Owner'S Activity Report for Unit 2 Twentieth Refueling Outage
ML18170A062
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/19/2018
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-18-048
Download: ML18170A062 (7)


Text

acific Gas and Electric Company" June 19, 2018 PG&E Letter DCL-18-048 Paula Gerfen Stat i on Director Diab l o Canyon Power Plant Ma il Code 1 04/5/502 P.O. Box 56 Av il a Beach, CA 93424 8 0 5.545.4596 I nterna l: 69 1.4596 Fax: 805.545.4234 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.4 Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Owner's Activity Report for Unit 2 Twentieth Refueling Outage In accordance with American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report for inservice inspection (lSI) activities performed at Diablo Canyon Power Plant through the completion of the Unit 2 Twentieth Refueling Outage. Code Case N-532-5 is used as an alternative to the requirements of ASME Section XI, Article IWA-6000, as listed in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1 ,"Revision 18, and approved in accordance with 10 CFR 50.55a(b)(5).

There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal.

If you have any questions regarding the information enclosed, or other lSI program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241. dqmg/6192/50942981-1 Enclosure cc/enc: Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager State of California, Pressure Vessel Unit A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Pacific Gas and Electric Company Diablo Canyon Power Plant Enclosure PG&E Letter DCL-18-048 Owner's Activity Report for Unit 2 Twentieth Refueling Outage DIABLO CANYON POWER PLANT

Introduction:

UNIT2 REFUELING OUTAGE: 2R20 Operating License No. DPR-82 USNRC Docket No. 50-323 OWNER'S ACTIVITY REPORT Rev. 0 Contents:

OAR-1 Report Number: DCPP-2R20:

Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service. Table 2: Abstract of Repair/Replacement Activities Required for Continued Service. Prepared By: Date 6/r:z/tsr Reviewed By:

Date -6 z/1 8 James E. Hill, lSI Specialist Thomas L.

lSI Specialist

_.) Approved By: Document Date: June 12, 2018 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Page 1 of 5 INTRODUCTION lnservice inspection (lSI) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) Unit 2 was completed during the twentieth refueling outage (2R20) from February 2018 through March 2018. 2R20 was the first outage in the first period within the fourth 1 0-year lSI interval.

This Owner's Activity Report, OAR-1, complies with the provisions of Code Case N-532-5 as approved by Regulatory Guide 1.147, Revision 18. The OAR-1 Report covers any mid cycle work completed after June 14, 2016 and any applicable 2R20 work completed prior to and including April 22, 2018. Page 2 of 5 FORM OAR-1 OWNERS ACTIVITY REPORT --DCPP-2R20 Report Number DCPP-2R20 Plant Diablo Canyon Nuclear Power Plant. P.O. Box 56, Avila Beach, California 93424 UnitNo.

__

Refueling outage no. 2R20 Current inspection inteNal IWB I IWC I IWD I IWF -4th IWE I IWL-2nd (1st, 2nd, 3rd, 4th, other) Current inspection perio.d __

___ ___!I-=--W-'--"E=-/'-I'-'-W..!.CL=-----'3=r-=d--------

(1 st, 2nd, 3rd) Edition and Addenda* of Section XI applicable to the inspection plans

--'2=0=0:...:.7_,E=d=--c._/

2=0=0=8::....:A'-'-d=d=----

IWE/IWL 2001 Ed I 2003 Add Date and revision of inspection plans IWB I IWC I IWD I IWF --4/18/2017 Rev. 0 IWE I IWL --11/4/10 Rev. 0 Edition and addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans No Difference Code Cases used: N-532-5 N-706-1 N-722-1 N-740-2 N-770-2 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R20 (refueling outage no) conform to the requirements of Section XI. Date _

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be arising f!om or connected with this inspection.

Date __:::......:.a

!l_rz--.::....._J,_, B __ Page 3 of 5 FORM OAR-1 OWNERS ACTIVITY REPORT --DCPP-2R20 TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Accepted for continued use with: Line 2-45-4 1) scope exams of (17) CAT R-A Weld, WIC-45A. additional welds in 2R20. ITEM R1.11 Rejectable UT indication. (SAPN 50966007 Task-10).

SAPN 50966007 2) Evaluation for continued service: (SAPN 50966007 Task-20).

Accepted for continued use with: Line 2-46-4 1) Expanded scope exams of (7) Weld, RB-46-7. additional welds in 2R20. Rejectable UT indication. (SAPN 50966526 Task-7). SAPN 50966526 2) Evaluation for continued service: (SAPN 50966526 Task-14).

Accepted for continued use with: 1) 1st successive UT exam of flaw identified in 2R19. Line 2-109-14 Results: No flaw growth. Weld, WIB-245' 2) Application of Structural Weld Overlay (SWOL) during 2R20 2R19 Rejectable UT indication

{Order/Op 60106141-0010).

SAPN 50852155 Used Code Case N-740-2 per alternative request, REP-RHR-SWOL approved January 2, 2018 (ML17338A131) J Page 4 of 5 FORM OAR-1 OWNERS ACTIVITY REPORT --DCPP-2R20 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number Replaced Spherical Bearing 3 Support 2048-4SL damaged during removal of 2/20/2018 60102685-0170 snubber for testing 2 MS-2-RV-14 Off-site vendor replaced disc due 6/22/2017 60091102-0400 to failed seat leakage test. Spare Main Steam Off-site vendor replaced disc due : 2 Safety valve to failed seat leakage test. 6/22/2017 60091102-0550 Spare RPV Head Vent Rebuilt valve due to failed stroke test. 1 Spool Piece valve s/n SAPN 50852378 8/24/2017 60091061-0030 7 of assy, SOV-1 Replaced degraded disc ..... RPV Head Vent Spool Rebuilt valves due to failed stroke test. 1 Piece valve s/n 9 & SAPN 50853095 8/9/2016 60091062-0030 12 of assy, SOV-6 Replaced degraded discs RPV Head Vent Spool Replaced valve Spool Piece due 1 Piece valve assy, to failed seat leakage tests 4/12/2018 60091246-0010 SAPN 50856466 SOV-5 SOV-5 replaced with SOV-1 1 Line 2-109-14 Application of Structural 2/27/2018 60106141-0010 Weld, WIB-245 Weld Overlay (SWOL) RCP2-4 Upper Replaced Channel Head due to 3 Bearing Oil Cooler corrosion of gasket sealing 2/27/2018 68049023-0800 surfaces Channel Head SAPN 50965711 Replaced Bonnet and bolting due 2 CVCS-2-8460A to gasket leakage and 2/21/2q18 6009 2346-0012 Boric Acid Corrosion SAPN 50862671 Modified base plate and replaced corroded anchor bolting caused ' 3 Support 414-495R & by corrosive, salt water 3/02/2018 60095016-0010 414-496R environment.

SAPN 50876611 Page 5 of 5