ML17037B581
| ML17037B581 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/30/1978 |
| From: | Dise D Niagara Mohawk Power Corp |
| To: | Case E Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B581 (4) | |
Text
RFGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>DISTRIBUTION FOR INCOMING MATERIAL 50-220 REC: CASE E G NRC QRG: DISE D P NIAGARA MOHAWK PWR DOCDATE: 01/30/78 DATE RCVD: 02/02/78 DOCTYPE: OTHER NOTARIZED:
NO
SUBJECT:
FORWARDING FINAL REPT DESCRIBING QUALIFICATION TFST PROGRAM FOR UNIT 1,ELECT CONNECTOR/
ENTITLED: "LOCA SIMULATION TEST OF ELECTRICAL PENETRATION CONNECTOR ASSEMBLIES" DTD DEC 1977.COPIES RECEIVED LTR 1 ENCL 1 PLANT NAMF: NINE MILE PT-UNIT 1 REV IEI JER INI T I AL: X JM DISTRIBUTOR INITIAL: DISTRIBUTIQN OF THIS MATERIAL IS AS FOLLOWS R~~W/7 ENCL FOR ACTION GENFRAL DISTRIBUTION FOR AFTER ISSUANCE QF OPERATING LICENSE.<DISTRIBUTION CODE A001)BRANCH CH INTERNAL: EXTERNAL: REG FILE+4W/ENC HANAUER+4W/ENCL E I SENHUT++W/ENCL BAER4+W/ENCL'RIMES++W/ENCL J.MCGOUGH)+W/ENCL f(LPDR S OSWEGO, fNY+%W/ENCL TIC44W/ENCL'SIC4+W/ENCL ACRS CAT B+4W/16 ENCL NRC PDR~+W/ENCL
" OELD+4ILTR ONLY CHECK++W/ENCL SHAO+~W/ENCL BUTLER+4W/ENCL J.COLLINS'W/ENCL DISTRIBUTION:
LTR 40 ENCL 39 SIZE: 1P+19P THE END CONTROL NBR: 780330047 I
),,',>i,,"',,)IiV, It(')ii~,Pi i'i'fltI I ti>>/f1 l,'l[)I'IAGARA MOHAWK POWER CORPORATION
>IilUaii NIAGARA'~MOHAWK 300 ERIE BOULEVARD, WEST SYRACUSE, N.Y.13202 January 30, 1978 Mr.Edson G.Case, Acting Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mk.P]g y I*~'~IO'O4t l4 A H Cy P Re: Nine Mile Point Unit 1 Docket No.50-220 DPR-63
Dear Mr.Case:
Enclosed is the final report describing the qualification test program for the Nine Mile Point Unit 1 electrical connectors.
The electrical connectors satisfactorily passed the simulated loss of coolant accident environment test.My November 30, 1977 letter indicated that an additional test of the electrical connectors would be performed simulating a loss of coolant environment with radiation effects.This test is scheduled to be completed in March, 1978, and the test report will be submitted by April 1, 1978.Very truly yours, NIAGARA MOHAWK POWER CORPORATION Donald P.Disc Vice President-Engineering 7gQ33QQ47/szd Enclosure I