From: Michael Mulligan [steamshovel2002@yahoo.com] Sent: Monday, December 08, 2008 2:39 PM To: James Kim
Subject:
Re: Vermont Yankee 2.206 Petition - PRB Teleconference (11/25-Tuesday at 10:00am)(2)
James, This might better explain why i think the VY Diesel Generators
are to small.
I additionally have broader concerns that Fairbanks Morse is a unreliable service provider...the nuclear plant emergency Diesel
Generator. I am thinking about recent part 21 issues.
What I get out of reg guide 1.9 is that nuclear power plants are
suppose to stay within their continuous rating under
all conceivable design accident load conditions...all the loads based on normal and emergency procedures are supposed to be below the continuous rating. Further, the DBA load
is supposed to be 5% to 15% below the continuous rating. It is noted that many plant's operated by procedure higher than the continuous rating which is very troublesome.
VY and the NRC are just not operating conservatively.
This raises issues with what size Diesel Generator capacity
would be necessary with the new plants. I am thinking the design accident bus load should be 25% to 40% below the continuous rating of the DG when purchasing it.
I futher think we need a IG investigation...a case study with how not to purchase DGs...how a plant(s) would be forced to live with inadiquate DG's for the whole life time of operation.
OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.9 APPLICATION AND TESTING OF SAFETY-RELATED DIESEL GENERATORS IN NUCLEAR POWER PLANTS
The below conversation thoroughly cover my issues. It occurs on page 9 and 10 ...the whole conversation discusses what we
thought about the recent component inspection at VY.
http://www.topix.net/forum/source/brattleboro-reformer/T0TIINT9ROEGUN6D0 Thanks, mike mulligan Hinsdale, NH
E-mail Properties Mail Envelope Properties (376406.15656.qm)
Subject:
Re: Vermont Yankee 2.206 Petition - PRB Teleconference (11/25-Tuesday at 10:00am)(2)
Sent Date: 12/08/2008 2:39:33 PM Received Date: 12/08/2008 2:39:33 PM From: Michael Mulligan
Created By: steamshovel2002@yahoo.com
Recipients:
James.Kim@nrc.gov (James Kim)
Tracking Status: None
Post Office: web58703.mail.re1.yahoo.com
Files Size Date & Time
MESSAGE 11547 12/08/2008
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False