IR 05000244/2016201

From kanterella
Revision as of 18:26, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Robert Emmett R.E. Ginna Nuclear Power Plant - NRC Security Inspection Report 05000244/2016201
ML16287A695
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/17/2016
From: Joseph Willis
NRC/NSIR/DSO/DDSO/SPEB
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
David Hostetter
References
IR 2016201
Download: ML16287A695 (2)


Text

ber 17, 2016

SUBJECT:

ROBERT EMMETT (R.E.) GINNA NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000244/2016201

Dear Mr. Hanson:

On September 23, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your R.E. Ginna Nuclear Power Plant. On September 29, 2016, the NRC inspectors discussed results of this inspection with Mr. William Carsky, R.E. Ginna Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."

The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure

, this transmittal document is decontrolled. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response.

Sincerely,

/RA/

Joseph H. Willis, Acting Branch Chief

Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket No. 50-244 License No. DPR-18 Nonpublic Enclosure: Inspection Report 05000244/2016201 w/Attachment: Supplemental Information

cc w/ enclosure: John Scalzo, Site Security Manager Joseph E. Pacher, Vice President

ML16287A695 Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 Cover Letter Only: SUNSI Review Complete By: DJH Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RI NSIR/DSO/SPEBNAME D. Hostetter J. Clark D. Cardenas R. McKinley J. Wills SIGNATURE DATE 09/ 29 /2016 10/ 13 /2016 09/ 30 /2016 10/ 12 /2016 10/ 17 /2016