Responds to NRC 800729 Ltr Re Violations Noted in IE Insp Repts 50-272/80-14 & 50-311/80-10.Corrective Actions: Training Group Is Developing Formal Means of Evaluating Operator Response on Simulator
ML18082B310
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/19/1980
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B309 List:
References
NUDOCS 8010100061
Download: ML18082B310 (3)


See also: IR 05000272/1980014

Text

.erick W. Schneider

Vice President

Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373

Production

  • August 19, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection

and Enforcement

Region 1 U.S. Nuclear Regulatory

Commission

631 Park Avenue King of -Prussia, PA , 19406 Attention:

Mr. Eldon J. Brunner, Chief Reactor Operations

and Nuclear Support Branch Gentlemen:

COMBINED NRC INSPECTION

50-272/80-14

AND 50-311/80-10

SALEM GENERATING

STATION, UNITS NOS. l AND 2 We have reviewed the report of your inspection

conducted

by Dr. L. H. Bettenhausen

during the period June 18-20, 1980. Our response to the two items of noncompliance

identified

in Appendix A of your report is as follows: Item 1, Infraction

10 CFR 55, Appendix A, Requalification

Programs for Licensed Operators

of Production

and Utilization

Facilities, states, in part, "3. On-the-job

training.

The requalification

program shall include on-the-job

train;i,ng

so that:" "3c. Each licensed operator and senior operator is cognizant

of facility design

    • . " Contrary to the above, no evidence was found that all licensed operators

and senior operators

review facility design changes nor is there a system in place to insure these reviews occur.* Reply to Item 1 1. -A formal procedure

was being developed

to address this area; however, for a while we had to postpone completion

of this procedure

due to a more pressing priority.

80101000(,/

Boyce H. Grier, Dir. -2 -8-19-80 work has resumed on the training procedure.*

Design change information

will be transmitted

to the Training group via an updated computer printout and through distribution

of the SORC minutes. The training group will evaluate each design change and issue a written explanation

to each licensed operator or conduct formal classroom

training as appropriate.

Design change information

is presently

being transmitted

to the licensed operators

by issuance of a

This action will continue until the procedure

is approved and implemented.

3. The approval and implementation

of the training procedure

will prevent recurrence

of this item. 4. Date for full compliance

is September

30, 1980. Item .2 Deficiency

Salem Generating

Station Training Procedure

10, Revision 2, NRC "Licensed

Operator Requalificatl.on

Program", paragraph

IV quires an individual

training folder maintained

for each licensed operator and senior operator.

These folders shall contain, in part, records. of simulator

training received.

The 12 October 1979 letter from Mr. H. J. Midura to Mr. Paul Collins of Operator Licensing

Branch, NRC, indicated

that simulator

training would still be required as part of the Unit 1 modified requalification

program. Contrary to the above, no record of simulator

training, other than reactivity

manipulations, was found in the records of either the three licensed operators

or the *four senior operators

reviewed.

Reply to Item 2 1. The NRC has, in the past, expressed

concern as to the method used to evaluate operator response to simulated

accidents.

In response, PSE&G requested

the various simulator tors in other utilities

to evaluate our operators ance during simulator

training at those utilities.

These instructors

have been reluctant

to evaluate operators ployed by another utility, unless an acceptance

criteria is established.

2. The training group is developing

a formal means of ating operator response on the simulator.

A check list will be utilized to document this evaluation.

The completed

check lists will remain in the individual's

training folder. 3. The completion

of the Salem simulator

will allow more fective evaluation

of the performance

of our operators.

.. Boyce H. Grier, Director -3 -4. The formal*. procedure

and check list will be established

by October 15, 1980. If you have any further questions

with regard to this

we will be pleased to discuss them with.you.

cc Director, Office of Inspection

and Enforcement