EN-06-011, Tennessee Valley Authority
ML060940173
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/04/2006
From: Nolan M C
NRC/OE
To:
Trocine L
References
EA-05-169 EN-06-011
Download: ML060940173 (2)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTIONApril 4, 2006EN-06-011OFFICE OF ENFORCEMENTNOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTIONLicensee:Tennessee Valley Authority(EA-05-169)Watts Bar Nuclear Power Plant Docket No. 05000390

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OFVIOLATIONThis is to inform the Commission that a Notice of Violation associated with a White significancedetermination process finding will be issued on or about April 7, 2006, to Tennessee ValleyAuthority as a result of inspections at the Watts Bar Nuclear Power Plant. This White finding, an issue with low to moderate increased importance to safety, involved a challenge to reactor coolant system (RCS) integrity by multiple pressurizer power-operated relief valve (PORV)actuations and a challenge to RCS inventory control by the loss of RCS coolant via the openPORVs which occurred on February 22, 2005, during transition to solid plant operations. From a defense-in-depth perspective, unlike most other accident initiators that can lead to core damage, a low temperature overpressure event could result in the reactor pressure vessel being unavailable for either subsequent recovery of the reactor core or as an additional barrier for fission product retention.A Notice of Violation is included because this White finding was associated with a violation ofTechnical Specification 5.7.1.1 and Procedure GO-6, Unit Shutdown from Hot Standby to ColdShutdown, in that TVA personnel failed to slowly raise charging flow to fill the pressure at lessthan 30 gallons per minute a required by procedure.It should be noted that the licensee has not been specifically informed of the enforcementaction. The schedule of issuance and notification is:Mailing of Final Significance DeterminationApril 7, 2006Telephone Notification of LicenseeApril 7, 2006The State of Tennessee will be notified.Contacts:L. Trocine, OE, 301-415-2319 C. Nolan, OE, 301-415-3360 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTIONDistribution

OWFN Chairman DiazComm. McGaffigan Comm. Merrifield Comm. Lyons Comm. JaczkoSECYOCA PA IPOWFN EDODEDR DEDE OE OGC NRR NSIR OI SPTWFN OCFOOP CENTER NMSS OIG OCIO RES ACRSRegional OfficesRI RIIRIII RIVMAILADAMSFile Name: E:\Filenet\ML060940173.wpdADAMSML060940173OE:ESOE:CLTrocineCNolan 03/31/0504/04/06