Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2019005)
ML19240A864
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/28/2019
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Payne F
FirstEnergy Nuclear Operating Co
References
IR 2019005
Download: ML19240A864 (6)


Text

August 28 , 2019 Mr. Frank Payne Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Reg Affairs-A210 10 Center Road, P.O. Box 97 Perry, OH 44081-0097 SUBJECT: UPDATED INSPECTION PLAN FOR PERRY NUCLEAR POWER PLANT (REPORT 05000 440/2019005)

Dear Mr. Payne:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 21 , for the Perry Nuclear Power Plant

. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"), and other changes to the baseline inspection program described in SECY-19-0067, "Recommendations for Enhancing the Reactor Oversight Process

." Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As shown in the attached schedule, the NRC will conduct a Biennial Problem Identification and Resolution Inspection during the period of November 4 through November 22, 2019, using Inspection Procedure (IP) 71152B and, during the period of April 20 through May 8, 2020, a Design Bases Assurance Inspection (Team) using IP 71111.21M

. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Please contact me at 630-829-9827 with any questions you have regarding this letter.

Sincerely,

/RA/ Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 50-440 License No

. NPF-58 Enclosure:

Inspection Plan cc: Distribution via LISTSERV