(External_Sender) Palisades Nuclear Plant Assessment of Frazil Ice for Mitigating Strategies
ML16174A171
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/21/2016
From: Erickson J
Entergy Nuclear Palisades
To: John Hughey
Japan Lessons-Learned Division
References
Download: ML16174A171 (4)


Text

1 NRR-PMDAPEm Resource From:ERICKSON, JEFFREY S <JERICKS@entergy.com>

Sent: Tuesday, June 21, 2016 1:03 PM To: Hughey, John Cc: Hardy, Jeffery A

Subject:

[External_Sender] Palisades Frazil Ice Discussion Attachments:

Frazil Ice Discussion.pdfJohn, As requested, attached is a discussion that addresses the potential for frazil ice formation during a beyond-design-basis-external-event at the Palisades Nuclear Plant.

Please let me know if you need any additional information.

Thanks, Jeff Erickson Regulatory Assurance

Palisades Nuclear Plant 269-764-2375 Hearing Identifier: NRR_PMDA Email Number: 2913 Mail Envelope Properties (AACFD50AA516704FAADD585E0320491732790A30)

Subject:

[External_Sender] Palisades Frazil Ice Discussion Sent Date: 6/21/2016 1:02:32 PM Received Date: 6/21/2016 1:02:48 PM From: ERICKSON, JEFFREY S Created By: JERICKS@entergy.com Recipients: "Hardy, Jeffery A" <jhardy@entergy.com>

Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov>

Tracking Status: None Post Office: JDCXMETSP003.etrsouth.corp.entergy.com

Files Size Date & Time MESSAGE 336 6/21/2016 1:02:48 PM Frazil Ice Discussion.pdf 12112 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

1 of 2Palisades Nuclear Plant6/21/16Entergy Nuclear Operations, Inc.Response to NRC Request for Frazil Ice InformationFrazil ice is a surface and sub-surface phenomena associated with large, open bodies of water underextremely cold, windy, and turbulent conditions. These conditions result in emulsified ice crystalsforming in the subcooled surface and subsurface of the water. NEI 12-06, "Diverse and Flexible CopingStrategies (FLEX) Implementation Guide," states that the potential for frazil ice formation during abeyond-design-basis-external-event (BDBEE) should be addressed by licensees in their response to NRCOrder EA-12-049.The Palisades Nuclear Plant draws water from Lake Michigan. The water enters an intake crib in thelake, passes through a buried intake line (about 3000 feet in length), and then empties into the plant's intake structure. At the intake structure, the line divides into two flow paths, one entering the north and the other entering the south intake structure bays, and then passes through trash racks and traveling screens in the bays. Two dilution water pumps and one diesel fire pump take suction from thisportion of the intake structure. Water supplying the service water pumps and the remaining fire water pumps flows from the two intake bays through sluice gates into the service water pump intake bay.During a BDBEE, the FLEX pumps are deployed in Phases 2 and 3 to take suction from the north or thesouth intake structure bay, at a location immediately upstream of the trash racks and traveling screens, outside the screen house. Some of the water drawn by the Phase 2 FLEX pump is recirculated back into the bay. Water can also be recirculated during Phase 3 FLEX pump operation as well.Frazil ice is not considered to be a hazard to FLEX equipment deployed during a BDBEE for the following reasons:The intake crib, intake line, and intake structure were originally designed for the much largerflow rates required to support once-through condenser cooling. The once-through cooling waslater converted to a closed loop cooling tower design early in the plant's life. As a result, the capacity of the plant's intake from Lake Michigan greatly exceeds the combined capacity of all the pumps that use the lake as a source of water and results in much lower flow velocities in the intake system. This inhibits the formation of frazil ice at the intake crib and in the intake structure.Upon the loss of power during the BDBEE, the service water, dilution water, and fire waterpumps would all be stopped, greatly reducing the flow of the colder lake water into the intakestructure bays and further lowering the probability of water containing entrained frazil ice crystals migrating into the bays.With the drastically reduced water flow from the lake upon a loss of power, the water velocityfrom the intake crib into the intake structure bays would be extremely slow, such that turbulentconditions within the intake structure bays would not exist. Moreover, the low flow conditions in the bays would, under subcooled conditions, likely result in the formation of a surface ice layer. The surface ice layer would prevent the mixing of supercooled surface water with the water below, preventing the formation of emulsified ice crystals in the subsurface of the water.

2 of 2During normal operations, plant procedures direct the operators to take actions to prevent frazilice formation in the intake structure whenever frazil ice conditions exist. The actions normallyinvolve diverting warm water from the circulating water mixing bay to the intake structure, inthe vicinity of the suction of the FLEX pumps. Therefore, if the conditions for frazil ice formationexist at the start of a DBDEE event, the temperature of the water in the intake structure wouldbe above freezing. Since frazil ice formation requires supercooled water, the initial BDBEEconditions, in which warm water recirculation would be in service, would inhibit the formationof frazil ice in the intake structure bay.As stated above, some of the water drawn by the Phase 2 FLEX pump is recirculated back into an intake structure bay. Water can also be recirculated during Phase 3 FLEX pump operation aswell. This water would be at a slightly elevated temperature, due to pump heat, and wouldwarm the water in the vicinity of the FLEX pump suction.

1 NRR-PMDAPEm Resource From:ERICKSON, JEFFREY S <JERICKS@entergy.com>

Sent: Tuesday, June 21, 2016 1:03 PM To: Hughey, John Cc: Hardy, Jeffery A

Subject:

[External_Sender] Palisades Frazil Ice Discussion Attachments:

Frazil Ice Discussion.pdfJohn, As requested, attached is a discussion that addresses the potential for frazil ice formation during a beyond-design-basis-external-event at the Palisades Nuclear Plant.

Please let me know if you need any additional information.

Thanks, Jeff Erickson Regulatory Assurance

Palisades Nuclear Plant 269-764-2375 Hearing Identifier: NRR_PMDA Email Number: 2913 Mail Envelope Properties (AACFD50AA516704FAADD585E0320491732790A30)

Subject:

[External_Sender] Palisades Frazil Ice Discussion Sent Date: 6/21/2016 1:02:32 PM Received Date: 6/21/2016 1:02:48 PM From: ERICKSON, JEFFREY S Created By: JERICKS@entergy.com Recipients: "Hardy, Jeffery A" <jhardy@entergy.com>

Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov>

Tracking Status: None Post Office: JDCXMETSP003.etrsouth.corp.entergy.com

Files Size Date & Time MESSAGE 336 6/21/2016 1:02:48 PM Frazil Ice Discussion.pdf 12112 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

1 of 2Palisades Nuclear Plant6/21/16Entergy Nuclear Operations, Inc.Response to NRC Request for Frazil Ice InformationFrazil ice is a surface and sub-surface phenomena associated with large, open bodies of water underextremely cold, windy, and turbulent conditions. These conditions result in emulsified ice crystalsforming in the subcooled surface and subsurface of the water. NEI 12-06, "Diverse and Flexible CopingStrategies (FLEX) Implementation Guide," states that the potential for frazil ice formation during abeyond-design-basis-external-event (BDBEE) should be addressed by licensees in their response to NRCOrder EA-12-049.The Palisades Nuclear Plant draws water from Lake Michigan. The water enters an intake crib in thelake, passes through a buried intake line (about 3000 feet in length), and then empties into the plant's intake structure. At the intake structure, the line divides into two flow paths, one entering the north and the other entering the south intake structure bays, and then passes through trash racks and traveling screens in the bays. Two dilution water pumps and one diesel fire pump take suction from thisportion of the intake structure. Water supplying the service water pumps and the remaining fire water pumps flows from the two intake bays through sluice gates into the service water pump intake bay.During a BDBEE, the FLEX pumps are deployed in Phases 2 and 3 to take suction from the north or thesouth intake structure bay, at a location immediately upstream of the trash racks and traveling screens, outside the screen house. Some of the water drawn by the Phase 2 FLEX pump is recirculated back into the bay. Water can also be recirculated during Phase 3 FLEX pump operation as well.Frazil ice is not considered to be a hazard to FLEX equipment deployed during a BDBEE for the following reasons:The intake crib, intake line, and intake structure were originally designed for the much largerflow rates required to support once-through condenser cooling. The once-through cooling waslater converted to a closed loop cooling tower design early in the plant's life. As a result, the capacity of the plant's intake from Lake Michigan greatly exceeds the combined capacity of all the pumps that use the lake as a source of water and results in much lower flow velocities in the intake system. This inhibits the formation of frazil ice at the intake crib and in the intake structure.Upon the loss of power during the BDBEE, the service water, dilution water, and fire waterpumps would all be stopped, greatly reducing the flow of the colder lake water into the intakestructure bays and further lowering the probability of water containing entrained frazil ice crystals migrating into the bays.With the drastically reduced water flow from the lake upon a loss of power, the water velocityfrom the intake crib into the intake structure bays would be extremely slow, such that turbulentconditions within the intake structure bays would not exist. Moreover, the low flow conditions in the bays would, under subcooled conditions, likely result in the formation of a surface ice layer. The surface ice layer would prevent the mixing of supercooled surface water with the water below, preventing the formation of emulsified ice crystals in the subsurface of the water.

2 of 2During normal operations, plant procedures direct the operators to take actions to prevent frazilice formation in the intake structure whenever frazil ice conditions exist. The actions normallyinvolve diverting warm water from the circulating water mixing bay to the intake structure, inthe vicinity of the suction of the FLEX pumps. Therefore, if the conditions for frazil ice formationexist at the start of a DBDEE event, the temperature of the water in the intake structure wouldbe above freezing. Since frazil ice formation requires supercooled water, the initial BDBEEconditions, in which warm water recirculation would be in service, would inhibit the formationof frazil ice in the intake structure bay.As stated above, some of the water drawn by the Phase 2 FLEX pump is recirculated back into an intake structure bay. Water can also be recirculated during Phase 3 FLEX pump operation aswell. This water would be at a slightly elevated temperature, due to pump heat, and wouldwarm the water in the vicinity of the FLEX pump suction.