611 0,612 0,612 0,612 0,615 0,610 0.M 0.612 hX 0,610 0,610 Oo6P Oo6U 0.615 006l.2 0,6U 0,612 Hh 0,610 0,608 0.608 0,609 0,608 0,607 0,606 0,609 bl-T OoO01) 0.002 0,004 0,002 0,007 0,005 0,006 0,003 0,610 0,609 Oe610 0,610 Odll 0,609 0,609 0,610 N ?3 N
I. I / M ,!A THICKNESS DATA SHEET DATA SHEET NO. PLANT vy OUTAGE z0 DRAW I NG SYSTEH mLdJ COM?ON ENT / W E LD NO. LOCAT I ON k!O 2\3' 4 REV. ~ gfiy 2 /4K*'ra z EN . yP0 MATERIAL:
ctuz~3at.1 STECC PRODUCT FORM: e~fi~~ APPROX. THICK.: Pf+rJ~,pGiItlU MODEL: 26 ,2f, PLUJ SERIAL NO.: 9313 y907 I N ST RUME NT : MAKE: CRT 0 DIGITAL fif HORIZONTAL LINEARITY PERFORMED 0 S/d u393 PI TCHICATCH MODE: 0 PULSE/ECHO FREQUENCY:
350 Wi- SIZE:& THICKNESSES:
2'.~ J', -" TRANSDUCER MAKE/MODEL:
fAdhfiflfl/C.l b79 f-Ksr? , CAL. MATERIAL:
BLOCK q3V0 q, 97-iL4t ;;;;ucTJT@d*'K INITIAL: La30 CHECK: d/fi CHECK: N/ .4 CHECK: e/& FI NAL: 21 '7 CALIBRATION TIMES: SKETCH WITH RESULTS: &I 1 1 3 Y 5 L T E v a 1 u a t i on Res u i red : .<& /- NO EXAM1 NER LEVEL DATE 3/3/lSP DATE 44- . ;;;; + EXAM AGENCY (Optional)
IS1 COORDINATOR (Op COGNIZANT ENGINEER QA (Optional 1 A.J P- DATE DATE ANII (Optional 1
A B C D E F WllhiDel,TAV~
00001 0.570 0.5'11 0.551 0,570 0,570 0.551 0,57l 0,570 0,0111 0,571 00003 0,564 0,568 0.568 0,570 0.571 0,570 0,571 0,568 0,003 0,569 00004 0.570 0.570 0,570 0,567 0,570 0,563 0,570 0,567 0,003 0,569 00005 0.571 0,573 0,572 0.571 0.573 0.569 0,573 0.569 0.004 0.512 00002 0,569 0,570 0,572 0,570 0.568 0.57l 0,572 OeS8 0,004 0,570 00006 0,572 0.572 0.572 0,570 0,570 0,570 0,572 0,570 0,002 0,571 aX 0,572 0,573 0,572 0,511 0,573 0,57l Ib bre 0,569 0,568 0,568 0,567 0,568 0,569 0.570 0,571 0,513 0,570 0,570 0.570 DeLT 0,003 0,005 0,061 0,061 0,005 0,002 OjaFall Average Value: 0,570 NUCLEAR SERVICES DMSION PROCEDURE PROCEDURE Y A-UT- 112 REVISION PAGE 6 6 of 6 PLANT vv OUTAGE a ORAWING dh REV. dh SYSTEM TGe\hs COMPONENT/WELD NO.
fh.4 2 .Awl EN dh LOCATION @-&_ 213' 701~5 &HoVh E~~,~~ THICKNESS OATA SHEET MATERIAL:
L5 PROOUCT FORM: QC&TG APPROX. THICK.: 0- b INSTRUMENT:
MAKE: MODEL: 26 bL @hS SERIAL NO.: '?3/3 qg07 CRT DIGITAL d' HORIZONTbL LINEARITY PERFORMED 0 TRANSDUCER d~ I TCHICATCH PI MAKE/MOOEL:
Plkksvn Gk& /D?9,-Rm/cbct3/f3 CAL. BLOCK PROOUCT MATERIAL:
cs 3d:73-66&
FORM: .%@ dJEbG.47 TH I C KN E SSES : O-250 'I- @@ CAL I B RAT I ON TI M ES : INITIAL: O'f:20 CHECK: MOOE: 0 PULSE/ECHO FREOUENCY:
5mk SIZE: o-frz CHECK: .'/A CHECK: .I/R FINAL: 06!15 ' DATA SHEET NO. Y~s - LJ r- ( J& - J A/-f G Evaluation Required:
NO LEVEL DATE ;z/L?/yf DATE @/A
- IS1 COORDINATOR (Op DATE 3.30.98 EXAM1 NER EXAM AGENCY (Optional 1 0 -r/q% COGNIZANT ENGINEER DATE OA (Optional)
Nla DATE ANI1 (Optional)
OAT E &A ompamt ID: B2Al Datafile(8):
BZAl A B C D B P llav Hhhl-TAva 00001 0,608 0.607 0,608 0,608 0,591 0,609 0,609 0,591 0,018 0,605 00002 0,605 0,604 0.606 0,600 0,609 0.607 0,609 0,600 0.009 0,605 00003 0,603 0.605 0,602 0,603 0.608 0.605 0.608 0.602 0.006 0.604 00004 0,603 0,605 0.605 0,608 O.6M 0.606 0,609 0,603 0,006 0.606 00005 0,606 O,6M 0,608 0,607 O.608 O.6O9 0.609 0.606 0.003 0.608 00006 0.605 0,602 0,605 0,606 0.605 0,607 0,607 0.602 0.005 0.605
&% 0.608 0.608 0.608 0,608 O.6M 0,609 h 0,603 0,602 0,602 0.600 0,591 0,605 Del-T 0.005 0,006 0.006 0.008 0.018 0.004 lhre 0.605 0,605 0,606 0.605 0,605 0,607 am: Lowest Value: 0.591 E E@& Value: 0.609 F Lowest Del-?: 0,004 P Highegt b1-E 0,018 E ROW: Iawt Value: 0,591 00001 aghest Value: 0,609 OW05 bwt Del-T: 0.003 00005 aawt mLf: om ooooi overall Averape Valae: 0,606 I I 1 NUCLEAR SERVICES DIVISION PROCEDURE MAT E RI AL : CS PRODUCT FORM: fLaTG APPROX. THICK. : 0- b ;QCkS INSTRUMENT
- MAKE : PpV\l)),MEtyT\
cs MODEL: 26 bL PLks SERIAL NO.: q31346'07 DIGITAL d HORIZONTAL LINEARITY PERFORMED CRT 0 &P I T c H c AT c H II TRANS MAKE / MOD DUC E E R L : fmA mdh 5.h vC-4 69 318 MODE: CI PULSE/ECHO FREOUENCY:
5Mh SIZE:* CAL. MATERIAL BLOCK : c 5 S;J:L/3-6&8?
- g;YCT SrnLJ*bC&
THICKNESSES:
o*zso"d I-cco CALIBRATION TIMES:
%- CHECK: % FINAL: ob: 15 INITIAL: 04:- CHECK: % CHECK: SKETCH WITH RESULTS: ~~~~co~g~g&
/62 5-57 &&& &': ?o% / 'I 3plQ~ pll- 013 0 PROCEDURE PAGE Y A - UT - 11 2 REVISION 6 6 of 6 Evaluation Required:
@ NO LEVEL 5 - DATE d&?/kf DATE rr, /h EXAM I NER EXAM AGENCY (Optional 1 IS1 COORDINATOR (Op COGNIZANT ENGINEER OA (Optional 1 4 DATE ANI1 (Optional 1 .30 -98 Pf/+ DATE fl/4 aDlqwxlcat ID: B5al Ihtaffle(s):
891 Pagelof2 A B C D E F G H I J K L I B 0 WhDel,TAve 00001 0,597 0,590 0,600 0,593 0,600 0,590 0,592 0,600 0,606 0,599 0,598 0.594 0,600 Os595 0.599 00002 0,598 0,596 0,597 0,587 0,591 0,595 0,590 0,589 0,599 0,594 0,593 0,596 0,594 0,597 0,592 00003 0,600 0.596 Os597 0,595 0,595 Os596 0.599 Os596 Os596 0,594 0.596 Os595 0,599 0,602 0,599 00004 0,601 0,601 0.598 0,587 0.593 0,585 0,597 0,597 Os598 0.598 0,599 0,598 0,591 0,597 0,597 00005 0,599 0,600 0.587 0,595 0,591 0,598 0,590 0,585 0,596 Os599 0,599 0,599 0,597 0,593 0,594 0,600 0,590 0,010 0,596 0,599 0,581 0,012 0,594 0,602 0,594 0,008 0,597 0.601 0,585 0,016 0,596 0,600 0,585 0,015 0,595 00006 0,594 0,598 0,597 0,583 0,58&.594 0.593 0,594 0,595 0.596 0,594 0,593 0,592 0.594 0,599 0,599 0.583 0,017 0,594 00007 00008 00009 00010 00011 00012 00013 0,600 0,601 0,600 0,597 0,598 0,599 0.597 0,598 0,595 Os595 0,597 0,597 0,599 Os600 0,594 0,600 0,599 0.598 Os601 0.595 0.5% 0,598 0,598 0.595 0,595 0,594 0,594 Os595 0,596 0.595 0,597 0,597 0,594 0,601 0.602 0.591 0.597 0.594 0.5% 0,602 0,596 0.597 0.595 0,598 0.599 0,594 0.597 0.594 0,598 0,600 0,593 0,596 0,596 0,598 0.598 0,597 0.593 Os597 Os599 0.597 0,597 0.599 0,600 0,601 Os599 0.5% 0,595 Os596 Os596 0.599 0,599 0,596 0.599 0,596 0,594 Os599 Os598 0.594 0.598 0.591 0,595 0.594 0,594 0,593 0,593 Os597 0,591 0,599 0,595 0,595 0,595 0,598 0,592 Os597 Os595 0.593 0.598 0,594 0,593 Os596 Os594 0,593 0,593 Os592 0,592 0.601 0,594 0,007 0,598 0,601 0,594 0,007 0,597 0,602 0,594 0,008 0,597 0,600 0,593 0,007 0,596 0,601 0,591 0,007 0,597 0,599 0,591 0,008 0.595 0,598 0,592 0,006 0,594 hX 0,601 0,601 0,600 0,601 0,602 0,599 0,599 0,600 0,600 Os602 0,599 0,599 0,600 Os602 0,599 #in 0,594 0,590 0,587 0,587 0,582 0.585 0,590 0,585 0,593 0,593 0,593 0,591 0,592 0,592 0,592 DeLT 0,001 OJll 0,013 0.014 0,020 0,014 0.009 0,015 0,007 0,009 0.006 OJO8 0,008 0,010 0,007 Ave 0,598 0.598 OS5% 0,595 0.595 0.594 0,595 0,595 0.5% 0.597 0,596 0,595 0,596 0,596 0.5%
am: Lowst Value: 0,582 E I i agheat Value: 0,602 19 lowest Del-T: 0.006 K Highest Del-!: 0,020 E m Lcwest Valm: 0,582 00006 Highest Value: 0.602 00009 Lowest Del-T: 0,006 00013 DeLT: 0,017 00006 Wall Average Value: 0,596 98ToADS 1 Yg 113 -2s DATA SHEET KC). THICKNESS DATA SHEET PLANT VY OUTAGE 2 ' DRAWING a REV. Iv/fl US COMPONENT/KELD NO. RAY A/fcA 1. EN /J/A SYSTEM NR LOCATION go 2 j3' Evaluation Required:
a NO LEVEL EXAMINER , ., /A EXAM AGENCY (Optional)
IS1 COORDINATOR (0 COGNIZANT ENGINEER OA (Optional)
ANI1 (Optional E.Jn 4 DATE DATE DATE DATE OAT E DATE A B C D E F G E I J K I II N 0 P Q R S T V V Y X Y HulIinDelTAw 00002 0,596 0.595 0,596 0.5% 0,596 0,597 0,596 0.595 0,596 0,597 0,592 0.586 0.595 0.595 0.596 0.5% 0.596 0.595 0,596 0.5% 0,595 0,596 0,596 0.595 0.5% 0,597 0.586 0.011 0.595 OOOO1 0,596 0.595 0.595 0.595 0,595 0.5% 0.596 0,595 0.5% 0.597 0.596 0.587 0,588 0,596 0.597 0,592 0,596 0,595 0.596 0.594 0,595 005% 0,595 0,596 0.5%
0,597 0.587 0,010 0,595 WOO3 005% 0.596 Os597 0,597 0,597 0,595 0,595 085% 0,596 0,595 0.586 0,596 0,597 0,597 0.597 0,598 0,598 005% 0,590 005% 0.598 0,597 0,596 0,598 0,597 00004 0,597 0,596 0,597 0,596 0.596 0.5% 085% 0,595 005% 0,598 0,586 00596 0.596 0,595 0,596 0,596 015% 0,594 005% 0,597 0,595 0,595 005% 00596 0,597 00598 0.586 ODOU 0,596 0,598 00586 0,012 0,596 WOO5 0.595 0.595 0,597 0,596 0.5% 0,598 0,596 0.596 0.595 0,595 0,595 0.594 0,597 0,594 0.5% 0,597 0,596 0.5% 0,595 0,595 0.5%
0,598 0,598 0,597 0.597 0,598 0,594 0,004 0.96 00006 0,597 0.596 0,596 0.5% 0.595 0.5% 0,596 0.595 0.551%5% 0.591 0.5% 0,595 0,596 0,596 0.5%
0.591 0,596 0,597 0,594 0.591 0.596 0.598 0,598 0.5% 0,598 0,551 0,047 0.594 00007 0.595 0.595 0,595 0,595 0,595 0.595 0.5% 0,595 0.595 0.5%
0,595 0,595 0.5% 0.595 0,595 0,5% 0.5% 0.5% 0.595 0.595 0,595 0,596 0.597 0,598 0,595 0,598 0,595 0,003 0,595 MOO8 005% 0,595 0,595 005% 0,5% 0.591 0,594 0.593 0,594 0,597 Oo5H 0.591 0,596 0,597 Os597 0.591 0,595 0.597 0,594 0,597 0,594 0,596 0,596 0,596 0.594 OOOO9 0,595 0,595 0,595 0,594 0,595 0,590 0.597 0.595 0,595 0,594 0,594 0,594 0,595 0,597 00598 0,596 0.598 0.597 0,595 0,595 0,598 085%
0,597 0,597 005% 00010 0.598 005% 0.594 005% 0.597 0.5% 0,596 0,596 0,597 0,597 0,597 00538 005% 0.5% 0,597 00598 0,597 0,596 005% 0,598 0.596 0,598 0,597 0.5% 0,596 00012 0,596 005% 0,597 005% 0,597 0,596 005% 0.5% 0,597 0,596 04% 0.596 0,597 005% 0,598 04% 085% 0,598 0,594 0,597 0,596 0,596 005% 0,591 0.536 8,597 0.593 OM 0,595 00598 0,590 0,008 0.596 0,598 0.594 0,004 0,597 OOdll 0.595 0,596 0,595 0,595 0,596 0.597 0,597 0,596 0,598 0,598 0,594 0,594 0.594 0,595 0,597 0,597 0,597 0.5% 0,597 0.597 0.5% 0,595 0.5% 0,595 0,596 0.88 0,594 0.004 0,546 0,598 0,594 00004 0,596 00013 0,596 0,597 0.5% 0,597 0.598 0,596 0.596 0,584 0,593 0,586 0,597 0.597 0,597 0,596 0,597 005% 0.597 0.597 0.595 0.595 0.596 0.596 0.596 0.597 0.596 0,597 0,597 Om595 0,595 0,596 0,596 0,596 0,597 0,596 0,595 0,597 0,595 0,595 0,597 0,596 0,594 0,598 0,595 0,597 0,597 0,596 0,597 0,598 0,598 0,597 0.598 0,599 0,598 01598 0,599 0,597 0,597 0,598 0,599 0,597 0,598 0,598 0,596 0,594 0,596 0,596 085%
0,595 01595 0,593 0,597 0,596 0,596 0,596 0,589 0,596 085% 0,596 0,596 0,596 0,597 0,596 0,597 0,595 0,596 00597 0,598 0,597 0,597 0,596 0,596 0,596 0,596 0,597 0.596 0,598 0.598 0,597 0,597 0,597 0,598 0,597 0,598 0,595 0,598 0,536 0,598 0,596 0,595 0,594 0.595 0,596 0,597 0,597 0,596 0,596 0,596 0,598 0,597 0,597 0,596 0,596 0,597 0,597 0,596 0,598 0,597 0,597 0,597 0,597 0,597 0,597 0,598 0,596 0,598 0,584 0,014 0.595 0,599 0,594 0,005 0,597 0,598 0,589 OeOO9 0,596 0,598 0,595 0,003 0,597 0,598 0,594 0.004 0,597 00014 00015 00016 00017 00018 0,596 0,596 0,596 0,596 0,595 0,595 0,595 0,595 0,595 0,593 0,596 0,597 0,597 0,598 0,596 0,596 0,597 0,597 0,597 0,597 0,596 0,598 0,595 0,597 0,598 0,598 0,593 0,005 0,596 00020 0,595 0,595 0.595 0,596 0,595 0.5% 0,596 0,596 0.597 0,597 0.596 0,595 0,595 0,596 0.597 0,596 0,597 0,596 0,596 0.5% 0.597 0.595 0,596 0,596 0.595 0.597 0,595 0,002 0,596 60019 0,595 0,597 0.595 0,595 0,596 0,598 0,596 0,594 0,593 0,598 0,595 0,595 0,595 0,596 0,598 0,597 0,597 0,596 0,596 0,597 0,597 0,596 0.597 0,597 0,597 0,598 0,593 0.005 0.596 00021 0,596 0.596 0,595 0,595 0,597 0,596 0.595 0.596 0,597 0,598 0.595 0,596 0,595 0,596 0,597 0,597 0,596 0,596 0.595 00597 0,596 0,595 085% 0,596 0,596 00022 0,596 0,595 0.595 0,596 0,595 0,595 0,596 0,590 0,596 0,596 0,593 0,595 0,595 0,597 0,594 0.597 0,597 0,595 0,595 0,595 0,596 0,595 0,596 0,596 0,595 0,598 0,595 0,003 0.596 0,597 0.590 0,007 0,595 00023 0,596 0.580 0,595 0,597 0,595 0,597 0,596 0,598 0,596 0,596 0,596 0,596 0,596 0,596 0,596 0,595 0,596 0,596 0.595 0.595 0,595 0,536 0,595 0,596 0,597 0,598 0,580 0.018 0,595 00024 0,596 0,597 0,596 0,596 01594 0,594 0,595 0.5% 0.595 0,596 0,595 0,595 0,596 0,586 0,595 0,594 0,596 0,596 0,595 0,595 0,596 0,596 0,596 0,596 0,596 60025 085% 0.597 0,594 0,593 0,596 0,597 0,593 0,595 0,596 0,597 0,596 015% 0,596 0,595 0.597 0,592 0,596 0,596 0,596 0.5% 0,596 0,595 0,596 0,595 0.5% 0,597 0,586 01011 0,595 0,597 0,592 0,005 0,596 00026 0,595 0,597 0,596 0.596 0.5% 0,595 0.596 0.597 0.596 0.596 0.595 0.596 0.597 0.597 0.594 0.597 0,596 0.597 0.598 0.596 0.597 0.597 0.597 0.596 0.595 0,546 0,597 0,596 0,596 0,595 0,596 0,597 0,597 0,594 0,597 0,596 0,597 0,598 0.5% 0,597 0,597 0,597 015% 0,595 0,598 0.594 0,004 0.596 hX 0,598 0,598 0,598 0,597 0,598 0.598 0.597 0,598 0,598 01598 0,597 0,598 01598 0,598 0,598 0,598 01598 0.599 01598 0,598 0.599 01598 0,598 0,598 015%
Kin 0,594 0,580 0,594 0,593 0,594 0,590 0,593 0,581 0,551 0,586 0,586 0,586 0,588 0,586 0,591 0,589 0,595 0,594 0,590 0,594 0,594 0.595 0,595 0,591 0,594 bLT 0,004 0,018 0,004 0.004 0.004 0,008 0,004 0,014 0,017 0,012 0,011 0,012 0,010 0,012 0,004 0,009 0,003 0,005 0,008 0,004 0,005 0.003 0,003 0,004 0,005 Ave 0,596 0,595 0,596 0.5% 0,596 0,596 0.5% 0,595 0.594 0.596 0,591 0,595 0,596 0,596 0,5% 0,596 0,597 0,596 0,596 0.5% 0,596 0.5% 0,596 0,596 0.5%
2 Ha lh t8l-T Am 00001 0.5% 0,596 0,596 0.000 0,596 00002 0,596 0,596 0.596 0,000 0,596 00003 0.5% 0,596 0.596 0,000 Ov.596 00004 0.5% 0,596 0,596 0.000 0,596 00005 0.5% 0,596 0,596 0,000 0.596 00006 0.597 0,597 0.597 0.000 0,597 00007 0.595 0.595 0.595 0,000 0.595 00008 095% 0,596 0.596 0,000 0.596 00009 0,596 0,596 0,596 0,000 0,596 00010 0,596 0,596 0.596 0.000 0,596 00011 0.5% 0,596 0,596 0,000 0.596 00012 0.595 0.595 0,595 0.000 0.595 00013 0.597 0,597 0.597 0,000 0,597 00014 0,598 0,596 0,598 0.000 0.598 00015 0.5% 0.596 0.596 0,000 0,596 00016 0,595 0.595 0.595 0,000 0,595 00017 0,596 0.596 0.596 0.000 0.596 00018 0.596 0.596 0.596 0.000 0.596 00019 0.595 0,595 0,595 0.000 0.595 00020 0,596 0.596 0.596 0,000 0.596 00021 0,595 0.595 0,595 0,000 0.595 00022 0,596 0.596 0,596 0,000 0.596 00023 0,596 0.596 0,596 0,000 0,596 00024 0,595 0.595 0.595 0,000 0.595 00025 005% 0.596 0.96 0,000 0.596 00026 0.597 0.597 0.597 0.000 0.597 #ax 0.596 0,595 hl-T 0.003 Avs 0.5% Page20f 3' CIP.NI-4 .-.I 0 0 0 a a c PROCEDURE Y A - UT - 1 12 NUCLEAR SERVICES DIVISION REVISION 6 PAGE 6 of 6 PROCEDURE DATA SHEET NO. PLANT UY OUTAGE 2 ' DRAWING N/A REV. ILI/A SYSTEW TDLdJ COMPGNENT/WELD NO. BAY 1 7, Am\ EN &/A LOCAT I ON Rd 2.13' ww APPROX. THICK.: ,580 MATERIAL:
CRl6Gd S'rEGC PRODUCT FORM:
FLAyE INSTRUMENT:
MODEL: 26 DL fL"3 SERIAL NO.: 573 I3 iJ&7 I CRT 0 DIGITAL n' HORIZONTAL LINEARITY PERFORKED 0 MA~E: ,FAIJAM~T@ICJ THICKNESSES: 1'; .a', . PRODUCT MATERIAL:
4d43-dLS I FORM: $70'3 ~'066 CAL. BLOCKq3LIo INITIAL: 0 It0 CHECK: L'J,' CHECK: $1 j 11 CHECK: FINAL: 0 2Ta @ CA~IBRATION TIMES: SKETCH WITH RESULTS: -I L " .L T I I 88" Evaluation Required:
NO EXAM1 NER LEVEL E DATE EXAM AGENCY (Optional)
DATE @/A ' 3.3 1 -7 6 IS1 COORDINATOR c DATE 4A DATE COGNIZANT ENGINEER OA (Optional 1 ANI1 (Optional) 4A DATE I"#+
oompcnant ID: Blu3 Datafile(s):
BW 11 PAga1M2L I A B C D E F G li I5 WHfnM-lfBVe 00001 2,531 0.590 0,593 0,593 3,531 0.593 0,592 0.593 0,592 0.593 0,593 0,590 0,003 0,592 00002 0,592 0,591 0.592 0,591 3,592 0,592 0.594 0,591 0.592 0.590 0,594 0,590 0,004 0,592 00003 0,593 0,592 0.590 0,591 0.590 0.594 0.593 3,591 0,593 0.591 0,594 0,590 0,004 0,592 00004 0.592 0.591 0.593 0.592 0,592 0,592 0,591 0,590 0,590 0,591 0,593 0.590 0,003 0,591 00005 3,592 0,593 0.593 0,592 3,591 0,594 0,592 0,591 0.593 0.593 0,594 0,591 0,003 0,592 00006 0,593 3,591 3,541 0,591 0,595 0,592 3,591 0,591 0,592 0,591 0,595 0,591 0,004 0,592 llay 0,593 0,593 0,593 0,593 0,595 0,594 0,591 0,593 0,593 0,593 Win 0,591 0,590 0,590 0,591 0,590 0.592 0,591 0,590 0,590 0,590 Bl-T 0,002 0,003 0,003 0,002 0,005 0,002 0.003 0,003 0,003 0,003 AV8 0,592 0,591 0,592 0,592 0,592 0,593 0,592 0,591 0,592 0,591 N 8 N 8 4 0 s3 86 54 ss 00 00 1 Yw I I 2- 2 $+ OATA SHEET NC). THICKNESS OATA SHEET v\/ OUTAGE 2 ' DRAWiNG /uln REV.
- EN PLANT SYSTEM me UJ COMPCNENT/!+'ELD NO. by It Acts'A Evaluation Required:
.(y';;) NO EXAM AGENCY (Optional)
IS1 COORDINATOR (0 COGNIZANT ENGINEER OA (Optional) rJh Qia 1- ' ANII (Optional)
OAT E DATE DATE OAT E DATE DATE A E C 0 B F G H I J'K*I,+I I 0 P Q R 8 T V V 1 X Y WHhDel-TAve 00001 0,615 0,615 0.616 0,613 0.611 0,609 0.609 0,608 0,601 0,571 0,581 0,569 0,587 0,588 0.587 0.589 0.589 0.587 0.588 0,589 0,590 0,589 3,590 0,588 0,590 0,616 0,569 0.047 0,595 00002 0,615 0,614 0,613 0.6U 0,612 0.610 0,611 0,608 0,597 0,580 0.582 0,574 0.588 0,587 0,586 0.589 0.589 0,589 0,588 0,588 0,588 0,589 0.589 0,588 0,589 0,615 0,574 0.041 0,595 00003 0.617 0,614 0,613 0.614 0,610 0.609 0.609 0.608 0,601 0,581 0,581 0.586 0,587 0,585 0,586 0.589 0,589 0,589 0,589 0,588 0.589 0,589 0,589 0.588 0,588 0,617 0,581 0,036 0.596 00004 0.617 0.614 0.608 0,611 0,611 0.612 0.607 0.609 0,600 0,583 0,582 0.584 0,587 0.586 0,585 0.584 0.587 0,588 0,589 0.588 0,567 0,589 0,588 0,590 0,589 0.617 0.582 0.035 0.595 00006 0.617 0.615 0,611 0,610 0.612 0,610 0,607 0.605 0,603 0,582 0,585 0,586 0,588 0,588 0.588 0,587 0,590 0,588 0.587 0,588 0,589 0.589 3.591 0,589 0,588 0,617 0,582 0.035 0,596 OOaO8 0.617 0,614 O.6l6 0.614 0.612 0.611 0.610 0,610 0.604 0,583 0.587 0.585 0.588 0,588 0,589 0.589 0,588 0,588 0.588 0,588 0.589 0,590 0,591 0,590 0,589 0.617 0,583 0.034 0.597 MOO9 0.616 0.613 0,613 0,612 0,611 O.6ll 0.610 0.609 0.601 0,592 0.582 0,581 0.586 0,588 0.588 0.588 0,587 0,586 0.586 0.588 0,589 0,588 0,588 0.587 0,589 0,616 01582 0,034 0.596 00010 0.616 0,613 0,614 0.612 0.612 0.605 0.605 0,602 0.602 0,587 0.579 0.588 0,587 0,586 0.586 0,588 0,587 0.589 0,588 0.588 0,588 0,586 0,588 0,588 0,587 0,616 0,579 0.037 0,595 00011 0.613 0.613 0.613 0.612 0,611 3,603 9,590 0,597 0,594 0,588 0,582 0,588 0,588 0,587 0,587 0,590 0,588 0,589 0,590 0.590 0.590 0,588 0,590 0.589 0,589 0,613 0,582 0,031 0.594 00012 0.616 0.613 0.612 0.612 0,611 0.609 0,610 0.603 0,599 0,586 0.585 0,587 0.588 0,587 0,589 0,590 0,590 3.590 0,589 0.588 3,590 0,589 0,588 0,593 3.590 0.616 0,585 0.031 0.596 MOO5 0,619 0.614 0,596 0,597 0,609 0.598 0,603 0,593 0.606 0.585 0,582 0.586 0,587 0,588 0,586 0,587 0.588 0,587 0.588 0.588 0.589 0,588 0,589 0,588 0,589 00007 0,617 0,618 0.617 0,612 0.613 0,611 0.612 0,610 0,600 0,580 0.582 0,587 0,588 0,588 0,589 0,588 0,587 OoW 0,586 00587 0,587 0,588 00589 0,590 0,590 0,619 0,582 0,037 0,593 0,618 0,580 0,038 0,596
)$x 0.619 0.618 0.617 0.614 0.613 0,611 0.612 0,610 0.606 0,592 0.587 0,588 0,588 0,588 0,589 0,590 0.590 0,540 0.590 0.590 0,590 0.590 0,591 0.590 0,590
&I 0,613 0,613 0.5% 0,597 0,609 0.51 0,590 0,593 0.594 0.571 0,579 0,569 0,586 0,585 0,585 0.584 0.587 0,585 0,586 0,587 0,587 0,586 0,588 0,581 0.587 Del,! 0.006 0,005 0,OW 0,017 0.004 0,016 0.022 0,017 0,OU 0,021 O0OMI 0.019 0.002 0,003 0.004 0,006 0.003 0,004 0,004 0.003 0.003 0.001 0,003 6,003 0.003 AVe 0,616 0.614 0.633 Os611 0,611 0,608 0.607 0,605 0,601 0,583 0.582 0,581 0,587 0.587 00587 0,588 0,588 0,588 0,588 0.588 0,589 0.588 00589 00589 0.589 Fag8lOf 2' N ru 0 N
---.- . Torus Rollout - Bay I2 Bottom Half - Shell Exterior Equator Weld Seam RPV Side f 0 I OATA SHEET NO. YA-o('- (la 8 DRAWING a REV. % EN .A PLANT v\/ OUTAGE 2 SYSTEM mg 65 CGZPPCNENT/WELD NO. I2 AREA 1
- LOCATION Ra A'3' Evaluation Required:
(;;;3 NO LEVEl & OATE 3/r'/Fd DATE 44 . EXAMINER EXAM AGENCY (Optional 1 DATE 3-30 -98 IS1 COORDINATOR DATE si'sl ?b' * /4 COGNIZANT ENGINEER OA (Optional)
ANI1 (Optional)
OfA OATE 9J& OATE &/A I A E C D E &t%Hia<Ave 00001 0.507 0,605 0,608 0,607 0.610 0,610 0.605 01005 0,607 MOO2 0.605 0,605 0,605 0,607 0,604 0,607 0.604 0.003 0,605 00003 0,604 0,605 0,656 3,506 0.605 0.606 Os604 00002 0.605 00004 9,636 0,635 0,603 0.605 0,604 0,606 0,603 0.003 0,605 00005 0,605 0,604 0,605 0.605 0.605 0,605 0,604 0,001 0,605 00006 0,602 ci,636 0.605 0,604 0.605 0,606 0,602 0,004 0,604 !QX 0.607 0,606 0,608 0.607 0.610 Hh 0.602 0.604 0,603 0,604 0.604 Del-? 0.005 00002 0,005 0,003 0,006 AVS 0.605 0,605 0,605 0,606 0,606 N w 0 N NUCLEAR SERVICES DMSION PROCEDURE
.--* MATERIAL:
C~RBG~ STEEL PRODUCT FORM: P LATE APPROX. THICK.: 0 INSTRUMENT:
MAKE: hli4MFtiXIC-S MOOEL: Ab bL ? LL\ q- SERIAL NO.: q?\? 07 CRT 0 DIGITAL d HORIZONT4L LINEARITY PERFORMEO 0 s I z E : JJ. ' - l.oll &T CH / c ATC H SJN 643\5 TRANSDUCER MAKE/MODEL:
PAMR M FTRIC s 079 \-kOI MODE: 0 PULSE/ECHO FREOUENCY:
2.0 &.\LA? CAL. BLOCK MATER I AL : CALIBRATIQN TIMES:
PRODUCT -6 9 FORM: WEDGE TH!CKNESSES:
0.2s' I INITIAL: \oh8 CHECK: \\\7 CHECK: \\3& CHECK: d/A FINAL: \a 0s YA- UT- 11 2 6 6 of 6 PROCEDURE REVISION PAGE NUCLEAR SERVICES DIVISION PROCEDURE OA (Optional 1 4 DATE +a ANI1 (Opticnal) 44 DATE -/& YA- UT - 112 6 6 of 6 PROCEDURE REVISION PAGE
.. $), b0Q MATERIAL:
el5 PRODUCT FORY: YLArF APPROX. THICK.: INSTRUMENT:
?ah, I
- drzl c 5 MAKE : MODEL: 26 bL PLkc CRT 0 DIGITAL HORIZONT4L LINEARITY PERFORKED 0 SERIAL NO.: f?3/3 4fG 7 F A NO Evaluation Reauired:
LEVEL - EXAMINER EXAM AGENCY (Optional) 151 COORDINATOR (Opti COGNIZANT ENGINEER OA (Optional 1 @/p ANII (Optional)
@It+ DATE DATE DATE DATE DATE DATE I A B C D B F Hax Xh Cel-T AB 00016 00017 0,586 3,534 0,589 0,633 0.633 0.636 0,593 0.591 0,594 0.632 0.634 0,634 0,636 0,586 0,050 0,612 0,634 0,591 0,043 0,613 00018 0,592 0,592 0,584 0.630 0,635 0,611 0,644 0,584 0,060 0,613 00020 0,591 0.591 0,590 0.636 0,635 0,612 0,642 0,590 0,052 0,614 00022 0.598 0,590 0,583 0,623 0,637 0,640 0,640 0,583 0,057 0,612 00024 0,592 0,593 0,589 0,636 0.610 0,641 0,641 0,589 0,052 0,615 00026 0,588 0,587 0,584 0,626 0.640 0.641 0,641 0,584 0,057 0,611 00027 0,585 0,586 0,583 0,620 0,636 0,611 0,641 0,583 0,058 0,608 00028 0,583 0,587 0,586 0.634 0,638 0,644 0,641 0,583 0,061 0,612 00029 0,595 0,592 0.591 0,635 0,636 0.643 0,643 0,591 0,052 0,615 00030 0,592 0.591 0,590 0.633 0,641 0,643 0,643 0,590 0,053 0,615 00019 9,590 0,591 0,589 0,631 0.636 0,640 0,640 0,589 0,051 0,613 4- b-sa 00021 0,591 0,590 0.588 0,637 0,638 0.640 0,640 0,588 0,052 0,611 00023 0,589 0,589 0,586 0,623 0,633 6,642 0,642 0,586 0,056 0,610 00025 0,588 0,587 0.587 0.634 0,636 0,642 0,642 0,587 0,055 0,612 lbx 0,598 0,594 0,594 0,637 0,611 0.644 DeLT 0,015 0,008 0,011 0,017 0,008 0,010 Win Ave 0,583 0,586 0,583 0,620 0,633 0.634 0,590 0,590 0,588 0,631 0,637 0.641
Torus Rollout - Bay 5 Bottom Half - Shell Interior Equator Weld Seam RPV Side I r I I NUCLEAR SERVICES DIVISION PROCEDURE
- -* PROCEDURE YA-UT-112 REmSION 6 PAGE 6 of 6 I DATA SHEET NO.YA~U%II>C~~-
PLANT VY OUTAGE DRAWING A)A. REV. & SYSTEM ro RUJ COF!PONENT/UELO NO. &A)' 6- A Pe3 1 h5Id EN dl'k LOCATION R8 L(3' .c MATERIAL:
e.&& 603 STC3G-L PRODUCT FOR41: PLltig APPROX. THICK.: MAKE: Prwmi 674 MOOEL: 2L DL pLdJ SERIAL NO.: G3'2Li367 INSTRUMENT:
CRT 0 DIGITAL d HORIZONTqL LINEARITY PERFORMEO 0 THICKNESSES:
nL' . .",. 1 FINAL': 0-10~~ CALI BRATI ON LIMES: INITIAL: OS I J' CHECK: CHECK:
/J.t CHECK: &/3 '@A\/ $7,- FIS Evaluation Required:
0 NO LEVEL DATE dLhf EXAM AGENCY (Optional)
DATE @//4 P 0 IS1 COORDINATOR (0 COGNIZANT ENGINEER DATE OA (Optional 1 DATE ANI1 (Optional)
@/& DATE wl+
A B C D E F lIax HhiblJll~e 00001 0,593 0,599 0.603 3,516 0,618 0,617 0.618 0,599 0.019 0,609 00002 0,600 0,600 0,599 0,016 3,615 0,621 0.621 0.599 0.022 0.609 00003 0.602 0,599 0,603 0,619 0,620 0,622 0,622 0,599 0,023 0.611 00004 0,602 0.605 0,596 3.620 0,619 0.623 0.623 0.596 0.027 0,610 00005 0,601 0,602 0.605 0,622 0.628 0.626 0.628 0.601 0,027 0.614 00006 0,600 0,600 0,599 0.626 0.625 0.628 0,628 0,599 0,029 0.613 00008 0,604 0.599 0,602 0.626 0.630 0.632 0,632 0,599 0.033 0,615 00007 0,602 0.600 0,603 0.627 0.627 0.629 00629 0,600 0,029 0,615 00009 00010 0,605 0,601 0,603 0,630 0,631 0,631 0,654 0.600 0,597 0.629 0,630 0,633 0,631 0,601 0,030 0,617 00633 0,597 0,036 0,615 00011 0,602 0,599 0,590 0.632 0.630 0.634 0.634 0.598 0,036 0.616 00012 00013 00014 00015 0,599 0,598 0,599 0.628 0,628 0,635 08597 0,595 0,599 0,632 00635 0.635 0,597 0,598 0.597 0.630 0.634 0,636 0,593 5,596 0,598 0,624 0.634 0.634 0,635 0,598 0,037 0,615 00635 0,595 0,040 0,615 0,636 0.597 0,039 0.615 0.634 0,593 0.041 00613 MX 0,605 0.602 00605 0,632 00635 0,636 h 0.593 0.595 0,596 0,616 0.615 0.617 Del-T 00012 0.007 0,009 0,016 00020 0,019 Ave 0,600 0.599 0,600 0.625 0,627 0.629 98SE Page 1 of 2t.
coLI))p(:
M8st Value: 0,593 A Hfgbst Value: 0,636 F Lovest W-T: 0,007 B fighat Del-T: 0,020 E mk Inwest Value: 0,593 00015 Highat Value: 0,636 00014 Uwt Dal-T: 0,019 00001 h?T: 0,041 00015 Ovaall Average Value: 0,613 I > I I NUCLEAR SERVICES DMSION PROCEDURE
- -. -0 PROCEDURE Y A - UT - 11 2 REVISION 6 PAGE 6 of 6 THICKNESS DATA SHEET DATA SHEET NO. Yd-uT- f / > /oy "J/ 4 PLANT 4 20 DRAWING PJ/A REV. SYSTEM 7 us LOCATION 8C7TTOW 'iTQ4U5 J EXAnihlED 466 TNRU .f, 11s. COk!?ONENT/VELD NO.
DA g EN MATERIAL:
c( PRODUCT FORM: k/fl f7qGHT APPROX. THICK.: 0. 6" MODEL: 26 DLt SERIAL NO.: INSTRUMENT:pw9 r?ETR,=~ MAKE : CRT 0 DIGITAL^
HORIZONTAL LINEARITY PERFORMED 0 CAL. BLOCK MATERIAL:
cs CALIBRATION TIMES: INITIAL: 0900 CHECK: 10 15 CHECK: NIB CHECK: W(A FINAL: 11 2 0 DUTSlDE OF TORUS A Evaluation Required:
6 NO E 4-4-7a DATE d /& ~ EXAMINER LEVEL - DATE EXAM AGENCY (Optional) - IS1 COORDINATOR (0 COGNIZANT ENGINEER OA (Optional)
N/A DATE - DATE q. 7 @ DATE -$$%I ANI1 (Optional)
E..'/rt DATE 444 1 NUCLEAR SERVICES DMSXON PROCEDURE THICKNESS DATA SHEET DATA SHEET N9. \f4r-ur-( I - /p< PROCEDURE YA-UT-112 REVISION PAGE 6 6 of 6 MATERIAL:
& PRODUCT FOR4v&lhJ6HT APPROX. THICK. : .bo " MAKE : PdAmF"rR\C5 MODEL: 26 DL + SERIAL NO. : 93 I793b7 INSTRUMENT.
CRT 0 DIGITALB HORIZONTBL LINEARITY PERFORMED 0 TRANSDUCER 5N
- 64315 pel PITCHICATCH I1 MAKE/MODEL:
PtMdAmmI CS/DmI RM MODE: o PULSEIECHO FREOUENCY
- 51-0rcrr SIZE: ,312 PRODUCT FORM: 4- STEP If THICKNESSES:
250 '%7at' INITIAL: CHECK: 1665 CHECK: CHECK: MA FIN;(: /OSO CALIBRATIO VlEU- blJrLlbE LboKln(t up. 2 " Sc;lJ @ ."J ~\#?dl~ 5. Evaluation Reauired:
@ NO EXAM I N E R LEVEL DATE 4-4-9& \ EXAM AGENCY (Optional) ( fip- DATE /of& . IS1 COORDINATOR (Op / OATE .IC--?% OA (Optional 1 ?/h- DATE #qh- 0 COGNIZANT ENGINEER DATE DATE e/& ANI1 (Optional 1
Bay 8 Bottom Prior to Blasting Bay 8 Bottom Prior to Blasting Page 2 Bay 8 Bottom Prior to Blasting Page 3 4 I NUCLEAR SERVICES DMSION PROCEDURE PROCEDURE REVISION 6 PAGE Y A - UT - 1 12 6 of 6 , 6 'I MATE2 I AL: cs PGOOUCT FOW: Pc'b7E APP2OX. THICK.: I N S T R U P! E N T : SERIAL NO. : 73/34607 HAKE : 7 Ad Am 6 in t C> MOOEL: zb DL PLUS CRT 0 OIGITAL CiP HORIZONTAL LINEARITY PERFO?fEO 0 Evaluation Reauited:
@ NO LEVEL - fG. DATE OATE . if-!&M8 EXAM AGENCY (Optional) d OATE IS1 COOROINATOR (Opti OATE C OGN I Z ANT EN G I N E E R 44 DATE OA (Optional)
ANI1 (Optional) fqa DATE '7 Q/A I BAY 8 AFTER BLASTING B8BOT- A B C D E F G H I J K L - 1 NA NA NA NA NA NA 0.577 0.585 0.603 0.604 0.586 0.588 3 0.573 0.586 0.597 0.596 0.594 0.592 0.803 0.599 0.605 0.607 0.606 0.608 4 0.595 0.600 0.597 0.599 0.597 0.585 0.603 0.602 0.605 0.606 0.608 0.606 5 0.600 0.599 0.600 0.600 0.578 0.574 0.604 0.603 0.607 0.606 0.606 0.606 6 0.600 0.601 0.600 0.601 0.588 0.585 0.599 0.597 0.607 0.606 0.607 0.607 7 0.600 0.601 0.600 0.602 0.599 0.594 0.597 0.598 0.606 0.604 0.604 0.605 8 0.600 0.600 0.600 0,604 0.597 0.594 0.601 0.597 0.604 0.606 0.607 0.606- 9 0.603 0.602 0.603 0.603 0.000 0.597 0,599 0.600 0.607 0.6081 0.596 0.606 IO 0.602 0.602 0.602 0,602 0.599 0.597 0.591 0.601 0.607 0.6071 0.605 0.606 11 0.602 0.601 0.603 0.602 0.601 0.599 0.599 0.600 0.605 0.605 0.604 0.605 12 0.602 0.599 0.603 0.603 0.601 0.596 0.596 0.600 0.603 0.606 0.605 0.605 13 0.599 0.591 0.594 0.603 0.584 0.588 0.593 0.589 0.604 0.605 0.605 0.605 14 0.597 0.5G- 0.591 0.603 0.601 0.602 0.602 0.602 0.601 0.603 0.604 0.605 IS 0.603 0.603 0.601 0.602 0.600 0.598 0.599 0.602 0.605 0.604 0.603 0.603 16 0.607 0.606 0.602 0.583 0.598 0.602 0.603 0.606 0.601 0.606 0.606 0.604 17 0.609 0.602 0.596 0.581 0.579 0.598 0.593 0.592 0.586 0.591 0.600 0.601 18 0.606 0.605 0.598 0.591 0.600 0.602 0.588 0.597 0.571 0.593 0.603 0.603 I9 0.607 0.6M 0.605 0.600 0.605 0.602 0.590 0.589 0.595 0.601 0.602 0.602 20 0.606 0.605 0.603 0.603 0.588 0.584 0.588 0.594 0.596 0.600 0.601 0.599 21 0.607 0.605 0.607 0,604 0.601 0.594 OS87 0.597 0.599 0.600 0.601 0.601 22 0.607 0.606 0.605 0.604 0.599 0.595 0.596 0.596 0.598 0.598 0.597 0.600 23 0.606 0.606 0.606 0.606 0.598 0.594 0.594 0.597 0.598 0.599 0.598 0.589 241 0.607 0.608 0.605 0.606 0.599 0.598 0.595 0.597 0.596 0.597 0.596 0.587 25 0.608 0.608 0.608 0.604 0.595 0.589 0.594 0.596 0.597 0.596 0.595 0.594 26 0.610 0.610 0.605 0.603 0.595 0.584 0.588 0.582 0.591 0.592 0.590 0.591 27 0.607 0.607 0.605 0.605 0,605 0.601 0.580 0.580 0.574 0.574 OS80 0.586 28 0.607 0.607 0.606 0.606 0.606 0.601 0.580 0.587 0.592 0.589 0.592 0.594 29 0.607~ 0.607 0.608- 0.607 0.603 0.603 0.594 0.595 0.596 0.594 0.595 0.597 30 0.607 0.606 0.606 0.607 0.590 0.597 0.584 0.592 0.597 0.598 0.597 0.595 31 0.605 0.606 0.605 0.605 0.599 0.594 0.596 0.598 0.599 0.598 0.598 0.599 32 0.609 0.607 0.606 0.606 0.598 0.599 0.598 0.602 0.602 0.603 0.601 0.599 0.604 0.587 0.595 0.602 0.602 0.602 0.603 33 0.607 0.608 0.609 0.008 0.601 - 34 0.606 0.607 0.607 0.605 0.584 0.591 0.598- 0.599 0.606 0.605 0.605 35 0.608 0.607 0.606 0.604 0.607 0.590 0,589 0.593 0.607 0.604 0.605 0.606 36 0.606 0.606 0.604 0.604 0.602 0.588 0.605 0.595 0.605 0.605 0.606 0.607- 2 0.586 0.588 0.594 0.594 0.582 0.583 0.593 0.590 0.606 E606 0.601 0.603 _--____________-
BBBOTAFT Page I BAY 8 AFTER BLASTING Page 2 S8S'O L8S'O P8S.0 S8S'O S8S'O S8S'O 98S'O 68S'O E8S.0 18Si'0 08S'O 8LSO 1090 1090 86S'O *09'0 909'0 909'0 801 L8S'O WS'O S8E'O 985'0 L8S'O 99S.O WS'O 98S'O WS'O 88S.O 88S'O 889'0 86S'O *090 *090 SO90 LO1 885.0 S8S'O 999.0 L8S'O 08SO S6S'O 00S'O 0090 *08'0 W90 *09'0 901 W'O 98S'O WS'O 6LS.0 SLS'O 18S'O 18S'O ZO90 Po90 *090 EO9'0 so1 WS'O E8S'O 28S'O SLSO 69S'O ZLS'O WS'O 209'0 9090 W9'0 909'0 WC WS'O E8S'O 98S.O S8S.0 SSS'O 98S'O Z090 *09.0 909'0 SO90 *09'0 *01 E8S.0 08S'O WS'O ,.9LS'O 8LS'O 8LS.0 2090 08S'O *090 S09'0 09'0 201 WS'O S8S'O WS'O 98S'O 2LS'O *6SO S6SO 06S'O PO90 G09'0 909'0 001 WSO WS'O 18S'O 88S.O 08S'O 66S'O 86S'O V6S'O *090 W90 S09'0 66 18S'O 08S'O 28S'O E9S.0 M.0 E09'0 209'0 *090 W90 P09'0 LO90 86 WO Z8S'O 28S'O LSS'O 6SS'O 06S'O US'O WS'O W90 SO90 LO90 L6 + E8E.O WS'O Z8S'O 08S'O ELS'O S6S'O 2090 W90 984'0 2090 PO90 ' to1 ~~~ 08S'O I S9S'O 18S'O Z8S'O 6QS'O W'O pO9'0 WS'O WO SO90 SO90 909'0 96 8LS.O '18S'O 6LS'O 08S'O 18S'O LLS'O 1090 *090 *09'0 w90 W90 so90 56 QLS'O 18S'O E89'0 PLS'O 6LS'O BLS'O 98S'O ZWO 909'0 PO90 -0 9090 96 6LS'O 6LS'O OLS'O SLS'O LLS'O 8LS'O 9LS'O 109'0 LO90 LO90 L09'0 8090 *6 LS'O SLS'O ~E9E.O LLS'O 8GG'O 8S5'0 06S'O 9090~ --9090 6090 9090 8090 26 WS'O 6SE'O 8WO PLS'O LQS'O Z9S'O E6S'O 2090 9090 8090 S09'0 909'0 16 WS'O 86S'O 989'0 L8S'O L8S'O 69S'O 18SO *090 SO90 W90 LO90 6090 06 1090 66S'O 009'0 209'0 109'0 2B'O S8S'O *090 1090 SO90 PO90 LO90 68 08s-0 009'0 OW0 1090 ZWO E6S.O 26S'O *090 *09'0 SO90 LO90 SO9'0 88 L6S.0 C090 ~2090 *09'0 *090 0090 S6S'O 68S'O SWO 9090 w9'0 9090 L8 Po90 *09.0 PO90 909'0 L6S'O L8S'O S8S.O 68S'O Po90 PO90 Po90 W90 98 so90 w90 9090 9090 0090 PLS'O 16S'O OK0 SO90 PO90 L09'0 SO9'0 E8 '8090 OL90 LOQO 809'0 809'0 865.0 188'0 86S'O 8090 9090 WQO 909'0 0190 6090 6090 1190 0090 06S'O S8S'O~ 96S'O WO 9090 LO90 L09'0 *8 2190 0190 1190 8090 LO90 88c;'O 18S'O 66S'O 9090 909'0 LO90 LO90 28 2190 *190 *19'0 1190 609'0 609'0 SLS'O 68S'O SO90 9090 SO90 -0 18 2190 z190 0190 1190 9090 109'0 WS'O m.0 *090 so90 6090 Po90 OS P190 2190 SWO 0190 SO9.0 809'0 009.0 109'0 PO90 W90 909'0 909'0 6L PC9'0 2190 2190 El90 P190 1190 S6S'O Z090 1090 *090 *090 SO90 8L L190 Ll90 9190 LC90 9190 6WO 6690 66S'O 209'0 W90 PO90 SO9'0 LL 6C90 8190 619'0 LS.9'0 809'0 6090 209'0 W9'0 2090 Z090 E090 Z09'0 9L LC9'0 8190 L6S'O S09.0 909'0 SCQ'O 664'0 Z6S'O L6S'O 0090 W9'0 SO90 SL L190 8190 8190 *09'0 *190 *190 L6S'O 66S'O 18S'O Z6S'O 209'0 Z090 PL OZ9'0 - 129'0 6L9'0 619'0 919'0 *19'0 66S'O L6S'O 86S'O 86S'O 1000 109'0 BL 1 M r I H 9 d 3, a 3 8 v -1oa8a BAY 8 AFTER BLASTING B8BOTAfT Page 4 BAY 8 BO77OM PRIOR TO BLASTlNG Page 2 BAY 8 BOTTOM PRloR TO BLAS77NG Page 3 BAY 8 BOTTOM PRIOR TO BLASTING 1 1 // BAY 8 1 0 0 2 3 4 5 6 7 0.604 8 A IB C ID !E IF IG H /I /J IK 1 ___.- - __ 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 39 40 41 42 43 44 45 46 47 48 49 - q4b .- :la 38 Page 1 I
~ PROCEDURE YA-UT-112 REVISION 6 6 of 6 NUCLEAR SERVICES DIVISION PROCEDURE PAGE MATERIAL:
c/s PRODUCT FORY:~J~?~UGMI-AFPROX. THICK.: 0,Gc" MAKE : A MFT- R 1cS MODEL: A& bl.+ ' SERIAL NO.: 9 313 qR 07 INSTRUMENT:
CRT 0 DIGITAL .5( HORIZONThL LINEARITY PERFORMED 0 a PITCH/CATCH
%'lQ 6931 \ TRANSDUCER MAKE/MODEL:A MODE: 0 PULSE/ECHO FRE0UENCY:S.O MIQSIZE: *;?\a CAL. BLOCK PRODUCT CALIERATI N TIMES MATERIAL:
c /c T H ! C K N E S S E S : A2- 5 'I , so ': I 7s 'I INITIAL: ~AY 0: CHECK: 10 26 CHECK: i J. IO CHECK: \ 3 40 FINAL': 3 EKMOrY\FTG s/is - 1 G;' 0 - oQF FORM: STEPLdF DGE i 9.56 0 SKETCH WITH RESULTS: &t35~W~Tiot,15 D\JQ To %A'f CAdFlWAmidd.
OAJ I b 4b ---------
Evaluation Reouired:
@ NO LEVEL DATE 4 . '1 Lq8 DATE +Qln DATE -+ 4\ $6 COGN I ZAXT EN G I N E ER DATE OA (Optional 1 DATE '../A ANI1 (Optional 1 OAT E 4P BAYl6BOT BAY 16- A B C D E F G H I 'J K L 0.602 2 0.595 0.593 0.59 0.595 0.596 0.599 0.601 0.604 0.596 0.589 0.603 0.61 3 0.599 0.601 0.601 0.602 0.578 0.598 0.597 0.603 0.604 0.594 0.605 0.613 4 0.601 0.601 0.604 0.591 0.595 0.596 0.609 0.612 0.611 0.606 0.607 0.612 1 5 0.601 0.602 0.603 0.589 0.581 0.592 0.606 0.61 0.609 0.607 0.611 0.61 3 6 0.602 0.603 0.594 0.595 0.595 0.6 0.615 0.605 0.612 0.611 0.614 0.611 7 0.603 0.604 0.605 0.5971 0.605 0.604 0.603 0.603 0.615 0.609 0.612 0.612 8 0.604 0.607 0.592 0.606 0.603 0.599 0.611 0.612 0.601 0.609 0.612 0.614 9 0.607 0.607 0.607 0.608 0.603 0.602 0.606' 0.622 0.605 0.605 0.614 0.611 10 0.606 0.607 0.593 0.603 0.608 0.6 0.614 0.597 0.607 0.609 0.612
-_-_ 0.612 11 0.61 0.601 0.604 0.61 0.605 0.613 0.609 0.605 0.615 0.614 0.615 0.61 12 0.607 0.611 0.61 0.61 1 0.609 0.597 0.608 0.618 0.615 0.608 0.609 0.614 13 0.611 0.61 0.609 0.611 0.612 0.606 0.605 0.612 0.612 0.607 0.613 0.614 14 0.611 - 0.61 0.607 0.606 0.612 0.605 0.601 0.62 0.612 0.615 0.615 0.613 15 0.61 0.612 0.614 0.6 0.613 0.614 0.61 0.608 0.611 0.612 0.611 0.61 16 0.611 0.61 2 0.61 0.61 1 0.615 0.615 0.612 0.613 0.612 0.613 0.613 0.611 17 0.612 0.614 0.609 0.607 0.613 0.614 0.612 0.611 0.614 0.606 0.608 0.612 18 0.615 0.612 0.614 0.613 0.613 0.607 0.611 0.616 0.617 0.612 0.611 0.612 19 0.614 0.615 0.614 0.617 0.614 0.615 0.609 0.61 0.617 0.61 0.61 1 0.61 20 0.613 0.614 0.613 0.614 0.61 0.603 0.606 0.606 0.608 0.616 0.615 0.61 21 0.613 0.614 0.614 0.613 0.613 0.611 0.592 0.606 0.609 0.609 0.608 0.60.1 22 0.612 0.614 0.612 0.617 0.613 0.604 0.602 0.61 0.606 0.609 0.606 0.606 23 0.615 0.616 0.613 0.614 0.616 0.632 0.598 0.634 0.607 0.61 0.608 0.608 24 0.611 0.616 0.614 0.613 0.614 0.609 0.599 0.605 0.605 0.606 0.604 0.61 8 25 0.612 0.613 0.613 0.613 0.612 0.605 0.605 0.601 0.604 0.605 0.606 0.605 26 0.613 0.611 0.614 0.614 0.617 0.601 0,628 0.602 0.603 0.605 0.603 0.608 27 0.615 0.612 0.614 0.615 0.605 0.604 0.597 0.596 0.601 0.598 0.606 0.586 28 0.614 0.615 0.615 0.618 0.613 0.606 0,605 0.598 0.599 0.599 0.589 0.621 29 0.59 0.614 0.617 0.614 0.602 0.606 0,604 0.595 0.6 0.598 0.597 0.592 30 0.613 0.614 0.614 0.63 0.603 0.602 0,591 0.59 0.6 0.599 0.597 0.599 31 0.614 0.616 0.614 0.614 0.606 0.613 0.605 0.601 0.602 0.6 0.599 0.599 32 0.611 0.613 0.615 0.611 0.615 0.615 0.606 0.602 0.602 0.601 0.6 0.599 33 0.614 0.613 0.613 0.615 0.617 0.808 0.604 0.608 ~~~ 0.604 0.603 0.602 0.617 34 0.614 0.611 0.6130.6140.809-
-7.602 0.605 0.607 0.607 0.609 0.607 35 0.614 0.613 0.616 0.61 0.61 0.61 0.598 0.61 0.609 0.605 0.609 0.607 36 0.613 0.613 0.617 0.617 0.614 0.614 0.612 0.611 0.61 1 0.61 1 0.61 0.61 1 1 0 0 0 0 0 0 0.634 0.598 0.605 0.608 0.604 __ - ~ ---- ---- c Page 1 BAY 16BOT Page 2
BAY1 6BOT BAY 16- 109 110 111 112 113 114 115 116 117 118 A B C D E F G H I J K L 0.6 0.599 0.601 0.603 0.604 0.601 0.588 0.588 0.587 0.588 0.589 0,586 0.599 0.599 0.6 0.589 0.605 0.602 0.571 0.589 0.589 0.587 0.586 0.589 0.598 0.6 0.599 0.596 0.593 0.587 0.570 0.58 0.587 0.587 0.588 0,586 0.599 0.598 0.599 0.6 0.606 0.596 0.577 0.579 0.587 0.588 0.584 0.588 0.598 0.598 0.598 0.594 0.597 0.606 0.589 0.585 0.587 0.588 0.587 0,587 0.596 0.597 0.597 0.612 0.603 0.602 0.591 0.588 0.586 0.581 0.587 OS&- 0.591 0.589 0.597 0.598 0.6 0.598 0.583 0.587 0.588' 0.591 0.588 -_ 0.592 0.573 0.595 0.588 0.59 0.583 0.598 0.583 0.589 0.589 0.587 - 0.587 0.59 0 0 0.592 0.588 0.59 0.59 0.578 0.581 0.596 0.592 0.591 0.59 0 0 0 0 0 0 0 0.599 0.589 0.5851 0.584 0.591 i Page 4 t I DMS1oN rnvb,cIu uRE -0 NODE L : 2-b DL+ SERIAL NO,: INSTRUMENT:
YAK* : PROCEDURE REVISION 6 PAGE 6 of 6 YA - UT- 11 2 CRT 0 DIGITAL @ HORIZCNT~L LINEARITY PERiORMiD 0 ,312" loq3" ,h PITCH/CATCH IKQE: 0 PULSE/ECEO FREOUENCY:
310 SIZE: T RAN SCUC E R HAKE/MOOEL:
TORUS BAY 76 AFTER BLAS77NG Page 1 92 93 94 95 96 97 98 99 Page 2 0.601 0.601 0.6021 0.606' 0.608 0.5971 0.577 0.584 0.578 0.577' 0.578 0.575 0.601 0.603 0.606' 0.599 0.605 0.608' 0.576 0.577 0.58 0.58 0.581 0.581 0.597 0.598 0.602 0.601 0.603 0.606 0.573 0.573 0.577 0.577 0.578 0.579 0.598 0.597 0.6 0.603 0.597 0.588 0.569 0.573 0.579 0.577 0.579 0.581 0.6 0.63 0.5941 0.61 0.601 0.584' 0.582 0.578 0.577 0.579 0.581 0.577 0.61 0.599 0.599 0.6011 0.601 0.597 0.593 0.575 0.574 0.5741 0.5821 0.583 0.61 0.592 0.577 0.579 0.582 0.5781 0.5791 0.578 0.5941 0.594 0.585 0.61 0.5951 0.594 0.595, 0.5991 0.588/ 0.588, 0.5781 0.579, 0.579; 0.5771 0.581 0.582 c TORUS BAY f6 AFTER BfdS77NG Page 3 I &Biuilr VERIFIED DOW CORNING 795 SEALANT CONTAINMENT DRYWELL *LEV* 238' (RffEj EMBECO 885 GROUT SHELL T THIS CHANGE FOR . MI? 00410 ONLY b 1 ND I CATES CHANGE wrs 7/tda3 - I 5920-1 2789 VERMONT YANKEE NUCLEAR POWER STAYION APPROVED BY JOB NO. FOR: VERNON, VERMONT Vermont Yankee DataSheetNo:
g'?k-O/ - *!o Work Order No.: 00-5037 Visual Examination Report Form VT-1, Containment Surfaces (IWE) Procedure NoMev.: A%? 88 95 /? *-&z 1 ~~ - Component
- fl/ Illumination Level Check I Level: Lz Date: Level: &/A Date: "'/IS Date: d%/O/ Reviewer:
Ntf Date: 49 AMI: Date:Cd- d/ Evaluation Required?
yes $NO VWF ao4s.02 NE 8045 Rev. 1 Page 1 of 1 Thickness Calibration Data Sheet -y;XurL EY;& ce(nE4&y s-c Comeonent
+& 5lrO 1 .t Component ID: Drvdf I/ k, I Arm Material:
LL? System: D rv I~tl I/ Drawing Nurnber,di:
62 02 41 R& /O Plant Lo&~oR: hl. Dr 23K Nominal Thickness:
1.000 Product Form: wreuc. I - Instrument Instrument Make: ?k~a q elrid Instrument Model:
2 6 DL PlU5 Instrument SM: 93 2 93 a7 Instrument Display: CRT ( ) Digital (d Horizontaf Linearity Performed?:
Yes ( ) No (\b Calibration Block Serial Number: Ek / -1 , ek 1-51 Calibration Block Material:
BlodcTemperature:
75" OF Thicknesses:
,860 e 7.001 M&TE Used? Yes ( ) No {d M&TE Descn'ption ISIN: &%A c/c Product Form: Wm 9.f . Calibration Times Check /ki/A Check // Initial Calibration:
Os0 0 Check: 1 3 0 9 Check: d/A Sketch and Examination Results: Examiner:
Reviewer:
Date: $sIo*O Form Number: 3&8d P&bm Level: Z= Date: S/8/% 1 Yes (y . No ( ) WNEFB053.01 Page I of 1 NE 8053 Original.
LPC#I .
- . , .
Workorder Number: 00-0050;37-000 Thickness Calibration Data Sheet Component
- 'WE. E- cmopy e-c &I& 5.@.*] CornponentlD:
D~Y WELL SEAL A~FA System: 0 Ezy WELL Drawing NumberRev.:
6 2 02 - 2 EV 0 Plant Location:
DRY LUfCL 232'etvl Material:
&mbN S7EEL ProductFomr:
tJ IzOUbYT Nominal Thickness:
I .Of' 8 2.5 " Instrument lnsburnent Make: PAN A M mr<lLs Instrument Model: 2 b 0 L PL Q 5 tnstrument SN: 9 3 I 2 9307 Instrument Display: CRT ( ) Digital (4 Horizontal Linearity Performed?:
Yes ( ) No (tf E/C 1-1 Calibration Block SerialNumbec E/C 1-2 Calibration Blodc Material:
cAR8Pd SfW L Produd Form: W e&U 6 &7 Block Temperature:
7 s OF miheSes: O.BO~: a0W, j85m", zooo", zsai 3,601 M&TE Used? Yes ( ) No (4 M&TE Description
/ W: Calibration Times InitialCalibration:
0000 Check: hf/A Clkk MIA Check: &/A Ch& dh Final: rosa Sketch and Examination Results: E E A E ,
i k Q " 0 c , t, Vermont Yankee Work Order No.: 00- go3 7 Visual Examination Report Form VT-1, Containment Surfaces (WE) Procedure NolRev.:
/vE 80 75 ,&E VI 1 . Page / of 6 Date: 5-9-0/ Comoonent
~~~ . . ~ ~ Visual Aids I Illumination Level Check I -- I Level: 77' Date: 9-9-@/ Level: Ah- Date: &/A. .5/ttf I Examiner Reviewer:
0.d- Date: V Reviewer:
Date: d. Date: fi/'-O/ Evaluation Required?
VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1 c .-'
- ~ Vermont Yankee -. - - WNEF. 8045.04 NE 8045 Original Page t of 1 LPC #1 Level: Date: :miner: :viewer: viewer: .. Date: .5:'."& Date: .../R VYNEE 8045.04 NE 8045 Original Page 1 of 1 LPC #?
. . 'L 9 hr k P
- EVALUATION OF DATA PROWED BY VT-I, CONTAINMENT SURFACES (IWE) DATA SHEET No: 804541-019 During RFO 21 IWE examinations it was discovered tbat the Joint Seal at the concrete to steel interface on the 238' level ofthe containment had failed and there was evidence of corrosion in areas ofthe seal. As a teSulta portion of the circumference of the seal interface area was declared as augmented The joint seal itselfwas also scheduled for replacement dmingRF0-22.
At the start 0fRFO-22 the examiners performed the reqmd VT-1 mons ofthe augmented area at the joint seal to &ternme - if any changes had occuned during the last operating cycle. The results ofthat exmination reveal NO changes identified in the an- area Atter the W-1 emnhtions were complete the process began for the joint seal replacement A band of paint was removed from the concrete floor up &e steel containment appximately 6" wide for the full circumference.
Tbe recessed area for the joint seal was also cleaned m preparation for the new seal installation.
At this point a VT-3 examinatom was performed which identified a band of pitting that covered much ofthe 360degree circumference.
A more detailed VI'-1 was ordered by the Responsiie Engineer to detail this area prior to paint/seal htdlation.
This joint seal area was identified as an issue in the early 1990's. (ER-99-1594 deals with the issues Erom the 1990's resolutioa).
In 1993 the joint sed area was cleaned andpainted so as to fbm a paintjoint seal at the concrete to seal interhce.
The areas identified during the -21 examinations were areas that were experieming evidence of corrosion and paint loss in this paintedjoint area. Some ofthe paint was still intact and providing adequate protection for the steel it was covering.
The new areas of pittiugin the area of thejoint seal are asam of the coatingremod to white metal in this area This area was not previously identified during RFO-21 because it was an old area of pitting that hadbeen covered by the 1993 coatiug and hadnot experienced any further degradation.
As aresult ofthe coatings being mmpletely removed ffom this joint area, this VT-1 examination was able to map this region without the impedance ofany obstruction.
The areas of pitting are isolated to the general area ofthe joint seal interface between the con& and the steel. The pitting subsides as it mom up or down out of thejoint seal area. This was evi&nt whena portion ofthe steel slnface was exposed as a result of theremaVal ofa concretechip.
'The under slaface area exposed wasapproximately 9" wide and 3" deep inacrescent shape. The wod case pitting is isolated to aband in the joint seal area from alqmximately
!4" wide to approximately 1" wide andis descrii in the report as areas with general wastage and connected pitting All codon identified within this report is Boundedby evaluation VYM 99/139. Based on this evaluation all areas are well Withinthe reqkddesigu base metal thicknesses and are accqtable for continued operation as is.
-- I- Levels Datefl/y-dl Level Nh Date 'h Vermont Yankee Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (IWE) Evaluation Required?
0 Yes I No Work Order NO.:^ -065i3 Procedure N o/R ev.:mg& 97 Page 1 of 1 Date: 5-f y-d/ nation Level Check I PhotolSketch NIA Remarks ~ -r=T 3ther (Describe):
3eviewer:
Date Y//l//d/ ieviewer:
Mi Date d& Y Date J4/%8/ WNEF 8047.08 NE 8047 Original Page 1 of 1 61 Data Sheet No: gM Vermont Yankee Containment Surfaces (WE) Visual Examination Report Form for VT-3 Procedure NolRev.: ME80 974% 0 Page / of I Date:,F-Y-o/
Component.&HL -Z;3rc<~~
AUK* Ed* +-W ' Component ID:M ~ -@?-#-&&*7#/&W*dT
- A Drawing NolRev,: 6 za ' ' /o Visual Aids 0 Binoculars Li ht Source [Describe)
Adm&r Illumination Card/Number r/Y 8 Coated Surface? Cl Yes m No Cracking Flaking Blistering Peeling Wear Discoloration Pitting Acceptable Corrosion ACtS-?*W Arc Strikes <A&f-9-../
<- Dents 38 5-P*d/ Deformation flz 5941 Gouges Other (Describe}:
&55-9-0/ - Evaluation Required?
~~es @NO VYNEF 8047.07 NE 8047 Original Page 1 of 1